Construction estimating :: a step-by-step guide to a successful estimate /
Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, fail...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
New York :
Momentum Press,
©2012.
|
Schlagworte: | |
Online-Zugang: | DE-862 DE-863 |
Zusammenfassung: | Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, failures" and scan the various responses. You will learn that according to the Surety Information Office the contractor failure rate is about 25% for trade contractors and 22% for heavy, highway contractors. These figures have been fairly constant for years. You will also learn that poor estimating is a major cause of these failures. |
Beschreibung: | Includes index. |
Beschreibung: | 1 online resource |
ISBN: | 160650293X 9781606502938 |
Internformat
MARC
LEADER | 00000cam a2200000Ma 4500 | ||
---|---|---|---|
001 | ZDB-4-EBA-ocn793581614 | ||
003 | OCoLC | ||
005 | 20250103110447.0 | ||
006 | m o d | ||
007 | cr |n|---||||| | ||
008 | 120206s2012 nyu o 001 0 eng d | ||
040 | |a MNU |b eng |e pn |c MNU |d TXA |d OCLCO |d YDXCP |d OCLCQ |d N$T |d NYMPP |d E7B |d OCLCF |d OCLCQ |d AGLDB |d CPO |d UPM |d STF |d OCLCQ |d VTS |d M8D |d OCLCO |d OCLCQ |d OCLCO |d OCLCL |d DXU | ||
020 | |a 160650293X |q (electronic bk.) | ||
020 | |a 9781606502938 |q (electronic bk.) | ||
020 | |z 9781606502921 |q (softcover) | ||
020 | |z 1606502921 |q (softcover) | ||
035 | |a (OCoLC)793581614 | ||
050 | 4 | |a TH435 |b .S34 2012 | |
072 | 7 | |a TEC |x 005040 |2 bisacsh | |
082 | 7 | |a 692/.5 |2 23 | |
049 | |a MAIN | ||
100 | 1 | |a Schmid, Karl F. | |
245 | 1 | 0 | |a Construction estimating : |b a step-by-step guide to a successful estimate / |c Karl F. Schmid. |
260 | |a New York : |b Momentum Press, |c ©2012. | ||
300 | |a 1 online resource | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
588 | 0 | |a Print version record. | |
500 | |a Includes index. | ||
505 | 0 | |a 1. Initial assessment -- Initial assessment checklist. | |
505 | 8 | |a 2. Work analysis -- Work analysis checklist -- Value engineering. | |
505 | 8 | |a 3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling. | |
505 | 8 | |a 4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses. | |
505 | 8 | |a 5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization. | |
505 | 8 | |a 6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners. | |
505 | 8 | |a 7. Glossary -- Index. | |
520 | 3 | |a Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, failures" and scan the various responses. You will learn that according to the Surety Information Office the contractor failure rate is about 25% for trade contractors and 22% for heavy, highway contractors. These figures have been fairly constant for years. You will also learn that poor estimating is a major cause of these failures. | |
650 | 0 | |a Building |x Estimates. |0 http://id.loc.gov/authorities/subjects/sh85017698 | |
650 | 6 | |a Construction |x Devis estimatifs. | |
650 | 7 | |a TECHNOLOGY & ENGINEERING |x Construction |x Estimating. |2 bisacsh | |
650 | 7 | |a Building |x Estimates |2 fast | |
653 | |a Construction bidding | ||
653 | |a Construction estimating | ||
653 | |a Construction estimating: overhead and indirect costs | ||
653 | |a Construction estimating: beyond direct costs | ||
653 | |a Construction estimating: project scheduling | ||
653 | |a Construction estimating: work analysis | ||
653 | |a Construction estimating: assigning costs | ||
653 | |a Construction estimating: Value Engineering | ||
653 | |a Construction estimating: subcontractor selection | ||
653 | |a Construction estimating: explaining your estimate | ||
653 | |a Construction estimating: order of magnitude estimates | ||
653 | |a Construction estimating: preliminary or conceptual estimates | ||
653 | |a Construction estimating: detailed estimates | ||
653 | |a Construction estimating: architect/engineer's estimates | ||
758 | |i has work: |a Construction estimating (Text) |1 https://id.oclc.org/worldcat/entity/E39PD3WygdkjkTFJCGCy9YMGvw |4 https://id.oclc.org/worldcat/ontology/hasWork | ||
776 | 0 | 8 | |i Print version: |z 9781606502921 |z 1606502921 |
966 | 4 | 0 | |l DE-862 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=501165 |3 Volltext |
966 | 4 | 0 | |l DE-863 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=501165 |3 Volltext |
938 | |a ebrary |b EBRY |n ebr10528329 | ||
938 | |a EBSCOhost |b EBSC |n 501165 | ||
938 | |a Momentum Press |b NYMP |n 9781606502938 | ||
938 | |a YBP Library Services |b YANK |n 7136368 | ||
994 | |a 92 |b GEBAY | ||
912 | |a ZDB-4-EBA | ||
049 | |a DE-862 | ||
049 | |a DE-863 |
Datensatz im Suchindex
DE-BY-FWS_katkey | ZDB-4-EBA-ocn793581614 |
---|---|
_version_ | 1829094725654675456 |
adam_text | |
any_adam_object | |
author | Schmid, Karl F. |
author_facet | Schmid, Karl F. |
author_role | |
author_sort | Schmid, Karl F. |
author_variant | k f s kf kfs |
building | Verbundindex |
bvnumber | localFWS |
callnumber-first | T - Technology |
callnumber-label | TH435 |
callnumber-raw | TH435 .S34 2012 |
callnumber-search | TH435 .S34 2012 |
callnumber-sort | TH 3435 S34 42012 |
callnumber-subject | TH - Building Construction |
collection | ZDB-4-EBA |
contents | 1. Initial assessment -- Initial assessment checklist. 2. Work analysis -- Work analysis checklist -- Value engineering. 3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling. 4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses. 5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization. 6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners. 7. Glossary -- Index. |
ctrlnum | (OCoLC)793581614 |
dewey-full | 692/.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 692 - Auxiliary construction practices |
dewey-raw | 692/.5 |
dewey-search | 692/.5 |
dewey-sort | 3692 15 |
dewey-tens | 690 - Construction of buildings |
discipline | Bauingenieurwesen |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04848cam a2200733Ma 4500</leader><controlfield tag="001">ZDB-4-EBA-ocn793581614</controlfield><controlfield tag="003">OCoLC</controlfield><controlfield tag="005">20250103110447.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr |n|---|||||</controlfield><controlfield tag="008">120206s2012 nyu o 001 0 eng d</controlfield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MNU</subfield><subfield code="b">eng</subfield><subfield code="e">pn</subfield><subfield code="c">MNU</subfield><subfield code="d">TXA</subfield><subfield code="d">OCLCO</subfield><subfield code="d">YDXCP</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">N$T</subfield><subfield code="d">NYMPP</subfield><subfield code="d">E7B</subfield><subfield code="d">OCLCF</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">AGLDB</subfield><subfield code="d">CPO</subfield><subfield code="d">UPM</subfield><subfield code="d">STF</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">VTS</subfield><subfield code="d">M8D</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCL</subfield><subfield code="d">DXU</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">160650293X</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781606502938</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9781606502921</subfield><subfield code="q">(softcover)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">1606502921</subfield><subfield code="q">(softcover)</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)793581614</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH435</subfield><subfield code="b">.S34 2012</subfield></datafield><datafield tag="072" ind1=" " ind2="7"><subfield code="a">TEC</subfield><subfield code="x">005040</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="082" ind1="7" ind2=" "><subfield code="a">692/.5</subfield><subfield code="2">23</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">MAIN</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Schmid, Karl F.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Construction estimating :</subfield><subfield code="b">a step-by-step guide to a successful estimate /</subfield><subfield code="c">Karl F. Schmid.</subfield></datafield><datafield tag="260" ind1=" " ind2=" "><subfield code="a">New York :</subfield><subfield code="b">Momentum Press,</subfield><subfield code="c">©2012.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="588" ind1="0" ind2=" "><subfield code="a">Print version record.</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes index.</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">1. Initial assessment -- Initial assessment checklist.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">2. Work analysis -- Work analysis checklist -- Value engineering.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">7. Glossary -- Index.</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, failures" and scan the various responses. You will learn that according to the Surety Information Office the contractor failure rate is about 25% for trade contractors and 22% for heavy, highway contractors. These figures have been fairly constant for years. You will also learn that poor estimating is a major cause of these failures.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Building</subfield><subfield code="x">Estimates.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh85017698</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Construction</subfield><subfield code="x">Devis estimatifs.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING</subfield><subfield code="x">Construction</subfield><subfield code="x">Estimating.</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Building</subfield><subfield code="x">Estimates</subfield><subfield code="2">fast</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction bidding</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: overhead and indirect costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: beyond direct costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: project scheduling</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: work analysis</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: assigning costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: Value Engineering</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: subcontractor selection</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: explaining your estimate</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: order of magnitude estimates</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: preliminary or conceptual estimates</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: detailed estimates</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Construction estimating: architect/engineer's estimates</subfield></datafield><datafield tag="758" ind1=" " ind2=" "><subfield code="i">has work:</subfield><subfield code="a">Construction estimating (Text)</subfield><subfield code="1">https://id.oclc.org/worldcat/entity/E39PD3WygdkjkTFJCGCy9YMGvw</subfield><subfield code="4">https://id.oclc.org/worldcat/ontology/hasWork</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="z">9781606502921</subfield><subfield code="z">1606502921</subfield></datafield><datafield tag="966" ind1="4" ind2="0"><subfield code="l">DE-862</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=501165</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="4" ind2="0"><subfield code="l">DE-863</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=501165</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">ebrary</subfield><subfield code="b">EBRY</subfield><subfield code="n">ebr10528329</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">EBSCOhost</subfield><subfield code="b">EBSC</subfield><subfield code="n">501165</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">Momentum Press</subfield><subfield code="b">NYMP</subfield><subfield code="n">9781606502938</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">7136368</subfield></datafield><datafield tag="994" ind1=" " ind2=" "><subfield code="a">92</subfield><subfield code="b">GEBAY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-862</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-863</subfield></datafield></record></collection> |
id | ZDB-4-EBA-ocn793581614 |
illustrated | Not Illustrated |
indexdate | 2025-04-11T08:37:42Z |
institution | BVB |
isbn | 160650293X 9781606502938 |
language | English |
oclc_num | 793581614 |
open_access_boolean | |
owner | MAIN DE-862 DE-BY-FWS DE-863 DE-BY-FWS |
owner_facet | MAIN DE-862 DE-BY-FWS DE-863 DE-BY-FWS |
physical | 1 online resource |
psigel | ZDB-4-EBA FWS_PDA_EBA ZDB-4-EBA |
publishDate | 2012 |
publishDateSearch | 2012 |
publishDateSort | 2012 |
publisher | Momentum Press, |
record_format | marc |
spelling | Schmid, Karl F. Construction estimating : a step-by-step guide to a successful estimate / Karl F. Schmid. New York : Momentum Press, ©2012. 1 online resource text txt rdacontent computer c rdamedia online resource cr rdacarrier Print version record. Includes index. 1. Initial assessment -- Initial assessment checklist. 2. Work analysis -- Work analysis checklist -- Value engineering. 3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling. 4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses. 5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization. 6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners. 7. Glossary -- Index. Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, failures" and scan the various responses. You will learn that according to the Surety Information Office the contractor failure rate is about 25% for trade contractors and 22% for heavy, highway contractors. These figures have been fairly constant for years. You will also learn that poor estimating is a major cause of these failures. Building Estimates. http://id.loc.gov/authorities/subjects/sh85017698 Construction Devis estimatifs. TECHNOLOGY & ENGINEERING Construction Estimating. bisacsh Building Estimates fast Construction bidding Construction estimating Construction estimating: overhead and indirect costs Construction estimating: beyond direct costs Construction estimating: project scheduling Construction estimating: work analysis Construction estimating: assigning costs Construction estimating: Value Engineering Construction estimating: subcontractor selection Construction estimating: explaining your estimate Construction estimating: order of magnitude estimates Construction estimating: preliminary or conceptual estimates Construction estimating: detailed estimates Construction estimating: architect/engineer's estimates has work: Construction estimating (Text) https://id.oclc.org/worldcat/entity/E39PD3WygdkjkTFJCGCy9YMGvw https://id.oclc.org/worldcat/ontology/hasWork Print version: 9781606502921 1606502921 |
spellingShingle | Schmid, Karl F. Construction estimating : a step-by-step guide to a successful estimate / 1. Initial assessment -- Initial assessment checklist. 2. Work analysis -- Work analysis checklist -- Value engineering. 3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling. 4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses. 5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization. 6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners. 7. Glossary -- Index. Building Estimates. http://id.loc.gov/authorities/subjects/sh85017698 Construction Devis estimatifs. TECHNOLOGY & ENGINEERING Construction Estimating. bisacsh Building Estimates fast |
subject_GND | http://id.loc.gov/authorities/subjects/sh85017698 |
title | Construction estimating : a step-by-step guide to a successful estimate / |
title_auth | Construction estimating : a step-by-step guide to a successful estimate / |
title_exact_search | Construction estimating : a step-by-step guide to a successful estimate / |
title_full | Construction estimating : a step-by-step guide to a successful estimate / Karl F. Schmid. |
title_fullStr | Construction estimating : a step-by-step guide to a successful estimate / Karl F. Schmid. |
title_full_unstemmed | Construction estimating : a step-by-step guide to a successful estimate / Karl F. Schmid. |
title_short | Construction estimating : |
title_sort | construction estimating a step by step guide to a successful estimate |
title_sub | a step-by-step guide to a successful estimate / |
topic | Building Estimates. http://id.loc.gov/authorities/subjects/sh85017698 Construction Devis estimatifs. TECHNOLOGY & ENGINEERING Construction Estimating. bisacsh Building Estimates fast |
topic_facet | Building Estimates. Construction Devis estimatifs. TECHNOLOGY & ENGINEERING Construction Estimating. Building Estimates |
work_keys_str_mv | AT schmidkarlf constructionestimatingastepbystepguidetoasuccessfulestimate |