Shop floor scheduling and control:
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Dearborn, Mich.
Soc. of Manufacturing Engineers
1975
|
Schriftenreihe: | Society of Manufacturing Engineers: Technical papers.
1975,230 |
Beschreibung: | 16 Seiten |
Internformat
MARC
LEADER | 00000nam a2200000 cb4500 | ||
---|---|---|---|
001 | BV048287722 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 220615s1975 |||| 00||| eng d | ||
035 | |a (OCoLC)1334018365 | ||
035 | |a (DE-599)BVBBV048287722 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-91 | ||
100 | 1 | |a Baringer, L. J. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Shop floor scheduling and control |c by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division |
264 | 1 | |a Dearborn, Mich. |b Soc. of Manufacturing Engineers |c 1975 | |
300 | |a 16 Seiten | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 1 | |a Society of Manufacturing Engineers: Technical papers. |v 1975,230 | |
490 | 0 | |a Creative manufacturing engineering programs. | |
700 | 1 | |a Bulger, D. J. |e Verfasser |4 aut | |
700 | 1 | |a Johnston, G. R. |e Verfasser |4 aut | |
830 | 0 | |a Society of Manufacturing Engineers: Technical papers. |v 1975,230 |w (DE-604)BV001895058 |9 230 | |
999 | |a oai:aleph.bib-bvb.de:BVB01-033667788 |
Datensatz im Suchindex
_version_ | 1804184118622158848 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Baringer, L. J. Bulger, D. J. Johnston, G. R. |
author_facet | Baringer, L. J. Bulger, D. J. Johnston, G. R. |
author_role | aut aut aut |
author_sort | Baringer, L. J. |
author_variant | l j b lj ljb d j b dj djb g r j gr grj |
building | Verbundindex |
bvnumber | BV048287722 |
ctrlnum | (OCoLC)1334018365 (DE-599)BVBBV048287722 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01209nam a2200301 cb4500</leader><controlfield tag="001">BV048287722</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">220615s1975 |||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1334018365</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV048287722</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Baringer, L. J.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Shop floor scheduling and control</subfield><subfield code="c">by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Dearborn, Mich.</subfield><subfield code="b">Soc. of Manufacturing Engineers</subfield><subfield code="c">1975</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">16 Seiten</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Society of Manufacturing Engineers: Technical papers.</subfield><subfield code="v">1975,230</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Creative manufacturing engineering programs.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Bulger, D. J.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Johnston, G. R.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">Society of Manufacturing Engineers: Technical papers.</subfield><subfield code="v">1975,230</subfield><subfield code="w">(DE-604)BV001895058</subfield><subfield code="9">230</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-033667788</subfield></datafield></record></collection> |
id | DE-604.BV048287722 |
illustrated | Not Illustrated |
index_date | 2024-07-03T20:02:34Z |
indexdate | 2024-07-10T09:34:15Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-033667788 |
oclc_num | 1334018365 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
physical | 16 Seiten |
publishDate | 1975 |
publishDateSearch | 1975 |
publishDateSort | 1975 |
publisher | Soc. of Manufacturing Engineers |
record_format | marc |
series | Society of Manufacturing Engineers: Technical papers. |
series2 | Society of Manufacturing Engineers: Technical papers. Creative manufacturing engineering programs. |
spelling | Baringer, L. J. Verfasser aut Shop floor scheduling and control by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division Dearborn, Mich. Soc. of Manufacturing Engineers 1975 16 Seiten txt rdacontent n rdamedia nc rdacarrier Society of Manufacturing Engineers: Technical papers. 1975,230 Creative manufacturing engineering programs. Bulger, D. J. Verfasser aut Johnston, G. R. Verfasser aut Society of Manufacturing Engineers: Technical papers. 1975,230 (DE-604)BV001895058 230 |
spellingShingle | Baringer, L. J. Bulger, D. J. Johnston, G. R. Shop floor scheduling and control Society of Manufacturing Engineers: Technical papers. |
title | Shop floor scheduling and control |
title_auth | Shop floor scheduling and control |
title_exact_search | Shop floor scheduling and control |
title_exact_search_txtP | Shop floor scheduling and control |
title_full | Shop floor scheduling and control by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division |
title_fullStr | Shop floor scheduling and control by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division |
title_full_unstemmed | Shop floor scheduling and control by L. J. Baringer, Associate Systems and Procedures Analyst, D. J. Bulger, Associate Systems and Procedures Analyst and G. R. Johnston, Senior Associate Systems and Procedures Analyst, IBM, General Systems Division |
title_short | Shop floor scheduling and control |
title_sort | shop floor scheduling and control |
volume_link | (DE-604)BV001895058 |
work_keys_str_mv | AT baringerlj shopfloorschedulingandcontrol AT bulgerdj shopfloorschedulingandcontrol AT johnstongr shopfloorschedulingandcontrol |