Cost estimation in plant construction:
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Würzburg
Vogel Communications Group
2021
|
Ausgabe: | 1st edition |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | 184 Seiten Diagramme 24 cm x 17 cm |
ISBN: | 3834334952 9783834334954 |
Internformat
MARC
LEADER | 00000nam a22000008c 4500 | ||
---|---|---|---|
001 | BV047409213 | ||
003 | DE-604 | ||
005 | 20220929 | ||
007 | t | ||
008 | 210810s2021 gw |||| |||| 00||| eng d | ||
015 | |a 21,N31 |2 dnb | ||
016 | 7 | |a 1237912032 |2 DE-101 | |
020 | |a 3834334952 |9 3-8343-3495-2 | ||
020 | |a 9783834334954 |c : EUR 119.00 (DE), EUR 123.00 (AT) |9 978-3-8343-3495-4 | ||
024 | 3 | |a 9783834334954 | |
035 | |a (OCoLC)1262737742 | ||
035 | |a (DE-599)DNB1237912032 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
044 | |a gw |c XA-DE-BY | ||
049 | |a DE-29T |a DE-210 |a DE-12 |a DE-91G |a DE-20 | ||
084 | |a QP 544 |0 (DE-625)141902: |2 rvk | ||
084 | |a CIT 410 |2 stub | ||
084 | |8 1\p |a 660 |2 23sdnb | ||
100 | 1 | |a Kar, Ibrahim |d 1970- |e Verfasser |0 (DE-588)120516510X |4 aut | |
245 | 1 | 0 | |a Cost estimation in plant construction |c Ibrahim Kar, Michael Berz |
250 | |a 1st edition | ||
264 | 1 | |a Würzburg |b Vogel Communications Group |c 2021 | |
300 | |a 184 Seiten |b Diagramme |c 24 cm x 17 cm | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
650 | 0 | 7 | |a Verfahrensindustrie |0 (DE-588)4443423-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Chemieanlage |0 (DE-588)4121084-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Anlagenbau |0 (DE-588)4120898-5 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Anlagenplanung |0 (DE-588)4002100-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Kostenschätzung |0 (DE-588)4114297-4 |2 gnd |9 rswk-swf |
653 | |a 10% cost estimates, 30% cost estimates, 50% cost estimates, appraise, | ||
653 | |a Aspen, basis of estimate, vessel cost, bulk material costs, brownfield, CAPEX | ||
653 | |a MTO-based cost estimates, operate, OPEX, piping factor, process, project phases, process engineering, pump costs | ||
653 | |a chemical plant engineering, class 2, class 4, class 5, concept, construction costs | ||
653 | |a cost estimate detail, cost estimate summary, cost estimates, DACE, define, estimating plan | ||
653 | |a cost estimation methods, cost estimation types, cost estimating plan, Lang factor, Lindelist, material take-off, | ||
653 | |a execute, factorised cost estimates, feasibility, FEED, FEL-1, FEL-2, FEL-3, | ||
653 | |a front end engineering design, greenfield, Hand factor, key quantities list, column cost, cost categories, cost estimation classes, cost estimation | ||
653 | |a select, six tenths factor, software-based estimation, heat exchanger costs | ||
689 | 0 | 0 | |a Kostenschätzung |0 (DE-588)4114297-4 |D s |
689 | 0 | 1 | |a Anlagenbau |0 (DE-588)4120898-5 |D s |
689 | 0 | 2 | |a Verfahrensindustrie |0 (DE-588)4443423-6 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Anlagenbau |0 (DE-588)4120898-5 |D s |
689 | 1 | 1 | |a Kostenschätzung |0 (DE-588)4114297-4 |D s |
689 | 1 | 2 | |a Anlagenplanung |0 (DE-588)4002100-2 |D s |
689 | 1 | 3 | |a Chemieanlage |0 (DE-588)4121084-0 |D s |
689 | 1 | |5 DE-604 | |
700 | 1 | |a Berz, Michael |d 1986- |e Verfasser |0 (DE-588)1205165150 |4 aut | |
710 | 2 | |a Vogel Business Media |0 (DE-588)106543412X |4 pbl | |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=032810134&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-032810134 | ||
883 | 1 | |8 1\p |a vlb |d 20210730 |q DE-101 |u https://d-nb.info/provenance/plan#vlb |
Datensatz im Suchindex
_version_ | 1804182675353763840 |
---|---|
adam_text | TABLE
OF
CONTENTS
PREFACE
...........................................................................................................................................
5
1
BASICS
OF
COST
ESTIMATION
...............................................................................................
11
1.1
PURPOSE
AND
OBJECTIVES
OF
COST
ESTIMATES
...........................................................
11
1.2
KEY
TERMINOLOGY
USED
IN
COST
ESTIMATES
.............................................................
12
2
COST
ESTIMATES
IN
THE
PROJECT
PHASES
.........................................................................
13
2.1
FEL-1:
APPRAISE
(FEASIBILITY)
.....................................................................................
14
2.2
FEL-2:
SELECT
(CONCEPT)
............................................................................................
14
2.3
FEL-3:
DEFINE
(FRONT-END
ENGINEERING
DESIGN
(FEED))
..........................................
15
2.4
EXECUTE
.......................................................................................................................
15
2.5
OPERATE
.......................................................................................................................
15
2.6
DEVELOPMENT
OF
COSTS
DEPENDING
ON
PROJECT
PHASES
..........................................
15
3
COST
ESTIMATION
TYPES
RESP.
CLASSES
............................................................................
17
3.1
50
%
COST
ESTIMATES
(CLASS
5)
.........................................................................
17
3.2
30
%
COST
ESTIMATES
(CLASS
4)
.........................................................................
17
3.3
10
%
COST
ESTIMATES
(CLASS
2)
.........................................................................
17
4
COST
ESTIMATION
METHODS
...............................................................................................
19
4.1
FACTORISED
COST
ESTIMATES
.........................................................................................
19
4.1.1
LANG
FACTOR
................................................................................................
19
4.1.2
HAND
FACTOR
...............................................................................................
20
4.1.3
CHECKLIST
FOR
FACTORISED
COST
ESTIMATES
.................................................
21
4.2
COST
ESTIMATES
BASED
ON
COMPARABLE
PROJECTS
....................................................
21
4.3
MATERIAL
TAKE-OFF
(MT0-)
BASED
COST
ESTIMATES
...................................................
22
4.3.1
STRUCTURE
AND
APPROACH
..........................................................................
22
4.3.1.1
MTO
FOR
EQUIPMENT
................................................................
23
4.3.1.2
MTO
FOR
CIVIL
&
STEEL
.............................................................
23
4.3.1.3
MTO
FOR
PIPING
.........................................................................
25
4.3.1.4
MTO
FOR
E&L
(ELECTRICAL
AND
INSTRUMENTATION)
......................
27
4.3.1.5
MTO
FOR
INSULATION
AND
PAINTING
..........................................
29
4.3.1.6
MTO
FOR
TEMPORARY
FACILITIES
.................................................
30
4.4
FACTORISED
COST
ESTIMATES
VERSUS
MTO-BASED
COST
ESTIMATES
...........................
31
4.5
TYPICAL
SHORTCOMINGS
OF
COST
ESTIMATES
...............................................................
31
5
STRUCTURE
OF
COST
ESTIMATES
...........................................................................................
33
5.1
ESTIMATING
PLAN
..........................................................................................................
33
5.2
BASIS
OF
ESTIMATE
.......................................................................................................
34
5.3
COST
ESTIMATE
SUMMARY
AND
DETAILS
............................................................
35
5.3.1
COST
ESTIMATE
SUMMARY
...........................................................................
35
5.3.2
COST
ESTIMATE
DETAILS
................................................................................
41
5.4
KEY
QUANTITIES
...........................................................................................................
41
5.5
DIFFERENT
COST
CATEGORIES
(CAPEX
AND
OPEX)
....................................................
44
6
KEY
COMPONENTS
OF
A
COST
ESTIMATE
..........................................................................
47
7
DETERMINATION
OF
ENGINEERING
COSTS
...........................................................................
53
8
ESTIMATION
OF
PROCUREMENT
COSTS
.................................................................................
57
8.1
ESTIMATION
OF
EQUIPMENT
COSTS
...............................................................................
57
8.1.1
SIX-TENTHS
FACTOR
........................................................................................
57
8.1.2
VESSEL
COST
ESTIMATE
BY
WEIGHT
DEPENDING
ON
THE
MATERIAL
...........
58
8.1.3
ESTIMATE
OF
HEAT
EXCHANGER
COSTS
OVER
THE
HEAT
TRANSFER
AREA
DEPENDING
ON
THE
MATERIAL
.....................................................................
61
8.1.4
COLUMN
COST
ESTIMATE
BY
WEIGHT
DEPENDING
ON
THE
MATERIAL
........
64
8.1.5
PUMP
COST
ESTIMATE
BASED
ON
MOTOR
POWER
IN
RELATION
TO
THE
MATERIAL
.......................................................................................................
68
8.2
ESTIMATION
OF
BULK
MATERIAL
COSTS
..........................................................................
72
8.2.1
PIPING
MATERIAL
...........................................................................................
72
8.2.2
ELECTRICAL
MATERIAL
.......................................................................................
72
8.2.3
INSTRUMENTATION
MATERIAL
...........................................................................
73
8.3
OVERVIEW
OF
MATERIAL
CORRECTION
FACTORS
...............................................................
74
9
ESTIMATION
OF
CONSTRUCTION
COSTS
.................................................................................
75
9.1
MECHANICAL
INSTALLATION
OF
EQUIPMENT
......................................................................
75
9.2
BULK
MATERIAL
INSTALLATION
..........................................................................................
76
9.2.1
DIFFERENT
PIPING
FACTORS
............................................................................
76
9.2.1.1
DACE
.........................................................................................
76
9.2.1.2
LINDE
LIST
...................................................................................
81
9.2.2
ELECTRICAL
AND
INSTRUMENTATION
INSTALLATION
...............................................
81
9.2.3
CIVIL
&
STEEL
(DELIVERY
AND
INSTALLATION)
....................................................
82
9.3
SUMMARY
.....................................................................................................................
83
10
MISCELLANEOUS
.......................................................................................................................
85
10.1
CONSTRUCTION
MANAGEMENT
.......................................................................................
85
10.2
INDIRECT
COSTS
..............................................................................................................
85
10.3
COMPLETION
PHASE
.....................................................................................................
86
10.4
ALLOWANCES
..................................................................................................................
86
10.5
ESCALATION
....................................................................................................................
87
10.6
CONTINGENCY
................................................................................................................
90
11
EXAMPLES
..............................................................................................................................
91
11.1
COST
ESTIMATION
BASED
ON
THIS
BOOK
.....................................................................
92
11.1.1
50
%
COST
ESTIMATE
............................................................................
92
11.1.2
30
%
COST
ESTIMATE
............................................................................
97
11.1.3
COST
ESTIMATE
COMPARISON
......................................................................
105
11.2
SOFTWARE-BASED
ESTIMATION
WITH
ASPEN
.................................................................105
12
FINAL
CONSIDERATIONS
AND
OUTLOOK
................................................................................
111
13
ATTACHMENT
...........................................................................................................................
113
A.1
ESTIMATING
PLAN
TEMPLATE
...........................................................................................
114
A.
2
BASIS
OF
ESTIMATE
TEMPLATE
........................................................................................126
A.
3
COST
ESTIMATE
TEMPLATE
.............................................................................................143
A.4
KEY
QUANTITIES
TEMPLATE
.............................................................................................156
A.
5
ESCALATION
TEMPLATE
.....................................................................................................
162
A.6
PROJECT
CHECKLIST
TEMPLATE
.........................................................................................167
ABBREVIATIONS
.................................................................................................................................
173
GLOSSARY
...........................................................................................................................................175
LIST
OF
TABLES
.................................................................................................................................
177
BIBLIOGRAPHY
...................................................................................................................................179
KEYWORD
INDEX
.............................................................................................................................
183
|
adam_txt |
TABLE
OF
CONTENTS
PREFACE
.
5
1
BASICS
OF
COST
ESTIMATION
.
11
1.1
PURPOSE
AND
OBJECTIVES
OF
COST
ESTIMATES
.
11
1.2
KEY
TERMINOLOGY
USED
IN
COST
ESTIMATES
.
12
2
COST
ESTIMATES
IN
THE
PROJECT
PHASES
.
13
2.1
FEL-1:
APPRAISE
(FEASIBILITY)
.
14
2.2
FEL-2:
SELECT
(CONCEPT)
.
14
2.3
FEL-3:
DEFINE
(FRONT-END
ENGINEERING
DESIGN
(FEED))
.
15
2.4
EXECUTE
.
15
2.5
OPERATE
.
15
2.6
DEVELOPMENT
OF
COSTS
DEPENDING
ON
PROJECT
PHASES
.
15
3
COST
ESTIMATION
TYPES
RESP.
CLASSES
.
17
3.1
50
%
COST
ESTIMATES
(CLASS
5)
.
17
3.2
30
%
COST
ESTIMATES
(CLASS
4)
.
17
3.3
10
%
COST
ESTIMATES
(CLASS
2)
.
17
4
COST
ESTIMATION
METHODS
.
19
4.1
FACTORISED
COST
ESTIMATES
.
19
4.1.1
LANG
FACTOR
.
19
4.1.2
HAND
FACTOR
.
20
4.1.3
CHECKLIST
FOR
FACTORISED
COST
ESTIMATES
.
21
4.2
COST
ESTIMATES
BASED
ON
COMPARABLE
PROJECTS
.
21
4.3
MATERIAL
TAKE-OFF
(MT0-)
BASED
COST
ESTIMATES
.
22
4.3.1
STRUCTURE
AND
APPROACH
.
22
4.3.1.1
MTO
FOR
EQUIPMENT
.
23
4.3.1.2
MTO
FOR
CIVIL
&
STEEL
.
23
4.3.1.3
MTO
FOR
PIPING
.
25
4.3.1.4
MTO
FOR
E&L
(ELECTRICAL
AND
INSTRUMENTATION)
.
27
4.3.1.5
MTO
FOR
INSULATION
AND
PAINTING
.
29
4.3.1.6
MTO
FOR
TEMPORARY
FACILITIES
.
30
4.4
FACTORISED
COST
ESTIMATES
VERSUS
MTO-BASED
COST
ESTIMATES
.
31
4.5
TYPICAL
SHORTCOMINGS
OF
COST
ESTIMATES
.
31
5
STRUCTURE
OF
COST
ESTIMATES
.
33
5.1
ESTIMATING
PLAN
.
33
5.2
BASIS
OF
ESTIMATE
.
34
5.3
COST
ESTIMATE
"SUMMARY"
AND
"DETAILS"
.
35
5.3.1
COST
ESTIMATE
SUMMARY
.
35
5.3.2
COST
ESTIMATE
DETAILS
.
41
5.4
KEY
QUANTITIES
.
41
5.5
DIFFERENT
COST
CATEGORIES
(CAPEX
AND
OPEX)
.
44
6
KEY
COMPONENTS
OF
A
COST
ESTIMATE
.
47
7
DETERMINATION
OF
ENGINEERING
COSTS
.
53
8
ESTIMATION
OF
PROCUREMENT
COSTS
.
57
8.1
ESTIMATION
OF
EQUIPMENT
COSTS
.
57
8.1.1
SIX-TENTHS
FACTOR
.
57
8.1.2
VESSEL
COST
ESTIMATE
BY
WEIGHT
DEPENDING
ON
THE
MATERIAL
.
58
8.1.3
ESTIMATE
OF
HEAT
EXCHANGER
COSTS
OVER
THE
HEAT
TRANSFER
AREA
DEPENDING
ON
THE
MATERIAL
.
61
8.1.4
COLUMN
COST
ESTIMATE
BY
WEIGHT
DEPENDING
ON
THE
MATERIAL
.
64
8.1.5
PUMP
COST
ESTIMATE
BASED
ON
MOTOR
POWER
IN
RELATION
TO
THE
MATERIAL
.
68
8.2
ESTIMATION
OF
BULK
MATERIAL
COSTS
.
72
8.2.1
PIPING
MATERIAL
.
72
8.2.2
ELECTRICAL
MATERIAL
.
72
8.2.3
INSTRUMENTATION
MATERIAL
.
73
8.3
OVERVIEW
OF
MATERIAL
CORRECTION
FACTORS
.
74
9
ESTIMATION
OF
CONSTRUCTION
COSTS
.
75
9.1
MECHANICAL
INSTALLATION
OF
EQUIPMENT
.
75
9.2
BULK
MATERIAL
INSTALLATION
.
76
9.2.1
DIFFERENT
PIPING
FACTORS
.
76
9.2.1.1
DACE
.
76
9.2.1.2
LINDE
LIST
.
81
9.2.2
ELECTRICAL
AND
INSTRUMENTATION
INSTALLATION
.
81
9.2.3
CIVIL
&
STEEL
(DELIVERY
AND
INSTALLATION)
.
82
9.3
SUMMARY
.
83
10
MISCELLANEOUS
.
85
10.1
CONSTRUCTION
MANAGEMENT
.
85
10.2
INDIRECT
COSTS
.
85
10.3
COMPLETION
PHASE
.
86
10.4
ALLOWANCES
.
86
10.5
ESCALATION
.
87
10.6
CONTINGENCY
.
90
11
EXAMPLES
.
91
11.1
COST
ESTIMATION
BASED
ON
THIS
BOOK
.
92
11.1.1
50
%
COST
ESTIMATE
.
92
11.1.2
30
%
COST
ESTIMATE
.
97
11.1.3
COST
ESTIMATE
COMPARISON
.
105
11.2
SOFTWARE-BASED
ESTIMATION
WITH
ASPEN
.105
12
FINAL
CONSIDERATIONS
AND
OUTLOOK
.
111
13
ATTACHMENT
.
113
A.1
ESTIMATING
PLAN
TEMPLATE
.
114
A.
2
BASIS
OF
ESTIMATE
TEMPLATE
.126
A.
3
COST
ESTIMATE
TEMPLATE
.143
A.4
KEY
QUANTITIES
TEMPLATE
.156
A.
5
ESCALATION
TEMPLATE
.
162
A.6
PROJECT
CHECKLIST
TEMPLATE
.167
ABBREVIATIONS
.
173
GLOSSARY
.175
LIST
OF
TABLES
.
177
BIBLIOGRAPHY
.179
KEYWORD
INDEX
.
183 |
any_adam_object | 1 |
any_adam_object_boolean | 1 |
author | Kar, Ibrahim 1970- Berz, Michael 1986- |
author_GND | (DE-588)120516510X (DE-588)1205165150 |
author_facet | Kar, Ibrahim 1970- Berz, Michael 1986- |
author_role | aut aut |
author_sort | Kar, Ibrahim 1970- |
author_variant | i k ik m b mb |
building | Verbundindex |
bvnumber | BV047409213 |
classification_rvk | QP 544 |
classification_tum | CIT 410 |
ctrlnum | (OCoLC)1262737742 (DE-599)DNB1237912032 |
discipline | Chemie-Ingenieurwesen Wirtschaftswissenschaften |
discipline_str_mv | Chemie-Ingenieurwesen Wirtschaftswissenschaften |
edition | 1st edition |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03332nam a22006858c 4500</leader><controlfield tag="001">BV047409213</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20220929 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">210810s2021 gw |||| |||| 00||| eng d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">21,N31</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">1237912032</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3834334952</subfield><subfield code="9">3-8343-3495-2</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783834334954</subfield><subfield code="c">: EUR 119.00 (DE), EUR 123.00 (AT)</subfield><subfield code="9">978-3-8343-3495-4</subfield></datafield><datafield tag="024" ind1="3" ind2=" "><subfield code="a">9783834334954</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1262737742</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DNB1237912032</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">XA-DE-BY</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-29T</subfield><subfield code="a">DE-210</subfield><subfield code="a">DE-12</subfield><subfield code="a">DE-91G</subfield><subfield code="a">DE-20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 544</subfield><subfield code="0">(DE-625)141902:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">CIT 410</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="8">1\p</subfield><subfield code="a">660</subfield><subfield code="2">23sdnb</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Kar, Ibrahim</subfield><subfield code="d">1970-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)120516510X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Cost estimation in plant construction</subfield><subfield code="c">Ibrahim Kar, Michael Berz</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st edition</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Würzburg</subfield><subfield code="b">Vogel Communications Group</subfield><subfield code="c">2021</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">184 Seiten</subfield><subfield code="b">Diagramme</subfield><subfield code="c">24 cm x 17 cm</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Verfahrensindustrie</subfield><subfield code="0">(DE-588)4443423-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Chemieanlage</subfield><subfield code="0">(DE-588)4121084-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Anlagenbau</subfield><subfield code="0">(DE-588)4120898-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Anlagenplanung</subfield><subfield code="0">(DE-588)4002100-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kostenschätzung</subfield><subfield code="0">(DE-588)4114297-4</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">10% cost estimates, 30% cost estimates, 50% cost estimates, appraise,</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Aspen, basis of estimate, vessel cost, bulk material costs, brownfield, CAPEX</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">MTO-based cost estimates, operate, OPEX, piping factor, process, project phases, process engineering, pump costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">chemical plant engineering, class 2, class 4, class 5, concept, construction costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">cost estimate detail, cost estimate summary, cost estimates, DACE, define, estimating plan</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">cost estimation methods, cost estimation types, cost estimating plan, Lang factor, Lindelist, material take-off,</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">execute, factorised cost estimates, feasibility, FEED, FEL-1, FEL-2, FEL-3,</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">front end engineering design, greenfield, Hand factor, key quantities list, column cost, cost categories, cost estimation classes, cost estimation</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">select, six tenths factor, software-based estimation, heat exchanger costs</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Kostenschätzung</subfield><subfield code="0">(DE-588)4114297-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Anlagenbau</subfield><subfield code="0">(DE-588)4120898-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Verfahrensindustrie</subfield><subfield code="0">(DE-588)4443423-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Anlagenbau</subfield><subfield code="0">(DE-588)4120898-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Kostenschätzung</subfield><subfield code="0">(DE-588)4114297-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="2"><subfield code="a">Anlagenplanung</subfield><subfield code="0">(DE-588)4002100-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="3"><subfield code="a">Chemieanlage</subfield><subfield code="0">(DE-588)4121084-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Berz, Michael</subfield><subfield code="d">1986-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)1205165150</subfield><subfield code="4">aut</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">Vogel Business Media</subfield><subfield code="0">(DE-588)106543412X</subfield><subfield code="4">pbl</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=032810134&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-032810134</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">vlb</subfield><subfield code="d">20210730</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#vlb</subfield></datafield></record></collection> |
id | DE-604.BV047409213 |
illustrated | Not Illustrated |
index_date | 2024-07-03T17:55:00Z |
indexdate | 2024-07-10T09:11:19Z |
institution | BVB |
institution_GND | (DE-588)106543412X |
isbn | 3834334952 9783834334954 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-032810134 |
oclc_num | 1262737742 |
open_access_boolean | |
owner | DE-29T DE-210 DE-12 DE-91G DE-BY-TUM DE-20 |
owner_facet | DE-29T DE-210 DE-12 DE-91G DE-BY-TUM DE-20 |
physical | 184 Seiten Diagramme 24 cm x 17 cm |
publishDate | 2021 |
publishDateSearch | 2021 |
publishDateSort | 2021 |
publisher | Vogel Communications Group |
record_format | marc |
spelling | Kar, Ibrahim 1970- Verfasser (DE-588)120516510X aut Cost estimation in plant construction Ibrahim Kar, Michael Berz 1st edition Würzburg Vogel Communications Group 2021 184 Seiten Diagramme 24 cm x 17 cm txt rdacontent n rdamedia nc rdacarrier Verfahrensindustrie (DE-588)4443423-6 gnd rswk-swf Chemieanlage (DE-588)4121084-0 gnd rswk-swf Anlagenbau (DE-588)4120898-5 gnd rswk-swf Anlagenplanung (DE-588)4002100-2 gnd rswk-swf Kostenschätzung (DE-588)4114297-4 gnd rswk-swf 10% cost estimates, 30% cost estimates, 50% cost estimates, appraise, Aspen, basis of estimate, vessel cost, bulk material costs, brownfield, CAPEX MTO-based cost estimates, operate, OPEX, piping factor, process, project phases, process engineering, pump costs chemical plant engineering, class 2, class 4, class 5, concept, construction costs cost estimate detail, cost estimate summary, cost estimates, DACE, define, estimating plan cost estimation methods, cost estimation types, cost estimating plan, Lang factor, Lindelist, material take-off, execute, factorised cost estimates, feasibility, FEED, FEL-1, FEL-2, FEL-3, front end engineering design, greenfield, Hand factor, key quantities list, column cost, cost categories, cost estimation classes, cost estimation select, six tenths factor, software-based estimation, heat exchanger costs Kostenschätzung (DE-588)4114297-4 s Anlagenbau (DE-588)4120898-5 s Verfahrensindustrie (DE-588)4443423-6 s DE-604 Anlagenplanung (DE-588)4002100-2 s Chemieanlage (DE-588)4121084-0 s Berz, Michael 1986- Verfasser (DE-588)1205165150 aut Vogel Business Media (DE-588)106543412X pbl DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=032810134&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis 1\p vlb 20210730 DE-101 https://d-nb.info/provenance/plan#vlb |
spellingShingle | Kar, Ibrahim 1970- Berz, Michael 1986- Cost estimation in plant construction Verfahrensindustrie (DE-588)4443423-6 gnd Chemieanlage (DE-588)4121084-0 gnd Anlagenbau (DE-588)4120898-5 gnd Anlagenplanung (DE-588)4002100-2 gnd Kostenschätzung (DE-588)4114297-4 gnd |
subject_GND | (DE-588)4443423-6 (DE-588)4121084-0 (DE-588)4120898-5 (DE-588)4002100-2 (DE-588)4114297-4 |
title | Cost estimation in plant construction |
title_auth | Cost estimation in plant construction |
title_exact_search | Cost estimation in plant construction |
title_exact_search_txtP | Cost estimation in plant construction |
title_full | Cost estimation in plant construction Ibrahim Kar, Michael Berz |
title_fullStr | Cost estimation in plant construction Ibrahim Kar, Michael Berz |
title_full_unstemmed | Cost estimation in plant construction Ibrahim Kar, Michael Berz |
title_short | Cost estimation in plant construction |
title_sort | cost estimation in plant construction |
topic | Verfahrensindustrie (DE-588)4443423-6 gnd Chemieanlage (DE-588)4121084-0 gnd Anlagenbau (DE-588)4120898-5 gnd Anlagenplanung (DE-588)4002100-2 gnd Kostenschätzung (DE-588)4114297-4 gnd |
topic_facet | Verfahrensindustrie Chemieanlage Anlagenbau Anlagenplanung Kostenschätzung |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=032810134&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT karibrahim costestimationinplantconstruction AT berzmichael costestimationinplantconstruction AT vogelbusinessmedia costestimationinplantconstruction |