Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Abschlussarbeit Buch |
Sprache: | German |
Veröffentlicht: |
Wiesbaden
Springer Gabler
[2019]
|
Schriftenreihe: | Edition KWV
|
Schlagworte: | |
Online-Zugang: | Inhaltstext http://www.springer.com/ Inhaltsverzeichnis Inhaltsverzeichnis |
Beschreibung: | XXIV, 284 Seiten Illustrationen 24 cm, 519 g |
ISBN: | 9783658242459 3658242450 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV047831040 | ||
003 | DE-604 | ||
005 | 20220330 | ||
007 | t | ||
008 | 220211s2019 gw a||| m||| 00||| ger d | ||
015 | |a 19,N01 |2 dnb | ||
015 | |a 19,A29 |2 dnb | ||
015 | |a 19,H08 |2 dnb | ||
016 | 7 | |a 1173819630 |2 DE-101 | |
020 | |a 9783658242459 |c Broschur : circa EUR 52.99 (DE), circa EUR 54.48 (AT), circa CHF 58.50 (freier Preis) |9 978-3-658-24245-9 | ||
020 | |a 3658242450 |9 3-658-24245-0 | ||
024 | 3 | |a 9783658242459 | |
028 | 5 | 2 | |a Bestellnummer: 978-3-658-24245-9 |
028 | 5 | 2 | |a Bestellnummer: 87018809 |
035 | |a (OCoLC)1310243462 | ||
035 | |a (DE-599)DNB1173819630 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a ger | |
044 | |a gw |c XA-DE-HE | ||
049 | |a DE-355 | ||
082 | 0 | |a 658.514 |2 23/ger | |
084 | |a QP 543 |0 (DE-625)141901: |2 rvk | ||
084 | |a 650 |2 sdnb | ||
100 | 1 | |a Manitz, Michael |e Verfasser |0 (DE-588)130406643 |4 aut | |
245 | 1 | 0 | |a Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |c Michael Manitz |
264 | 1 | |a Wiesbaden |b Springer Gabler |c [2019] | |
300 | |a XXIV, 284 Seiten |b Illustrationen |c 24 cm, 519 g | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 0 | |a Edition KWV | |
502 | |b Dissertation |c Universität zu Köln |d 2004 | ||
534 | |c 2005 | ||
650 | 0 | 7 | |a Warteschlangentheorie |0 (DE-588)4255044-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Leistungsbewertung |0 (DE-588)4167271-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fließfertigung |0 (DE-588)4154634-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Flexible Fertigung |0 (DE-588)4017519-4 |2 gnd |9 rswk-swf |
653 | |a Paperback / softback | ||
653 | |a BUS041000 | ||
653 | |a KJC | ||
653 | |a Automobilindustrie | ||
653 | |a Leistungsanalyse | ||
653 | |a Montagesysteme | ||
653 | |a flexible Produktion | ||
653 | |a stochastische Effekte | ||
653 | |a BUS087000 | ||
653 | |a KJMV5 | ||
653 | |a A | ||
653 | |a SC515010: Business Strategy/Leadership | ||
653 | |a SUCO41170: Economics and Finance | ||
653 | |a SC519010: Production | ||
653 | |a BUS041000 | ||
653 | |a KJC | ||
653 | |a 1784: Hardcover, Softcover / Wirtschaft/Management | ||
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a Flexible Fertigung |0 (DE-588)4017519-4 |D s |
689 | 0 | 1 | |a Fließfertigung |0 (DE-588)4154634-9 |D s |
689 | 0 | 2 | |a Leistungsbewertung |0 (DE-588)4167271-9 |D s |
689 | 0 | 3 | |a Warteschlangentheorie |0 (DE-588)4255044-0 |D s |
689 | 0 | |5 DE-604 | |
710 | 2 | |a Springer Fachmedien Wiesbaden |0 (DE-588)1043386068 |4 pbl | |
775 | 0 | 8 | |i Nachdruck von |a Manitz, Michael |t Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |d Köln : Kölner Wiss.-Verl., 2005 |h XXIV, 284 S., graph. Darst. |
776 | 0 | 8 | |i Erscheint auch als |n Online-Ausgabe |a Manitz, Michael |t Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |b 1. Auflage 2005, Nachdruck 2019 |d Wiesbaden : Springer Fachmedien Wiesbaden, 2005 |h Online-Ressource |
856 | 4 | 2 | |m X:MVB |q text/html |u http://deposit.dnb.de/cgi-bin/dokserv?id=32b7429816754656bfc9c5e519632a34&prov=M&dok_var=1&dok_ext=htm |3 Inhaltstext |
856 | 4 | 2 | |m X:MVB |u http://www.springer.com/ |
856 | 4 | 2 | |m B:DE-101 |q application/pdf |u http://d-nb.info/1173819630/04 |3 Inhaltsverzeichnis |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=033214276&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-033214276 |
Datensatz im Suchindex
_version_ | 1804183379485130752 |
---|---|
adam_text | INHALTSVERZEICHNIS
VORWORT
V
ABBILDUNGSVERZEICHNIS
XIV
TABELLENVERZEICHNIS
XVI
SYMBOLVERZEICHNIS
XVII
ABKUERZUNGSVERZEICHNIS
XXIII
A
GEGENSTAND
UND
GANG
DER
ARBEIT
1
B
MONTAGESYSTEME
5
B.
L
BESCHREIBUNG
DER
UNTERSUCHTEN
MONTAGESYSTEME
......................
8
B.
1.1
KONVERGIERENDER,
ASYNCHRONER
MATERIALFLUSS
......................
9
B.
L.
2
BLOCKIERUNG
NACH
BEARBEITUNG
UND
UNABHAENGIGE
BESTUECKUNG
..........................................................................
12
B.L.
3
STOCHASTISCHE
BEARBEITUNGSZEITEN
.....................................
17
B.L.
4
OPERATIONSZEITABHAENGIGE
MASCHINENAUSFAELLE
...................
35
B.2
LEISTUNGSANALYSE
..........................................................................
45
B.3
KONFIGURATIONSENTSCHEIDUNGEN
.....................................................
48
VII
VIII
IN
HA
ITSVERZEICHNIS
C
DIE
MODELLIERUNG
VON
MONTAGESYSTEMEN
65
0.1
WARTESCHLANGENNETZWERKE
..........................................................
65
C.
2
DEKOMPOSITION
VON
WARTESCHLANGENNETZEN
..............................
69
C.
3
APPROXIMATION
DER
WARTESCHLANGENBEZOGENEN
ZUSTANDSWAHR
SCHEINLICHKEITEN
..............................................................................
76
C.
4
STAND
DER
FORSCHUNG
BEI
DER
ANALYSE
VON
MONTAGESYSTEMEN
.
83
0.4.1
MARKOW-MODELLE
.....................................................
84
0.4.2
DEKOMPOSITIONSANSAETZE
FUER
FLIESSPRODUKTIONSLINIEN
...
87
0.4.3
ANSAETZE
FUER
EINFACHE
MONTAGESYSTEME
................
90
0.4.4
DEKOMPOSITIONSANSAETZE
FUER
KOMPLEXE
MONTAGESYSTEME
.
92
D
DIE
ABSCHAETZUNG
DER
PRODUKTIONSRATE
EINES
MONTAGESY
STEMS
MIT
EINEM
DEKOMPOSITIONSANSATZ
*
DAS
VERFAHREN
ALRMGEN
95
D.
L
SYSTEME
MIT
JEWEILS
HOECHSTENS
ZWEI
ZULIEFERSTATIONEN
.............
98
D.
1.1
APPROXIMATION
DER
ANKUNFTS-
UND
BEARBEITUNGSRATEN
SOWIE
DER
VARIATIONSKOEFFIZIENTEN
.....................................
98
D.
L.
1.1
DIE
VIRTUELLE
BEARBEITUNGSZEIT
..................................
98
D.L.
1.1.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
BEARBEITUNGSZEIT
...............................................
102
D.L.
1.1.2
DIE
BERECHNUNG
DER
ZEITPUNKTBEZOGENEN
BLOCKIERWAHRSCHEINLICHKEITEN
.........................
107
D.L.
1.1.3
DIE
BERECHNUNG
DER
VIRTUELLEN
BEARBEITUNGS
RATE
.....................................................................
109
D.L.
1.1.4
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
BEARBEITUNGSZEIT
......................
111
D.L.
1.2
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
........................
116
D.L.
1.2.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.....................................
121
D.L.
1.2.2
DIE
BERECHNUNG
DER
ZEITPUNKT
BEZOGENEN
LEERWAHRSCHEINLICHKEITEN
...............................
125
INHALTSVERZEICHNIS
IX
D.
1.1.2.3
DIE
BERECHNUNG
DER
VIRTUELLEN
ANKUNFTSRATE
.
127
D.
1.1.2.4
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
............
128
D.1.2
DAS
VERFAHREN
ALRMGEN-2
..........................................
130
D.1.3
RECHENERGEBNISSE
................................................................
144
D.1.4
SPEZIALFAELLE
UND
VERGLEICHE:
SYSTEME
MIT
LINEAREM
MATE
RIALFLUSS
(FLIESSPRODUKTIONSLINIEN)
181
D.
1.4.1
DAS
VERFAHREN
VON
B
UZACOTT
,
LIU
UND
S
HANTHI
-
KUMAR
.......................................................................
182
D.1.4.
2
DAS
VERFAHREN
VON
B
UERGER
.....................................
184
D.2
SYSTEME
OHNE
OBERGRENZE
FUER
DIE
ANZAHL
AN
ZULIEFERSTATIONEN
195
D.2.1
APPROXIMATION
DER
ANKUNFTS-
UND
BEARBEITUNGSRATEN
SOWIE
DER
VARIATIONSKOEFFIZIENTEN
.....................................
196
D.2.
1.1
DIE
VIRTUELLE
BEARBEITUNGSZEIT
..................................
196
D.2.
1.1.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
BEARBEITUNGSZEIT
..............................................
196
D.2.
1.1.2
DIE
BERECHNUNG
DER
ZEITPUNKT
BEZOGENEN
GE
MEINSAMEN
LEERWAHRSCHEINLICHKEIT
................
199
D.2.
1.1.3
DIE
BESCHREIBUNG
DER
WAHRSCHEINLICHKEITS
VERTEILUNG
DES
MAXIMUMS
VON
ZWISCHENAN
KUNFTSZEITEN
........................................................
200
D.2.
1.1.4
DIE
BERECHNUNG
DER
VIRTUELLEN
BEARBEITUNGS
RATE
....................................................................
204
D.2.
1.1.5
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
BEARBEITUNGSZEIT
......................
205
D.2.
1.2
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
........................
209
D.2.
1.2.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.....................................
209
D.2.
1.2.2
DIE
BERECHNUNG
DER
VIRTUELLEN
ANKUNFTSRATE
.
211
D.2.
1.2.3
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
............
213
X
INHALTSVERZEICHNIS
D.2.2
DAS
VERFAHREN
ALRMGEN-J
.....................................
216
D.2.3
RECHENERGEBNISSE
...........................................................
221
D.2.4
SPEZIALFAELLE
UND
VERGLEICHE:
SYSTEME
MIT
EXPONENTIALVER-
TEILTEN
BEARBEITUNGSZEITEN
............................................
229
D.2.4.
1
DAS
VERFAHREN
VON
H
ELBER
.....................................
231
D.2.4.
2
DAS
VERFAHREN
VON
J
EONG
UND
K
IM
......................
241
E
DIE
ERWEITERUNG
DES
DEKOMPOSITIONSVERFAHRENS
ALRMGEN
UM
DIE
BERUECKSICHTIGUNG
DER
WERKSTUECKQUALITAET
249
E.
L
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
BEI
WERKSTUECKVERLUSTEN
.
.
253
E.
2
DAS
VERFAHREN
ALRMSGEN
..................................................
256
E.
3
RECHENTESTS
..............................................................................
258
F
SCHLUSSBETRACHTUNG
UND
AUSBLICK
267
LITERATURVERZEICHNIS
269
|
adam_txt |
INHALTSVERZEICHNIS
VORWORT
V
ABBILDUNGSVERZEICHNIS
XIV
TABELLENVERZEICHNIS
XVI
SYMBOLVERZEICHNIS
XVII
ABKUERZUNGSVERZEICHNIS
XXIII
A
GEGENSTAND
UND
GANG
DER
ARBEIT
1
B
MONTAGESYSTEME
5
B.
L
BESCHREIBUNG
DER
UNTERSUCHTEN
MONTAGESYSTEME
.
8
B.
1.1
KONVERGIERENDER,
ASYNCHRONER
MATERIALFLUSS
.
9
B.
L.
2
BLOCKIERUNG
NACH
BEARBEITUNG
UND
UNABHAENGIGE
BESTUECKUNG
.
12
B.L.
3
STOCHASTISCHE
BEARBEITUNGSZEITEN
.
17
B.L.
4
OPERATIONSZEITABHAENGIGE
MASCHINENAUSFAELLE
.
35
B.2
LEISTUNGSANALYSE
.
45
B.3
KONFIGURATIONSENTSCHEIDUNGEN
.
48
VII
VIII
IN
HA
ITSVERZEICHNIS
C
DIE
MODELLIERUNG
VON
MONTAGESYSTEMEN
65
0.1
WARTESCHLANGENNETZWERKE
.
65
C.
2
DEKOMPOSITION
VON
WARTESCHLANGENNETZEN
.
69
C.
3
APPROXIMATION
DER
WARTESCHLANGENBEZOGENEN
ZUSTANDSWAHR
SCHEINLICHKEITEN
.
76
C.
4
STAND
DER
FORSCHUNG
BEI
DER
ANALYSE
VON
MONTAGESYSTEMEN
.
83
0.4.1
MARKOW-MODELLE
.
84
0.4.2
DEKOMPOSITIONSANSAETZE
FUER
FLIESSPRODUKTIONSLINIEN
.
87
0.4.3
ANSAETZE
FUER
EINFACHE
MONTAGESYSTEME
.
90
0.4.4
DEKOMPOSITIONSANSAETZE
FUER
KOMPLEXE
MONTAGESYSTEME
.
92
D
DIE
ABSCHAETZUNG
DER
PRODUKTIONSRATE
EINES
MONTAGESY
STEMS
MIT
EINEM
DEKOMPOSITIONSANSATZ
*
DAS
VERFAHREN
ALRMGEN
95
D.
L
SYSTEME
MIT
JEWEILS
HOECHSTENS
ZWEI
ZULIEFERSTATIONEN
.
98
D.
1.1
APPROXIMATION
DER
ANKUNFTS-
UND
BEARBEITUNGSRATEN
SOWIE
DER
VARIATIONSKOEFFIZIENTEN
.
98
D.
L.
1.1
DIE
VIRTUELLE
BEARBEITUNGSZEIT
.
98
D.L.
1.1.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
BEARBEITUNGSZEIT
.
102
D.L.
1.1.2
DIE
BERECHNUNG
DER
ZEITPUNKTBEZOGENEN
BLOCKIERWAHRSCHEINLICHKEITEN
.
107
D.L.
1.1.3
DIE
BERECHNUNG
DER
VIRTUELLEN
BEARBEITUNGS
RATE
.
109
D.L.
1.1.4
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
BEARBEITUNGSZEIT
.
111
D.L.
1.2
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
.
116
D.L.
1.2.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.
121
D.L.
1.2.2
DIE
BERECHNUNG
DER
ZEITPUNKT
BEZOGENEN
LEERWAHRSCHEINLICHKEITEN
.
125
INHALTSVERZEICHNIS
IX
D.
1.1.2.3
DIE
BERECHNUNG
DER
VIRTUELLEN
ANKUNFTSRATE
.
127
D.
1.1.2.4
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.
128
D.1.2
DAS
VERFAHREN
ALRMGEN-2
.
130
D.1.3
RECHENERGEBNISSE
.
144
D.1.4
SPEZIALFAELLE
UND
VERGLEICHE:
SYSTEME
MIT
LINEAREM
MATE
RIALFLUSS
(FLIESSPRODUKTIONSLINIEN)
181
D.
1.4.1
DAS
VERFAHREN
VON
B
UZACOTT
,
LIU
UND
S
HANTHI
-
KUMAR
.
182
D.1.4.
2
DAS
VERFAHREN
VON
B
UERGER
.
184
D.2
SYSTEME
OHNE
OBERGRENZE
FUER
DIE
ANZAHL
AN
ZULIEFERSTATIONEN
195
D.2.1
APPROXIMATION
DER
ANKUNFTS-
UND
BEARBEITUNGSRATEN
SOWIE
DER
VARIATIONSKOEFFIZIENTEN
.
196
D.2.
1.1
DIE
VIRTUELLE
BEARBEITUNGSZEIT
.
196
D.2.
1.1.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
BEARBEITUNGSZEIT
.
196
D.2.
1.1.2
DIE
BERECHNUNG
DER
ZEITPUNKT
BEZOGENEN
GE
MEINSAMEN
LEERWAHRSCHEINLICHKEIT
.
199
D.2.
1.1.3
DIE
BESCHREIBUNG
DER
WAHRSCHEINLICHKEITS
VERTEILUNG
DES
MAXIMUMS
VON
ZWISCHENAN
KUNFTSZEITEN
.
200
D.2.
1.1.4
DIE
BERECHNUNG
DER
VIRTUELLEN
BEARBEITUNGS
RATE
.
204
D.2.
1.1.5
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
BEARBEITUNGSZEIT
.
205
D.2.
1.2
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
.
209
D.2.
1.2.1
ERWARTUNGSWERT
UND
VARIANZ
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.
209
D.2.
1.2.2
DIE
BERECHNUNG
DER
VIRTUELLEN
ANKUNFTSRATE
.
211
D.2.
1.2.3
DIE
BERECHNUNG
DES
VARIATIONSKOEFFIZIENTEN
DER
VIRTUELLEN
ZWISCHENANKUNFTSZEIT
.
213
X
INHALTSVERZEICHNIS
D.2.2
DAS
VERFAHREN
ALRMGEN-J
.
216
D.2.3
RECHENERGEBNISSE
.
221
D.2.4
SPEZIALFAELLE
UND
VERGLEICHE:
SYSTEME
MIT
EXPONENTIALVER-
TEILTEN
BEARBEITUNGSZEITEN
.
229
D.2.4.
1
DAS
VERFAHREN
VON
H
ELBER
.
231
D.2.4.
2
DAS
VERFAHREN
VON
J
EONG
UND
K
IM
.
241
E
DIE
ERWEITERUNG
DES
DEKOMPOSITIONSVERFAHRENS
ALRMGEN
UM
DIE
BERUECKSICHTIGUNG
DER
WERKSTUECKQUALITAET
249
E.
L
DIE
VIRTUELLE
ZWISCHENANKUNFTSZEIT
BEI
WERKSTUECKVERLUSTEN
.
.
253
E.
2
DAS
VERFAHREN
ALRMSGEN
.
256
E.
3
RECHENTESTS
.
258
F
SCHLUSSBETRACHTUNG
UND
AUSBLICK
267
LITERATURVERZEICHNIS
269 |
any_adam_object | 1 |
any_adam_object_boolean | 1 |
author | Manitz, Michael |
author_GND | (DE-588)130406643 |
author_facet | Manitz, Michael |
author_role | aut |
author_sort | Manitz, Michael |
author_variant | m m mm |
building | Verbundindex |
bvnumber | BV047831040 |
classification_rvk | QP 543 |
ctrlnum | (OCoLC)1310243462 (DE-599)DNB1173819630 |
dewey-full | 658.514 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.514 |
dewey-search | 658.514 |
dewey-sort | 3658.514 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
format | Thesis Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03607nam a2200841 c 4500</leader><controlfield tag="001">BV047831040</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20220330 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">220211s2019 gw a||| m||| 00||| ger d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">19,N01</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">19,A29</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">19,H08</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">1173819630</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783658242459</subfield><subfield code="c">Broschur : circa EUR 52.99 (DE), circa EUR 54.48 (AT), circa CHF 58.50 (freier Preis)</subfield><subfield code="9">978-3-658-24245-9</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3658242450</subfield><subfield code="9">3-658-24245-0</subfield></datafield><datafield tag="024" ind1="3" ind2=" "><subfield code="a">9783658242459</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">Bestellnummer: 978-3-658-24245-9</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">Bestellnummer: 87018809</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1310243462</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DNB1173819630</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">ger</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">XA-DE-HE</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-355</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.514</subfield><subfield code="2">23/ger</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 543</subfield><subfield code="0">(DE-625)141901:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">650</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Manitz, Michael</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)130406643</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten</subfield><subfield code="c">Michael Manitz</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Wiesbaden</subfield><subfield code="b">Springer Gabler</subfield><subfield code="c">[2019]</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XXIV, 284 Seiten</subfield><subfield code="b">Illustrationen</subfield><subfield code="c">24 cm, 519 g</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Edition KWV</subfield></datafield><datafield tag="502" ind1=" " ind2=" "><subfield code="b">Dissertation</subfield><subfield code="c">Universität zu Köln</subfield><subfield code="d">2004</subfield></datafield><datafield tag="534" ind1=" " ind2=" "><subfield code="c">2005</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Warteschlangentheorie</subfield><subfield code="0">(DE-588)4255044-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Leistungsbewertung</subfield><subfield code="0">(DE-588)4167271-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fließfertigung</subfield><subfield code="0">(DE-588)4154634-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Flexible Fertigung</subfield><subfield code="0">(DE-588)4017519-4</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Paperback / softback</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">BUS041000</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">KJC</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Automobilindustrie</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Leistungsanalyse</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Montagesysteme</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">flexible Produktion</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">stochastische Effekte</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">BUS087000</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">KJMV5</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">A</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">SC515010: Business Strategy/Leadership</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">SUCO41170: Economics and Finance</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">SC519010: Production</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">BUS041000</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">KJC</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">1784: Hardcover, Softcover / Wirtschaft/Management</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Flexible Fertigung</subfield><subfield code="0">(DE-588)4017519-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Fließfertigung</subfield><subfield code="0">(DE-588)4154634-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Leistungsbewertung</subfield><subfield code="0">(DE-588)4167271-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="3"><subfield code="a">Warteschlangentheorie</subfield><subfield code="0">(DE-588)4255044-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">Springer Fachmedien Wiesbaden</subfield><subfield code="0">(DE-588)1043386068</subfield><subfield code="4">pbl</subfield></datafield><datafield tag="775" ind1="0" ind2="8"><subfield code="i">Nachdruck von</subfield><subfield code="a">Manitz, Michael</subfield><subfield code="t">Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten</subfield><subfield code="d">Köln : Kölner Wiss.-Verl., 2005</subfield><subfield code="h">XXIV, 284 S., graph. Darst.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Online-Ausgabe</subfield><subfield code="a">Manitz, Michael</subfield><subfield code="t">Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten</subfield><subfield code="b">1. Auflage 2005, Nachdruck 2019</subfield><subfield code="d">Wiesbaden : Springer Fachmedien Wiesbaden, 2005</subfield><subfield code="h">Online-Ressource</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">X:MVB</subfield><subfield code="q">text/html</subfield><subfield code="u">http://deposit.dnb.de/cgi-bin/dokserv?id=32b7429816754656bfc9c5e519632a34&prov=M&dok_var=1&dok_ext=htm</subfield><subfield code="3">Inhaltstext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">X:MVB</subfield><subfield code="u">http://www.springer.com/</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">B:DE-101</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://d-nb.info/1173819630/04</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=033214276&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-033214276</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV047831040 |
illustrated | Illustrated |
index_date | 2024-07-03T19:09:22Z |
indexdate | 2024-07-10T09:22:31Z |
institution | BVB |
institution_GND | (DE-588)1043386068 |
isbn | 9783658242459 3658242450 |
language | German |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-033214276 |
oclc_num | 1310243462 |
open_access_boolean | |
owner | DE-355 DE-BY-UBR |
owner_facet | DE-355 DE-BY-UBR |
physical | XXIV, 284 Seiten Illustrationen 24 cm, 519 g |
publishDate | 2019 |
publishDateSearch | 2019 |
publishDateSort | 2019 |
publisher | Springer Gabler |
record_format | marc |
series2 | Edition KWV |
spelling | Manitz, Michael Verfasser (DE-588)130406643 aut Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Michael Manitz Wiesbaden Springer Gabler [2019] XXIV, 284 Seiten Illustrationen 24 cm, 519 g txt rdacontent n rdamedia nc rdacarrier Edition KWV Dissertation Universität zu Köln 2004 2005 Warteschlangentheorie (DE-588)4255044-0 gnd rswk-swf Leistungsbewertung (DE-588)4167271-9 gnd rswk-swf Fließfertigung (DE-588)4154634-9 gnd rswk-swf Flexible Fertigung (DE-588)4017519-4 gnd rswk-swf Paperback / softback BUS041000 KJC Automobilindustrie Leistungsanalyse Montagesysteme flexible Produktion stochastische Effekte BUS087000 KJMV5 A SC515010: Business Strategy/Leadership SUCO41170: Economics and Finance SC519010: Production 1784: Hardcover, Softcover / Wirtschaft/Management (DE-588)4113937-9 Hochschulschrift gnd-content Flexible Fertigung (DE-588)4017519-4 s Fließfertigung (DE-588)4154634-9 s Leistungsbewertung (DE-588)4167271-9 s Warteschlangentheorie (DE-588)4255044-0 s DE-604 Springer Fachmedien Wiesbaden (DE-588)1043386068 pbl Nachdruck von Manitz, Michael Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Köln : Kölner Wiss.-Verl., 2005 XXIV, 284 S., graph. Darst. Erscheint auch als Online-Ausgabe Manitz, Michael Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten 1. Auflage 2005, Nachdruck 2019 Wiesbaden : Springer Fachmedien Wiesbaden, 2005 Online-Ressource X:MVB text/html http://deposit.dnb.de/cgi-bin/dokserv?id=32b7429816754656bfc9c5e519632a34&prov=M&dok_var=1&dok_ext=htm Inhaltstext X:MVB http://www.springer.com/ B:DE-101 application/pdf http://d-nb.info/1173819630/04 Inhaltsverzeichnis DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=033214276&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Manitz, Michael Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Warteschlangentheorie (DE-588)4255044-0 gnd Leistungsbewertung (DE-588)4167271-9 gnd Fließfertigung (DE-588)4154634-9 gnd Flexible Fertigung (DE-588)4017519-4 gnd |
subject_GND | (DE-588)4255044-0 (DE-588)4167271-9 (DE-588)4154634-9 (DE-588)4017519-4 (DE-588)4113937-9 |
title | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |
title_auth | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |
title_exact_search | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |
title_exact_search_txtP | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |
title_full | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Michael Manitz |
title_fullStr | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Michael Manitz |
title_full_unstemmed | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten Michael Manitz |
title_short | Leistungsanalyse von Montagesystemen mit stochastischen Bearbeitungszeiten |
title_sort | leistungsanalyse von montagesystemen mit stochastischen bearbeitungszeiten |
topic | Warteschlangentheorie (DE-588)4255044-0 gnd Leistungsbewertung (DE-588)4167271-9 gnd Fließfertigung (DE-588)4154634-9 gnd Flexible Fertigung (DE-588)4017519-4 gnd |
topic_facet | Warteschlangentheorie Leistungsbewertung Fließfertigung Flexible Fertigung Hochschulschrift |
url | http://deposit.dnb.de/cgi-bin/dokserv?id=32b7429816754656bfc9c5e519632a34&prov=M&dok_var=1&dok_ext=htm http://www.springer.com/ http://d-nb.info/1173819630/04 http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=033214276&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT manitzmichael leistungsanalysevonmontagesystemenmitstochastischenbearbeitungszeiten AT springerfachmedienwiesbaden leistungsanalysevonmontagesystemenmitstochastischenbearbeitungszeiten |