Regulatory Governance and Chile's 1998-99 Electricity Shortage:
When the La Niña drought hit Chile in 1998-99, the country's recently reformed electricity sector suffered a price collapse. Power outages followed-but were they inevitable? No. The electricity shortage can be blamed on the rigid price system and deficient regulatory governance. In the early 19...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Washington, D.C
The World Bank
2001
|
Schlagworte: | |
Online-Zugang: | BSB01 EUV01 HTW01 FHI01 IOS01 Volltext |
Zusammenfassung: | When the La Niña drought hit Chile in 1998-99, the country's recently reformed electricity sector suffered a price collapse. Power outages followed-but were they inevitable? No. The electricity shortage can be blamed on the rigid price system and deficient regulatory governance. In the early 1980s Chile reformed its electricity sector, introducing a regulatory framework that became influential worldwide. But in 1998 and 1999 La Niña brought one of the worst droughts on record, causing a price system collapse, random power outages, and three-hour rotating electricity cuts. Fischer and Galetovic study the interaction between regulatory incentives and governance during the 1998-99 electricity shortage, showing that the supply restriction could have been managed without outages. The shortage can be blamed on a rigid price system, which was unable to respond to large supply shocks, and on deficient regulatory governance, which led to a weak regulator unable to make the system work. The authors also show that the regulator's weakness stemmed not from lack of formal powers but from vulnerability to lobbyists and a lack of independence. Moreover, the regulator seems not to have fully understood the incentives in the price system during supply restrictions. The authors conclude that the Chilean shortage shows the limitations of a rigid price system requiring heavy regulatory intervention. This suggests that countries whose governance structures are ill suited to dealing with loopholes left by the law should rely as much as possible on market rules that clearly allocate property rights ex ante and leave the terms of contracts to be freely negotiated by private parties. This paper-a product of Governance, Regulation, and Finance Division, World Bank Institute-is part of a larger effort in the institute to increase the understanding of infrastructure regulation. The authors may be contacted at rfischer@dii.uchile.cl or agaleto@dii.uchile.cl |
Beschreibung: | 1 Online-Ressource (36 Seiten)) |
Internformat
MARC
LEADER | 00000nmm a22000001c 4500 | ||
---|---|---|---|
001 | BV049075890 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 230731s2001 xxu|||| o||u| ||||||eng d | ||
035 | |a (ZDB-1-WBA)093212879 | ||
035 | |a (OCoLC)1392145746 | ||
035 | |a (DE-599)GBVNLM005449022 | ||
040 | |a DE-604 |b ger | ||
041 | 0 | |a eng | |
044 | |a xxu |c XD-US | ||
049 | |a DE-12 |a DE-521 |a DE-573 |a DE-523 |a DE-Re13 | ||
100 | 1 | |a Fischer, Ronald |e Verfasser |4 aut | |
245 | 1 | 0 | |a Regulatory Governance and Chile's 1998-99 Electricity Shortage |c Fischer, Ronald |
264 | 1 | |a Washington, D.C |b The World Bank |c 2001 | |
300 | |a 1 Online-Ressource (36 Seiten)) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
520 | 3 | |a When the La Niña drought hit Chile in 1998-99, the country's recently reformed electricity sector suffered a price collapse. Power outages followed-but were they inevitable? No. The electricity shortage can be blamed on the rigid price system and deficient regulatory governance. In the early 1980s Chile reformed its electricity sector, introducing a regulatory framework that became influential worldwide. But in 1998 and 1999 La Niña brought one of the worst droughts on record, causing a price system collapse, random power outages, and three-hour rotating electricity cuts. Fischer and Galetovic study the interaction between regulatory incentives and governance during the 1998-99 electricity shortage, showing that the supply restriction could have been managed without outages. The shortage can be blamed on a rigid price system, which was unable to respond to large supply shocks, and on deficient regulatory governance, which led to a weak regulator unable to make the system work. The authors also show that the regulator's weakness stemmed not from lack of formal powers but from vulnerability to lobbyists and a lack of independence. Moreover, the regulator seems not to have fully understood the incentives in the price system during supply restrictions. The authors conclude that the Chilean shortage shows the limitations of a rigid price system requiring heavy regulatory intervention. This suggests that countries whose governance structures are ill suited to dealing with loopholes left by the law should rely as much as possible on market rules that clearly allocate property rights ex ante and leave the terms of contracts to be freely negotiated by private parties. This paper-a product of Governance, Regulation, and Finance Division, World Bank Institute-is part of a larger effort in the institute to increase the understanding of infrastructure regulation. The authors may be contacted at rfischer@dii.uchile.cl or agaleto@dii.uchile.cl | |
533 | |a Online-Ausg | ||
650 | 4 | |a Cost of Energy | |
650 | 4 | |a Demand For Energy | |
650 | 4 | |a Electric Generation | |
650 | 4 | |a Electricity | |
650 | 4 | |a Electricity Supply | |
650 | 4 | |a Energy | |
650 | 4 | |a Energy | |
650 | 4 | |a Energy Production | |
650 | 4 | |a Energy Production and Transportation | |
650 | 4 | |a Energy Shortages | |
650 | 4 | |a Energy Supply | |
650 | 4 | |a Fuels | |
650 | 4 | |a Investment | |
650 | 4 | |a Macroeconomics and Economic Growth | |
650 | 4 | |a Markets and Market Access | |
700 | 1 | |a Galetovic, Alexander |e Sonstige |4 oth | |
700 | 1 | |a Fischer, Ronald |e Sonstige |4 oth | |
776 | 0 | 8 | |i Fischer, Ronald |a Regulatory Governance and Chile's 1998-99 Electricity Shortage |
856 | 4 | 0 | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-1-WBA | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-034337781 | ||
966 | e | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |l BSB01 |p ZDB-1-WBA |x Verlag |3 Volltext | |
966 | e | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |l EUV01 |p ZDB-1-WBA |x Verlag |3 Volltext | |
966 | e | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |l HTW01 |p ZDB-1-WBA |x Verlag |3 Volltext | |
966 | e | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |l FHI01 |p ZDB-1-WBA |x Verlag |3 Volltext | |
966 | e | |u http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |l IOS01 |p ZDB-1-WBA |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804185395928236032 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Fischer, Ronald |
author_facet | Fischer, Ronald |
author_role | aut |
author_sort | Fischer, Ronald |
author_variant | r f rf |
building | Verbundindex |
bvnumber | BV049075890 |
collection | ZDB-1-WBA |
ctrlnum | (ZDB-1-WBA)093212879 (OCoLC)1392145746 (DE-599)GBVNLM005449022 |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04310nmm a22005891c 4500</leader><controlfield tag="001">BV049075890</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">230731s2001 xxu|||| o||u| ||||||eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-1-WBA)093212879</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1392145746</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVNLM005449022</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">xxu</subfield><subfield code="c">XD-US</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-573</subfield><subfield code="a">DE-523</subfield><subfield code="a">DE-Re13</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Fischer, Ronald</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Regulatory Governance and Chile's 1998-99 Electricity Shortage</subfield><subfield code="c">Fischer, Ronald</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Washington, D.C</subfield><subfield code="b">The World Bank</subfield><subfield code="c">2001</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (36 Seiten))</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">When the La Niña drought hit Chile in 1998-99, the country's recently reformed electricity sector suffered a price collapse. Power outages followed-but were they inevitable? No. The electricity shortage can be blamed on the rigid price system and deficient regulatory governance. In the early 1980s Chile reformed its electricity sector, introducing a regulatory framework that became influential worldwide. But in 1998 and 1999 La Niña brought one of the worst droughts on record, causing a price system collapse, random power outages, and three-hour rotating electricity cuts. Fischer and Galetovic study the interaction between regulatory incentives and governance during the 1998-99 electricity shortage, showing that the supply restriction could have been managed without outages. The shortage can be blamed on a rigid price system, which was unable to respond to large supply shocks, and on deficient regulatory governance, which led to a weak regulator unable to make the system work. The authors also show that the regulator's weakness stemmed not from lack of formal powers but from vulnerability to lobbyists and a lack of independence. Moreover, the regulator seems not to have fully understood the incentives in the price system during supply restrictions. The authors conclude that the Chilean shortage shows the limitations of a rigid price system requiring heavy regulatory intervention. This suggests that countries whose governance structures are ill suited to dealing with loopholes left by the law should rely as much as possible on market rules that clearly allocate property rights ex ante and leave the terms of contracts to be freely negotiated by private parties. This paper-a product of Governance, Regulation, and Finance Division, World Bank Institute-is part of a larger effort in the institute to increase the understanding of infrastructure regulation. The authors may be contacted at rfischer@dii.uchile.cl or agaleto@dii.uchile.cl</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="a">Online-Ausg</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Cost of Energy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Demand For Energy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Electric Generation</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Electricity</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Electricity Supply</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy Production</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy Production and Transportation</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy Shortages</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy Supply</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Fuels</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Investment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Macroeconomics and Economic Growth</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Markets and Market Access</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Galetovic, Alexander</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Fischer, Ronald</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Fischer, Ronald</subfield><subfield code="a">Regulatory Governance and Chile's 1998-99 Electricity Shortage</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-WBA</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-034337781</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="l">BSB01</subfield><subfield code="p">ZDB-1-WBA</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="l">EUV01</subfield><subfield code="p">ZDB-1-WBA</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="l">HTW01</subfield><subfield code="p">ZDB-1-WBA</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="l">FHI01</subfield><subfield code="p">ZDB-1-WBA</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704</subfield><subfield code="l">IOS01</subfield><subfield code="p">ZDB-1-WBA</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV049075890 |
illustrated | Not Illustrated |
index_date | 2024-07-03T22:27:49Z |
indexdate | 2024-07-10T09:54:34Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-034337781 |
oclc_num | 1392145746 |
open_access_boolean | |
owner | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR |
owner_facet | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR |
physical | 1 Online-Ressource (36 Seiten)) |
psigel | ZDB-1-WBA |
publishDate | 2001 |
publishDateSearch | 2001 |
publishDateSort | 2001 |
publisher | The World Bank |
record_format | marc |
spelling | Fischer, Ronald Verfasser aut Regulatory Governance and Chile's 1998-99 Electricity Shortage Fischer, Ronald Washington, D.C The World Bank 2001 1 Online-Ressource (36 Seiten)) txt rdacontent c rdamedia cr rdacarrier When the La Niña drought hit Chile in 1998-99, the country's recently reformed electricity sector suffered a price collapse. Power outages followed-but were they inevitable? No. The electricity shortage can be blamed on the rigid price system and deficient regulatory governance. In the early 1980s Chile reformed its electricity sector, introducing a regulatory framework that became influential worldwide. But in 1998 and 1999 La Niña brought one of the worst droughts on record, causing a price system collapse, random power outages, and three-hour rotating electricity cuts. Fischer and Galetovic study the interaction between regulatory incentives and governance during the 1998-99 electricity shortage, showing that the supply restriction could have been managed without outages. The shortage can be blamed on a rigid price system, which was unable to respond to large supply shocks, and on deficient regulatory governance, which led to a weak regulator unable to make the system work. The authors also show that the regulator's weakness stemmed not from lack of formal powers but from vulnerability to lobbyists and a lack of independence. Moreover, the regulator seems not to have fully understood the incentives in the price system during supply restrictions. The authors conclude that the Chilean shortage shows the limitations of a rigid price system requiring heavy regulatory intervention. This suggests that countries whose governance structures are ill suited to dealing with loopholes left by the law should rely as much as possible on market rules that clearly allocate property rights ex ante and leave the terms of contracts to be freely negotiated by private parties. This paper-a product of Governance, Regulation, and Finance Division, World Bank Institute-is part of a larger effort in the institute to increase the understanding of infrastructure regulation. The authors may be contacted at rfischer@dii.uchile.cl or agaleto@dii.uchile.cl Online-Ausg Cost of Energy Demand For Energy Electric Generation Electricity Electricity Supply Energy Energy Production Energy Production and Transportation Energy Shortages Energy Supply Fuels Investment Macroeconomics and Economic Growth Markets and Market Access Galetovic, Alexander Sonstige oth Fischer, Ronald Sonstige oth Fischer, Ronald Regulatory Governance and Chile's 1998-99 Electricity Shortage http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 Verlag URL des Erstveröffentlichers Volltext |
spellingShingle | Fischer, Ronald Regulatory Governance and Chile's 1998-99 Electricity Shortage Cost of Energy Demand For Energy Electric Generation Electricity Electricity Supply Energy Energy Production Energy Production and Transportation Energy Shortages Energy Supply Fuels Investment Macroeconomics and Economic Growth Markets and Market Access |
title | Regulatory Governance and Chile's 1998-99 Electricity Shortage |
title_auth | Regulatory Governance and Chile's 1998-99 Electricity Shortage |
title_exact_search | Regulatory Governance and Chile's 1998-99 Electricity Shortage |
title_exact_search_txtP | Regulatory Governance and Chile's 1998-99 Electricity Shortage |
title_full | Regulatory Governance and Chile's 1998-99 Electricity Shortage Fischer, Ronald |
title_fullStr | Regulatory Governance and Chile's 1998-99 Electricity Shortage Fischer, Ronald |
title_full_unstemmed | Regulatory Governance and Chile's 1998-99 Electricity Shortage Fischer, Ronald |
title_short | Regulatory Governance and Chile's 1998-99 Electricity Shortage |
title_sort | regulatory governance and chile s 1998 99 electricity shortage |
topic | Cost of Energy Demand For Energy Electric Generation Electricity Electricity Supply Energy Energy Production Energy Production and Transportation Energy Shortages Energy Supply Fuels Investment Macroeconomics and Economic Growth Markets and Market Access |
topic_facet | Cost of Energy Demand For Energy Electric Generation Electricity Electricity Supply Energy Energy Production Energy Production and Transportation Energy Shortages Energy Supply Fuels Investment Macroeconomics and Economic Growth Markets and Market Access |
url | http://elibrary.worldbank.org/content/workingpaper/10.1596/1813-9450-2704 |
work_keys_str_mv | AT fischerronald regulatorygovernanceandchiles199899electricityshortage AT galetovicalexander regulatorygovernanceandchiles199899electricityshortage |