An Integrated Approach in Production Planning and Scheduling:
Production Management is a large field concerned with all the aspects related to production, from the very bottom decisions at the machine level, to the top-level strategic decisicns. In this book, we are concerned with production planning and scheduling aspects. Traditional production planning meth...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Berlin, Heidelberg
Springer Berlin Heidelberg
1994
|
Ausgabe: | 1st ed. 1994 |
Schriftenreihe: | Lecture Notes in Economics and Mathematical Systems
411 |
Schlagworte: | |
Online-Zugang: | BTU01 Volltext |
Zusammenfassung: | Production Management is a large field concerned with all the aspects related to production, from the very bottom decisions at the machine level, to the top-level strategic decisicns. In this book, we are concerned with production planning and scheduling aspects. Traditional production planning methodologies are based on a now widely ac cepted hierarchical decom?osition into several planning decision levels. The higher in the hierarchy, the more aggregate are the models and the more important are the decisions. In this book, we only consider the last two decision levels in the hierarchy, namely, the mid-term (or tacticaQ planning level and the short-term (or operationaQ scheduling level. In the literature and in practice, the decisions are taken in sequence and in a top-down approach from the highest level in the hierarchy to the bottom level. The decisions taken at some level in the hierarchy are constrained by those already taken at upper levels and in turn, must translate into feasible objectives for the next lower levels in the hierarchy. It is a common sense remark to say that the whole hierarchical decision process is coherent if the interactions between different levels in the hierarchy are taken into account so that a decision taken at some level in the hierarchy translates into a feasible objective for the next decision level in the hierarchy. However, and surpris ingly enough, this crucial consistency issue is rarely investigated and few results are available in the literature |
Beschreibung: | 1 Online-Ressource (XVI, 137 p) |
ISBN: | 9783642468049 |
DOI: | 10.1007/978-3-642-46804-9 |
Internformat
MARC
LEADER | 00000nmm a2200000zcb4500 | ||
---|---|---|---|
001 | BV046871387 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 200828s1994 |||| o||u| ||||||eng d | ||
020 | |a 9783642468049 |9 978-3-642-46804-9 | ||
024 | 7 | |a 10.1007/978-3-642-46804-9 |2 doi | |
035 | |a (ZDB-2-SBE)978-3-642-46804-9 | ||
035 | |a (OCoLC)863936803 | ||
035 | |a (DE-599)BVBBV046871387 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-634 | ||
082 | 0 | |a 658.5 |2 23 | |
084 | |a QP 500 |0 (DE-625)141894: |2 rvk | ||
084 | |a QP 505 |0 (DE-625)141895: |2 rvk | ||
084 | |a SI 853 |0 (DE-625)143200: |2 rvk | ||
084 | |a SK 970 |0 (DE-625)143276: |2 rvk | ||
100 | 1 | |a Dauzere-Peres, Stephane |e Verfasser |4 aut | |
245 | 1 | 0 | |a An Integrated Approach in Production Planning and Scheduling |c by Stephane Dauzere-Peres, Jean-Bernard Lasserre |
250 | |a 1st ed. 1994 | ||
264 | 1 | |a Berlin, Heidelberg |b Springer Berlin Heidelberg |c 1994 | |
300 | |a 1 Online-Ressource (XVI, 137 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Lecture Notes in Economics and Mathematical Systems |v 411 | |
520 | |a Production Management is a large field concerned with all the aspects related to production, from the very bottom decisions at the machine level, to the top-level strategic decisicns. In this book, we are concerned with production planning and scheduling aspects. Traditional production planning methodologies are based on a now widely ac cepted hierarchical decom?osition into several planning decision levels. The higher in the hierarchy, the more aggregate are the models and the more important are the decisions. In this book, we only consider the last two decision levels in the hierarchy, namely, the mid-term (or tacticaQ planning level and the short-term (or operationaQ scheduling level. In the literature and in practice, the decisions are taken in sequence and in a top-down approach from the highest level in the hierarchy to the bottom level. The decisions taken at some level in the hierarchy are constrained by those already taken at upper levels and in turn, must translate into feasible objectives for the next lower levels in the hierarchy. It is a common sense remark to say that the whole hierarchical decision process is coherent if the interactions between different levels in the hierarchy are taken into account so that a decision taken at some level in the hierarchy translates into a feasible objective for the next decision level in the hierarchy. However, and surpris ingly enough, this crucial consistency issue is rarely investigated and few results are available in the literature | ||
650 | 4 | |a Operations Management | |
650 | 4 | |a Organization | |
650 | 4 | |a Economics, general | |
650 | 4 | |a Production management | |
650 | 4 | |a Organization | |
650 | 4 | |a Planning | |
650 | 4 | |a Economics | |
650 | 4 | |a Management science | |
650 | 0 | 7 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a PPS |0 (DE-588)4115606-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Mathematisches Modell |0 (DE-588)4114528-8 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Kapazitätsbelegung |0 (DE-588)4206218-4 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Kapazitätsbelegungsplanung |0 (DE-588)4261342-5 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsplanung |0 (DE-588)4047360-0 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a PPS |0 (DE-588)4115606-7 |D s |
689 | 0 | 1 | |a Kapazitätsbelegung |0 (DE-588)4206218-4 |D s |
689 | 0 | 2 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a PPS |0 (DE-588)4115606-7 |D s |
689 | 1 | 1 | |a Kapazitätsbelegungsplanung |0 (DE-588)4261342-5 |D s |
689 | 1 | 2 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |D s |
689 | 1 | |5 DE-604 | |
689 | 2 | 0 | |a Produktionsplanung |0 (DE-588)4047360-0 |D s |
689 | 2 | 1 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |D s |
689 | 2 | |5 DE-604 | |
689 | 3 | 0 | |a Mathematisches Modell |0 (DE-588)4114528-8 |D s |
689 | 3 | |5 DE-604 | |
700 | 1 | |a Lasserre, Jean-Bernard |4 aut | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783540579052 |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783642468056 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-3-642-46804-9 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-2-SBE |a ZDB-2-BAE | ||
940 | 1 | |q ZDB-2-SBE_Archiv | |
999 | |a oai:aleph.bib-bvb.de:BVB01-032281518 | ||
966 | e | |u https://doi.org/10.1007/978-3-642-46804-9 |l BTU01 |p ZDB-2-SBE |q ZDB-2-SBE_Archiv |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804181719126900736 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Dauzere-Peres, Stephane Lasserre, Jean-Bernard |
author_facet | Dauzere-Peres, Stephane Lasserre, Jean-Bernard |
author_role | aut aut |
author_sort | Dauzere-Peres, Stephane |
author_variant | s d p sdp j b l jbl |
building | Verbundindex |
bvnumber | BV046871387 |
classification_rvk | QP 500 QP 505 SI 853 SK 970 |
collection | ZDB-2-SBE ZDB-2-BAE |
ctrlnum | (ZDB-2-SBE)978-3-642-46804-9 (OCoLC)863936803 (DE-599)BVBBV046871387 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Mathematik Wirtschaftswissenschaften |
discipline_str_mv | Mathematik Wirtschaftswissenschaften |
doi_str_mv | 10.1007/978-3-642-46804-9 |
edition | 1st ed. 1994 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04474nmm a2200781zcb4500</leader><controlfield tag="001">BV046871387</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">200828s1994 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783642468049</subfield><subfield code="9">978-3-642-46804-9</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-3-642-46804-9</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-2-SBE)978-3-642-46804-9</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)863936803</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV046871387</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">23</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 500</subfield><subfield code="0">(DE-625)141894:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 505</subfield><subfield code="0">(DE-625)141895:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">SI 853</subfield><subfield code="0">(DE-625)143200:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">SK 970</subfield><subfield code="0">(DE-625)143276:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Dauzere-Peres, Stephane</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">An Integrated Approach in Production Planning and Scheduling</subfield><subfield code="c">by Stephane Dauzere-Peres, Jean-Bernard Lasserre</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed. 1994</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin, Heidelberg</subfield><subfield code="b">Springer Berlin Heidelberg</subfield><subfield code="c">1994</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (XVI, 137 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Lecture Notes in Economics and Mathematical Systems</subfield><subfield code="v">411</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Production Management is a large field concerned with all the aspects related to production, from the very bottom decisions at the machine level, to the top-level strategic decisicns. In this book, we are concerned with production planning and scheduling aspects. Traditional production planning methodologies are based on a now widely ac cepted hierarchical decom?osition into several planning decision levels. The higher in the hierarchy, the more aggregate are the models and the more important are the decisions. In this book, we only consider the last two decision levels in the hierarchy, namely, the mid-term (or tacticaQ planning level and the short-term (or operationaQ scheduling level. In the literature and in practice, the decisions are taken in sequence and in a top-down approach from the highest level in the hierarchy to the bottom level. The decisions taken at some level in the hierarchy are constrained by those already taken at upper levels and in turn, must translate into feasible objectives for the next lower levels in the hierarchy. It is a common sense remark to say that the whole hierarchical decision process is coherent if the interactions between different levels in the hierarchy are taken into account so that a decision taken at some level in the hierarchy translates into a feasible objective for the next decision level in the hierarchy. However, and surpris ingly enough, this crucial consistency issue is rarely investigated and few results are available in the literature</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Organization</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Economics, general</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Organization</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Economics</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Management science</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">PPS</subfield><subfield code="0">(DE-588)4115606-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kapazitätsbelegung</subfield><subfield code="0">(DE-588)4206218-4</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kapazitätsbelegungsplanung</subfield><subfield code="0">(DE-588)4261342-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">PPS</subfield><subfield code="0">(DE-588)4115606-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Kapazitätsbelegung</subfield><subfield code="0">(DE-588)4206218-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">PPS</subfield><subfield code="0">(DE-588)4115606-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Kapazitätsbelegungsplanung</subfield><subfield code="0">(DE-588)4261342-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="2"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2="1"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="3" ind2="0"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Lasserre, Jean-Bernard</subfield><subfield code="4">aut</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783540579052</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783642468056</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-3-642-46804-9</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-SBE</subfield><subfield code="a">ZDB-2-BAE</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">ZDB-2-SBE_Archiv</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-032281518</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-642-46804-9</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-SBE</subfield><subfield code="q">ZDB-2-SBE_Archiv</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV046871387 |
illustrated | Not Illustrated |
index_date | 2024-07-03T15:15:35Z |
indexdate | 2024-07-10T08:56:07Z |
institution | BVB |
isbn | 9783642468049 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-032281518 |
oclc_num | 863936803 |
open_access_boolean | |
owner | DE-634 |
owner_facet | DE-634 |
physical | 1 Online-Ressource (XVI, 137 p) |
psigel | ZDB-2-SBE ZDB-2-BAE ZDB-2-SBE_Archiv ZDB-2-SBE ZDB-2-SBE_Archiv |
publishDate | 1994 |
publishDateSearch | 1994 |
publishDateSort | 1994 |
publisher | Springer Berlin Heidelberg |
record_format | marc |
series2 | Lecture Notes in Economics and Mathematical Systems |
spelling | Dauzere-Peres, Stephane Verfasser aut An Integrated Approach in Production Planning and Scheduling by Stephane Dauzere-Peres, Jean-Bernard Lasserre 1st ed. 1994 Berlin, Heidelberg Springer Berlin Heidelberg 1994 1 Online-Ressource (XVI, 137 p) txt rdacontent c rdamedia cr rdacarrier Lecture Notes in Economics and Mathematical Systems 411 Production Management is a large field concerned with all the aspects related to production, from the very bottom decisions at the machine level, to the top-level strategic decisicns. In this book, we are concerned with production planning and scheduling aspects. Traditional production planning methodologies are based on a now widely ac cepted hierarchical decom?osition into several planning decision levels. The higher in the hierarchy, the more aggregate are the models and the more important are the decisions. In this book, we only consider the last two decision levels in the hierarchy, namely, the mid-term (or tacticaQ planning level and the short-term (or operationaQ scheduling level. In the literature and in practice, the decisions are taken in sequence and in a top-down approach from the highest level in the hierarchy to the bottom level. The decisions taken at some level in the hierarchy are constrained by those already taken at upper levels and in turn, must translate into feasible objectives for the next lower levels in the hierarchy. It is a common sense remark to say that the whole hierarchical decision process is coherent if the interactions between different levels in the hierarchy are taken into account so that a decision taken at some level in the hierarchy translates into a feasible objective for the next decision level in the hierarchy. However, and surpris ingly enough, this crucial consistency issue is rarely investigated and few results are available in the literature Operations Management Organization Economics, general Production management Planning Economics Management science Reihenfolgeproblem (DE-588)4242167-6 gnd rswk-swf PPS (DE-588)4115606-7 gnd rswk-swf Mathematisches Modell (DE-588)4114528-8 gnd rswk-swf Kapazitätsbelegung (DE-588)4206218-4 gnd rswk-swf Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 gnd rswk-swf PPS (DE-588)4115606-7 s Kapazitätsbelegung (DE-588)4206218-4 s Reihenfolgeproblem (DE-588)4242167-6 s DE-604 Kapazitätsbelegungsplanung (DE-588)4261342-5 s Produktionsplanung (DE-588)4047360-0 s Mathematisches Modell (DE-588)4114528-8 s Lasserre, Jean-Bernard aut Erscheint auch als Druck-Ausgabe 9783540579052 Erscheint auch als Druck-Ausgabe 9783642468056 https://doi.org/10.1007/978-3-642-46804-9 Verlag URL des Erstveröffentlichers Volltext |
spellingShingle | Dauzere-Peres, Stephane Lasserre, Jean-Bernard An Integrated Approach in Production Planning and Scheduling Operations Management Organization Economics, general Production management Planning Economics Management science Reihenfolgeproblem (DE-588)4242167-6 gnd PPS (DE-588)4115606-7 gnd Mathematisches Modell (DE-588)4114528-8 gnd Kapazitätsbelegung (DE-588)4206218-4 gnd Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd Produktionsplanung (DE-588)4047360-0 gnd |
subject_GND | (DE-588)4242167-6 (DE-588)4115606-7 (DE-588)4114528-8 (DE-588)4206218-4 (DE-588)4261342-5 (DE-588)4047360-0 |
title | An Integrated Approach in Production Planning and Scheduling |
title_auth | An Integrated Approach in Production Planning and Scheduling |
title_exact_search | An Integrated Approach in Production Planning and Scheduling |
title_exact_search_txtP | An Integrated Approach in Production Planning and Scheduling |
title_full | An Integrated Approach in Production Planning and Scheduling by Stephane Dauzere-Peres, Jean-Bernard Lasserre |
title_fullStr | An Integrated Approach in Production Planning and Scheduling by Stephane Dauzere-Peres, Jean-Bernard Lasserre |
title_full_unstemmed | An Integrated Approach in Production Planning and Scheduling by Stephane Dauzere-Peres, Jean-Bernard Lasserre |
title_short | An Integrated Approach in Production Planning and Scheduling |
title_sort | an integrated approach in production planning and scheduling |
topic | Operations Management Organization Economics, general Production management Planning Economics Management science Reihenfolgeproblem (DE-588)4242167-6 gnd PPS (DE-588)4115606-7 gnd Mathematisches Modell (DE-588)4114528-8 gnd Kapazitätsbelegung (DE-588)4206218-4 gnd Kapazitätsbelegungsplanung (DE-588)4261342-5 gnd Produktionsplanung (DE-588)4047360-0 gnd |
topic_facet | Operations Management Organization Economics, general Production management Planning Economics Management science Reihenfolgeproblem PPS Mathematisches Modell Kapazitätsbelegung Kapazitätsbelegungsplanung Produktionsplanung |
url | https://doi.org/10.1007/978-3-642-46804-9 |
work_keys_str_mv | AT dauzereperesstephane anintegratedapproachinproductionplanningandscheduling AT lasserrejeanbernard anintegratedapproachinproductionplanningandscheduling |