Make-to-Order Assembly Management:
Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and f...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Berlin, Heidelberg
Springer Berlin Heidelberg
2001
|
Ausgabe: | 1st ed. 2001 |
Schlagworte: | |
Online-Zugang: | BTU01 Volltext |
Zusammenfassung: | Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc |
Beschreibung: | 1 Online-Ressource (XI, 260 p) |
ISBN: | 9783662045145 |
DOI: | 10.1007/978-3-662-04514-5 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV046872839 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 200828s2001 |||| o||u| ||||||eng d | ||
020 | |a 9783662045145 |9 978-3-662-04514-5 | ||
024 | 7 | |a 10.1007/978-3-662-04514-5 |2 doi | |
035 | |a (ZDB-2-SBE)978-3-662-04514-5 | ||
035 | |a (OCoLC)903192341 | ||
035 | |a (DE-599)BVBBV046872839 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-634 | ||
082 | 0 | |a 658.5 |2 23 | |
084 | |a QP 542 |0 (DE-625)141900: |2 rvk | ||
100 | 1 | |a Kolisch, Rainer |e Verfasser |4 aut | |
245 | 1 | 0 | |a Make-to-Order Assembly Management |c by Rainer Kolisch |
250 | |a 1st ed. 2001 | ||
264 | 1 | |a Berlin, Heidelberg |b Springer Berlin Heidelberg |c 2001 | |
300 | |a 1 Online-Ressource (XI, 260 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
520 | |a Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc | ||
650 | 4 | |a Operations Management | |
650 | 4 | |a Industrial and Production Engineering | |
650 | 4 | |a Business Mathematics | |
650 | 4 | |a Production management | |
650 | 4 | |a Industrial engineering | |
650 | 4 | |a Production engineering | |
650 | 4 | |a Business mathematics | |
650 | 0 | 7 | |a Kapazitätsbelegungsplanung |0 (DE-588)4261342-5 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Hierarchische Produktionsplanung |0 (DE-588)4215433-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsplanung |0 (DE-588)4047360-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Koordination |0 (DE-588)4032393-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Auftragsfertigung |0 (DE-588)4003563-3 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a Auftragsfertigung |0 (DE-588)4003563-3 |D s |
689 | 0 | 1 | |a Hierarchische Produktionsplanung |0 (DE-588)4215433-9 |D s |
689 | 0 | 2 | |a Kapazitätsbelegungsplanung |0 (DE-588)4261342-5 |D s |
689 | 0 | 3 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Produktionsplanung |0 (DE-588)4047360-0 |D s |
689 | 1 | 1 | |a Auftragsfertigung |0 (DE-588)4003563-3 |D s |
689 | 1 | 2 | |a Koordination |0 (DE-588)4032393-6 |D s |
689 | 1 | |5 DE-604 | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783642074318 |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783540410980 |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783662045152 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-3-662-04514-5 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-2-SBE |a ZDB-2-BAE | ||
940 | 1 | |q ZDB-2-SBE_Archiv | |
999 | |a oai:aleph.bib-bvb.de:BVB01-032282971 | ||
966 | e | |u https://doi.org/10.1007/978-3-662-04514-5 |l BTU01 |p ZDB-2-SBE |q ZDB-2-SBE_Archiv |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804181722269483008 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Kolisch, Rainer |
author_facet | Kolisch, Rainer |
author_role | aut |
author_sort | Kolisch, Rainer |
author_variant | r k rk |
building | Verbundindex |
bvnumber | BV046872839 |
classification_rvk | QP 542 |
collection | ZDB-2-SBE ZDB-2-BAE |
ctrlnum | (ZDB-2-SBE)978-3-662-04514-5 (OCoLC)903192341 (DE-599)BVBBV046872839 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
doi_str_mv | 10.1007/978-3-662-04514-5 |
edition | 1st ed. 2001 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03869nmm a2200685zc 4500</leader><controlfield tag="001">BV046872839</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">200828s2001 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783662045145</subfield><subfield code="9">978-3-662-04514-5</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-3-662-04514-5</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-2-SBE)978-3-662-04514-5</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)903192341</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV046872839</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">23</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Kolisch, Rainer</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Make-to-Order Assembly Management</subfield><subfield code="c">by Rainer Kolisch</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed. 2001</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin, Heidelberg</subfield><subfield code="b">Springer Berlin Heidelberg</subfield><subfield code="c">2001</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (XI, 260 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial and Production Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Business Mathematics</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Business mathematics</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kapazitätsbelegungsplanung</subfield><subfield code="0">(DE-588)4261342-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Hierarchische Produktionsplanung</subfield><subfield code="0">(DE-588)4215433-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Koordination</subfield><subfield code="0">(DE-588)4032393-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Auftragsfertigung</subfield><subfield code="0">(DE-588)4003563-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Auftragsfertigung</subfield><subfield code="0">(DE-588)4003563-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Hierarchische Produktionsplanung</subfield><subfield code="0">(DE-588)4215433-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Kapazitätsbelegungsplanung</subfield><subfield code="0">(DE-588)4261342-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="3"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Auftragsfertigung</subfield><subfield code="0">(DE-588)4003563-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="2"><subfield code="a">Koordination</subfield><subfield code="0">(DE-588)4032393-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783642074318</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783540410980</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783662045152</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-3-662-04514-5</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-SBE</subfield><subfield code="a">ZDB-2-BAE</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">ZDB-2-SBE_Archiv</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-032282971</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-662-04514-5</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-SBE</subfield><subfield code="q">ZDB-2-SBE_Archiv</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV046872839 |
illustrated | Not Illustrated |
index_date | 2024-07-03T15:15:38Z |
indexdate | 2024-07-10T08:56:10Z |
institution | BVB |
isbn | 9783662045145 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-032282971 |
oclc_num | 903192341 |
open_access_boolean | |
owner | DE-634 |
owner_facet | DE-634 |
physical | 1 Online-Ressource (XI, 260 p) |
psigel | ZDB-2-SBE ZDB-2-BAE ZDB-2-SBE_Archiv ZDB-2-SBE ZDB-2-SBE_Archiv |
publishDate | 2001 |
publishDateSearch | 2001 |
publishDateSort | 2001 |
publisher | Springer Berlin Heidelberg |
record_format | marc |
spelling | Kolisch, Rainer Verfasser aut Make-to-Order Assembly Management by Rainer Kolisch 1st ed. 2001 Berlin, Heidelberg Springer Berlin Heidelberg 2001 1 Online-Ressource (XI, 260 p) txt rdacontent c rdamedia cr rdacarrier Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc Operations Management Industrial and Production Engineering Business Mathematics Production management Industrial engineering Production engineering Business mathematics Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd rswk-swf Hierarchische Produktionsplanung (DE-588)4215433-9 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 gnd rswk-swf Koordination (DE-588)4032393-6 gnd rswk-swf Reihenfolgeproblem (DE-588)4242167-6 gnd rswk-swf Auftragsfertigung (DE-588)4003563-3 gnd rswk-swf (DE-588)4113937-9 Hochschulschrift gnd-content Auftragsfertigung (DE-588)4003563-3 s Hierarchische Produktionsplanung (DE-588)4215433-9 s Kapazitätsbelegungsplanung (DE-588)4261342-5 s Reihenfolgeproblem (DE-588)4242167-6 s DE-604 Produktionsplanung (DE-588)4047360-0 s Koordination (DE-588)4032393-6 s Erscheint auch als Druck-Ausgabe 9783642074318 Erscheint auch als Druck-Ausgabe 9783540410980 Erscheint auch als Druck-Ausgabe 9783662045152 https://doi.org/10.1007/978-3-662-04514-5 Verlag URL des Erstveröffentlichers Volltext |
spellingShingle | Kolisch, Rainer Make-to-Order Assembly Management Operations Management Industrial and Production Engineering Business Mathematics Production management Industrial engineering Production engineering Business mathematics Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd Hierarchische Produktionsplanung (DE-588)4215433-9 gnd Produktionsplanung (DE-588)4047360-0 gnd Koordination (DE-588)4032393-6 gnd Reihenfolgeproblem (DE-588)4242167-6 gnd Auftragsfertigung (DE-588)4003563-3 gnd |
subject_GND | (DE-588)4261342-5 (DE-588)4215433-9 (DE-588)4047360-0 (DE-588)4032393-6 (DE-588)4242167-6 (DE-588)4003563-3 (DE-588)4113937-9 |
title | Make-to-Order Assembly Management |
title_auth | Make-to-Order Assembly Management |
title_exact_search | Make-to-Order Assembly Management |
title_exact_search_txtP | Make-to-Order Assembly Management |
title_full | Make-to-Order Assembly Management by Rainer Kolisch |
title_fullStr | Make-to-Order Assembly Management by Rainer Kolisch |
title_full_unstemmed | Make-to-Order Assembly Management by Rainer Kolisch |
title_short | Make-to-Order Assembly Management |
title_sort | make to order assembly management |
topic | Operations Management Industrial and Production Engineering Business Mathematics Production management Industrial engineering Production engineering Business mathematics Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd Hierarchische Produktionsplanung (DE-588)4215433-9 gnd Produktionsplanung (DE-588)4047360-0 gnd Koordination (DE-588)4032393-6 gnd Reihenfolgeproblem (DE-588)4242167-6 gnd Auftragsfertigung (DE-588)4003563-3 gnd |
topic_facet | Operations Management Industrial and Production Engineering Business Mathematics Production management Industrial engineering Production engineering Business mathematics Kapazitätsbelegungsplanung Hierarchische Produktionsplanung Produktionsplanung Koordination Reihenfolgeproblem Auftragsfertigung Hochschulschrift |
url | https://doi.org/10.1007/978-3-662-04514-5 |
work_keys_str_mv | AT kolischrainer maketoorderassemblymanagement |