Learning from Power Sector Reform: The Case of Pakistan
Pakistan's power sector underwent a substantial, if protracted, reform process. Beginning with an independent power producer program in 1994, the full unbundling of the national vertically integrated power and water utility, the Water and Power Development Authority, and the establishment of a...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Washington, D.C
The World Bank
2019
|
Schriftenreihe: | World Bank E-Library Archive
|
Online-Zugang: | Volltext |
Zusammenfassung: | Pakistan's power sector underwent a substantial, if protracted, reform process. Beginning with an independent power producer program in 1994, the full unbundling of the national vertically integrated power and water utility, the Water and Power Development Authority, and the establishment of a regulatory entity, the National Electric Power Regulatory Authority, followed in 1997, paving the way for the eventual privatization of one major distribution utility, Karachi Electric, in 2005. Plans to privatize the remaining distribution utilities were shelved following the controversy surrounding the Karachi Electric transaction. A single buyer model has been in operation since the sector restructuring, with the Central Power Purchasing Agency fully separated from transmission and dispatch (the National Transmission and Dispatch Company) in June 2015. Despite these major steps, Pakistan has continued to suffer from inadequate capacity and other constraints, leading to large and frequent blackouts. At the heart of the impasse is the so-called "circular debt" crisis, whereby distribution utilities struggling to collect revenues and meet regulatory targets for transmission and distribution losses default on their payments to generators, and the sector is periodically bailed out by the government once losses accumulate to intolerable levels, at high cost to the exchequer. This dynamic has undermined incentives for utilities to improve their efficiency, while discouraging generators from investing in new capacity to address supply shortages. In the meantime, little has been done to accelerate access to electricity to the significant share of unserved population in rural areas |
Beschreibung: | 1 Online-Ressource (80 Seiten) |
DOI: | 10.1596/1813-9450-8842 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV048274313 | ||
003 | DE-604 | ||
007 | cr|uuu---uuuuu | ||
008 | 220609s2019 |||| o||u| ||||||eng d | ||
024 | 7 | |a 10.1596/1813-9450-8842 |2 doi | |
035 | |a (ZDB-1-WBA)NLM011152354 | ||
035 | |a (OCoLC)1334054966 | ||
035 | |a (DE-599)GBVNLM011152354 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-12 |a DE-521 |a DE-573 |a DE-523 |a DE-Re13 |a DE-19 |a DE-355 |a DE-703 |a DE-91 |a DE-706 |a DE-29 |a DE-M347 |a DE-473 |a DE-824 |a DE-20 |a DE-739 |a DE-1043 |a DE-863 |a DE-862 | ||
100 | 1 | |a Bacon, Robert W. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Learning from Power Sector Reform |b The Case of Pakistan |c Bacon, Robert W |
264 | 1 | |a Washington, D.C |b The World Bank |c 2019 | |
300 | |a 1 Online-Ressource (80 Seiten) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a World Bank E-Library Archive | |
520 | |a Pakistan's power sector underwent a substantial, if protracted, reform process. Beginning with an independent power producer program in 1994, the full unbundling of the national vertically integrated power and water utility, the Water and Power Development Authority, and the establishment of a regulatory entity, the National Electric Power Regulatory Authority, followed in 1997, paving the way for the eventual privatization of one major distribution utility, Karachi Electric, in 2005. Plans to privatize the remaining distribution utilities were shelved following the controversy surrounding the Karachi Electric transaction. A single buyer model has been in operation since the sector restructuring, with the Central Power Purchasing Agency fully separated from transmission and dispatch (the National Transmission and Dispatch Company) in June 2015. Despite these major steps, Pakistan has continued to suffer from inadequate capacity and other constraints, leading to large and frequent blackouts. At the heart of the impasse is the so-called "circular debt" crisis, whereby distribution utilities struggling to collect revenues and meet regulatory targets for transmission and distribution losses default on their payments to generators, and the sector is periodically bailed out by the government once losses accumulate to intolerable levels, at high cost to the exchequer. This dynamic has undermined incentives for utilities to improve their efficiency, while discouraging generators from investing in new capacity to address supply shortages. In the meantime, little has been done to accelerate access to electricity to the significant share of unserved population in rural areas | ||
700 | 1 | |a Bacon, Robert W. |4 oth | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |a Bacon, Robert W |t Learning from Power Sector Reform: The Case of Pakistan |d Washington, D.C : The World Bank, 2019 |
856 | 4 | 0 | |u https://doi.org/10.1596/1813-9450-8842 |x Verlag |z kostenfrei |3 Volltext |
912 | |a ZDB-1-WBA | ||
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-033654508 |
Datensatz im Suchindex
_version_ | 1812671823622438913 |
---|---|
adam_text | |
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Bacon, Robert W. |
author_facet | Bacon, Robert W. |
author_role | aut |
author_sort | Bacon, Robert W. |
author_variant | r w b rw rwb |
building | Verbundindex |
bvnumber | BV048274313 |
collection | ZDB-1-WBA |
ctrlnum | (ZDB-1-WBA)NLM011152354 (OCoLC)1334054966 (DE-599)GBVNLM011152354 |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
doi_str_mv | 10.1596/1813-9450-8842 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00000nmm a2200000zc 4500</leader><controlfield tag="001">BV048274313</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">220609s2019 |||| o||u| ||||||eng d</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1596/1813-9450-8842</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-1-WBA)NLM011152354</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1334054966</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVNLM011152354</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-573</subfield><subfield code="a">DE-523</subfield><subfield code="a">DE-Re13</subfield><subfield code="a">DE-19</subfield><subfield code="a">DE-355</subfield><subfield code="a">DE-703</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-706</subfield><subfield code="a">DE-29</subfield><subfield code="a">DE-M347</subfield><subfield code="a">DE-473</subfield><subfield code="a">DE-824</subfield><subfield code="a">DE-20</subfield><subfield code="a">DE-739</subfield><subfield code="a">DE-1043</subfield><subfield code="a">DE-863</subfield><subfield code="a">DE-862</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Bacon, Robert W.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Learning from Power Sector Reform</subfield><subfield code="b">The Case of Pakistan</subfield><subfield code="c">Bacon, Robert W</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Washington, D.C</subfield><subfield code="b">The World Bank</subfield><subfield code="c">2019</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (80 Seiten)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">World Bank E-Library Archive</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Pakistan's power sector underwent a substantial, if protracted, reform process. Beginning with an independent power producer program in 1994, the full unbundling of the national vertically integrated power and water utility, the Water and Power Development Authority, and the establishment of a regulatory entity, the National Electric Power Regulatory Authority, followed in 1997, paving the way for the eventual privatization of one major distribution utility, Karachi Electric, in 2005. Plans to privatize the remaining distribution utilities were shelved following the controversy surrounding the Karachi Electric transaction. A single buyer model has been in operation since the sector restructuring, with the Central Power Purchasing Agency fully separated from transmission and dispatch (the National Transmission and Dispatch Company) in June 2015. Despite these major steps, Pakistan has continued to suffer from inadequate capacity and other constraints, leading to large and frequent blackouts. At the heart of the impasse is the so-called "circular debt" crisis, whereby distribution utilities struggling to collect revenues and meet regulatory targets for transmission and distribution losses default on their payments to generators, and the sector is periodically bailed out by the government once losses accumulate to intolerable levels, at high cost to the exchequer. This dynamic has undermined incentives for utilities to improve their efficiency, while discouraging generators from investing in new capacity to address supply shortages. In the meantime, little has been done to accelerate access to electricity to the significant share of unserved population in rural areas</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Bacon, Robert W.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="a">Bacon, Robert W</subfield><subfield code="t">Learning from Power Sector Reform: The Case of Pakistan</subfield><subfield code="d">Washington, D.C : The World Bank, 2019</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1596/1813-9450-8842</subfield><subfield code="x">Verlag</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-WBA</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-033654508</subfield></datafield></record></collection> |
id | DE-604.BV048274313 |
illustrated | Not Illustrated |
index_date | 2024-07-03T20:00:11Z |
indexdate | 2024-10-12T04:02:42Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-033654508 |
oclc_num | 1334054966 |
open_access_boolean | 1 |
owner | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
owner_facet | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
physical | 1 Online-Ressource (80 Seiten) |
psigel | ZDB-1-WBA |
publishDate | 2019 |
publishDateSearch | 2019 |
publishDateSort | 2019 |
publisher | The World Bank |
record_format | marc |
series2 | World Bank E-Library Archive |
spellingShingle | Bacon, Robert W. Learning from Power Sector Reform The Case of Pakistan |
title | Learning from Power Sector Reform The Case of Pakistan |
title_auth | Learning from Power Sector Reform The Case of Pakistan |
title_exact_search | Learning from Power Sector Reform The Case of Pakistan |
title_exact_search_txtP | Learning from Power Sector Reform The Case of Pakistan |
title_full | Learning from Power Sector Reform The Case of Pakistan Bacon, Robert W |
title_fullStr | Learning from Power Sector Reform The Case of Pakistan Bacon, Robert W |
title_full_unstemmed | Learning from Power Sector Reform The Case of Pakistan Bacon, Robert W |
title_short | Learning from Power Sector Reform |
title_sort | learning from power sector reform the case of pakistan |
title_sub | The Case of Pakistan |
url | https://doi.org/10.1596/1813-9450-8842 |
work_keys_str_mv | AT baconrobertw learningfrompowersectorreformthecaseofpakistan |