Project Scheduling with Time Windows: From Theory to Applications
Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order prod...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Heidelberg
Physica-Verlag HD
2002
|
Ausgabe: | 1st ed. 2002 |
Schriftenreihe: | Contributions to Management Science
|
Schlagworte: | |
Online-Zugang: | BTU01 Volltext |
Zusammenfassung: | Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning. The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach |
Beschreibung: | 1 Online-Ressource (X, 166 p) |
ISBN: | 9783642575068 |
DOI: | 10.1007/978-3-642-57506-8 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV046872874 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 200828s2002 |||| o||u| ||||||eng d | ||
020 | |a 9783642575068 |9 978-3-642-57506-8 | ||
024 | 7 | |a 10.1007/978-3-642-57506-8 |2 doi | |
035 | |a (ZDB-2-SBE)978-3-642-57506-8 | ||
035 | |a (OCoLC)863666541 | ||
035 | |a (DE-599)BVBBV046872874 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-634 | ||
082 | 0 | |a 658.1 |2 23 | |
084 | |a QH 465 |0 (DE-625)141600: |2 rvk | ||
084 | |a QP 360 |0 (DE-625)141869: |2 rvk | ||
100 | 1 | |a Dorndorf, Ulrich |e Verfasser |4 aut | |
245 | 1 | 0 | |a Project Scheduling with Time Windows |b From Theory to Applications |c by Ulrich Dorndorf |
250 | |a 1st ed. 2002 | ||
264 | 1 | |a Heidelberg |b Physica-Verlag HD |c 2002 | |
300 | |a 1 Online-Ressource (X, 166 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Contributions to Management Science | |
520 | |a Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning. The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach | ||
650 | 4 | |a Organization | |
650 | 4 | |a Operations Research/Decision Theory | |
650 | 4 | |a Artificial Intelligence | |
650 | 4 | |a Organization | |
650 | 4 | |a Planning | |
650 | 4 | |a Operations research | |
650 | 4 | |a Decision making | |
650 | 4 | |a Artificial intelligence | |
650 | 0 | 7 | |a Branch-and-Bound-Methode |0 (DE-588)4146449-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Optimierung |0 (DE-588)4043664-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Projektplanung |0 (DE-588)4115649-3 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a Projektplanung |0 (DE-588)4115649-3 |D s |
689 | 0 | 1 | |a Optimierung |0 (DE-588)4043664-0 |D s |
689 | 0 | 2 | |a Branch-and-Bound-Methode |0 (DE-588)4146449-7 |D s |
689 | 0 | |5 DE-604 | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783790815160 |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783642575075 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-3-642-57506-8 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-2-SBE |a ZDB-2-BAE | ||
940 | 1 | |q ZDB-2-SBE_Archiv | |
999 | |a oai:aleph.bib-bvb.de:BVB01-032283006 | ||
966 | e | |u https://doi.org/10.1007/978-3-642-57506-8 |l BTU01 |p ZDB-2-SBE |q ZDB-2-SBE_Archiv |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804181722370146304 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Dorndorf, Ulrich |
author_facet | Dorndorf, Ulrich |
author_role | aut |
author_sort | Dorndorf, Ulrich |
author_variant | u d ud |
building | Verbundindex |
bvnumber | BV046872874 |
classification_rvk | QH 465 QP 360 |
collection | ZDB-2-SBE ZDB-2-BAE |
ctrlnum | (ZDB-2-SBE)978-3-642-57506-8 (OCoLC)863666541 (DE-599)BVBBV046872874 |
dewey-full | 658.1 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.1 |
dewey-search | 658.1 |
dewey-sort | 3658.1 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
doi_str_mv | 10.1007/978-3-642-57506-8 |
edition | 1st ed. 2002 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02873nmm a2200613zc 4500</leader><controlfield tag="001">BV046872874</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">200828s2002 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783642575068</subfield><subfield code="9">978-3-642-57506-8</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-3-642-57506-8</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-2-SBE)978-3-642-57506-8</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)863666541</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV046872874</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.1</subfield><subfield code="2">23</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QH 465</subfield><subfield code="0">(DE-625)141600:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 360</subfield><subfield code="0">(DE-625)141869:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Dorndorf, Ulrich</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Project Scheduling with Time Windows</subfield><subfield code="b">From Theory to Applications</subfield><subfield code="c">by Ulrich Dorndorf</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed. 2002</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Heidelberg</subfield><subfield code="b">Physica-Verlag HD</subfield><subfield code="c">2002</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (X, 166 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Contributions to Management Science</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning. The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Organization</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations Research/Decision Theory</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Artificial Intelligence</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Organization</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations research</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Decision making</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Artificial intelligence</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Branch-and-Bound-Methode</subfield><subfield code="0">(DE-588)4146449-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektplanung</subfield><subfield code="0">(DE-588)4115649-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Projektplanung</subfield><subfield code="0">(DE-588)4115649-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Branch-and-Bound-Methode</subfield><subfield code="0">(DE-588)4146449-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783790815160</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783642575075</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-3-642-57506-8</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-SBE</subfield><subfield code="a">ZDB-2-BAE</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">ZDB-2-SBE_Archiv</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-032283006</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-642-57506-8</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-SBE</subfield><subfield code="q">ZDB-2-SBE_Archiv</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV046872874 |
illustrated | Not Illustrated |
index_date | 2024-07-03T15:15:38Z |
indexdate | 2024-07-10T08:56:10Z |
institution | BVB |
isbn | 9783642575068 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-032283006 |
oclc_num | 863666541 |
open_access_boolean | |
owner | DE-634 |
owner_facet | DE-634 |
physical | 1 Online-Ressource (X, 166 p) |
psigel | ZDB-2-SBE ZDB-2-BAE ZDB-2-SBE_Archiv ZDB-2-SBE ZDB-2-SBE_Archiv |
publishDate | 2002 |
publishDateSearch | 2002 |
publishDateSort | 2002 |
publisher | Physica-Verlag HD |
record_format | marc |
series2 | Contributions to Management Science |
spelling | Dorndorf, Ulrich Verfasser aut Project Scheduling with Time Windows From Theory to Applications by Ulrich Dorndorf 1st ed. 2002 Heidelberg Physica-Verlag HD 2002 1 Online-Ressource (X, 166 p) txt rdacontent c rdamedia cr rdacarrier Contributions to Management Science Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning. The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach Organization Operations Research/Decision Theory Artificial Intelligence Planning Operations research Decision making Artificial intelligence Branch-and-Bound-Methode (DE-588)4146449-7 gnd rswk-swf Optimierung (DE-588)4043664-0 gnd rswk-swf Projektplanung (DE-588)4115649-3 gnd rswk-swf (DE-588)4113937-9 Hochschulschrift gnd-content Projektplanung (DE-588)4115649-3 s Optimierung (DE-588)4043664-0 s Branch-and-Bound-Methode (DE-588)4146449-7 s DE-604 Erscheint auch als Druck-Ausgabe 9783790815160 Erscheint auch als Druck-Ausgabe 9783642575075 https://doi.org/10.1007/978-3-642-57506-8 Verlag URL des Erstveröffentlichers Volltext |
spellingShingle | Dorndorf, Ulrich Project Scheduling with Time Windows From Theory to Applications Organization Operations Research/Decision Theory Artificial Intelligence Planning Operations research Decision making Artificial intelligence Branch-and-Bound-Methode (DE-588)4146449-7 gnd Optimierung (DE-588)4043664-0 gnd Projektplanung (DE-588)4115649-3 gnd |
subject_GND | (DE-588)4146449-7 (DE-588)4043664-0 (DE-588)4115649-3 (DE-588)4113937-9 |
title | Project Scheduling with Time Windows From Theory to Applications |
title_auth | Project Scheduling with Time Windows From Theory to Applications |
title_exact_search | Project Scheduling with Time Windows From Theory to Applications |
title_exact_search_txtP | Project Scheduling with Time Windows From Theory to Applications |
title_full | Project Scheduling with Time Windows From Theory to Applications by Ulrich Dorndorf |
title_fullStr | Project Scheduling with Time Windows From Theory to Applications by Ulrich Dorndorf |
title_full_unstemmed | Project Scheduling with Time Windows From Theory to Applications by Ulrich Dorndorf |
title_short | Project Scheduling with Time Windows |
title_sort | project scheduling with time windows from theory to applications |
title_sub | From Theory to Applications |
topic | Organization Operations Research/Decision Theory Artificial Intelligence Planning Operations research Decision making Artificial intelligence Branch-and-Bound-Methode (DE-588)4146449-7 gnd Optimierung (DE-588)4043664-0 gnd Projektplanung (DE-588)4115649-3 gnd |
topic_facet | Organization Operations Research/Decision Theory Artificial Intelligence Planning Operations research Decision making Artificial intelligence Branch-and-Bound-Methode Optimierung Projektplanung Hochschulschrift |
url | https://doi.org/10.1007/978-3-642-57506-8 |
work_keys_str_mv | AT dorndorfulrich projectschedulingwithtimewindowsfromtheorytoapplications |