Guide to good practice in the management of time in major projects: dynamic time modelling
A practical treatise on the processes and standards required for the effective time management of major construction projects
Gespeichert in:
Format: | Buch |
---|---|
Sprache: | English |
Veröffentlicht: |
Hoboken, NJ
John Wiley & Sons, Inc.
2018
|
Ausgabe: | Second edition |
Schlagworte: | |
Zusammenfassung: | A practical treatise on the processes and standards required for the effective time management of major construction projects This book uses logical step-by-step procedures and examples from inception and risk appraisal--through design and construction to testing and commissioning--to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion Guide to Good Practice in the Management of Time in Major Projects -- Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling |
Beschreibung: | xviii, 227 Seiten Illustrationen, Diagramme 30 cm |
ISBN: | 9781119428398 1119428394 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV045893564 | ||
003 | DE-604 | ||
005 | 20191001 | ||
007 | t | ||
008 | 190522s2018 a||| b||| 00||| eng d | ||
020 | |a 9781119428398 |c pbk |9 978-1-1194-2839-8 | ||
020 | |a 1119428394 |9 1119428394 | ||
035 | |a (OCoLC)1112136342 | ||
035 | |a (DE-599)BVBBV045893564 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-11 | ||
084 | |a QP 360 |0 (DE-625)141869: |2 rvk | ||
245 | 1 | 0 | |a Guide to good practice in the management of time in major projects |b dynamic time modelling |c the Chartered Institute of Building |
250 | |a Second edition | ||
264 | 1 | |a Hoboken, NJ |b John Wiley & Sons, Inc. |c 2018 | |
300 | |a xviii, 227 Seiten |b Illustrationen, Diagramme |c 30 cm | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
505 | 8 | |a Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model | |
520 | 3 | |a A practical treatise on the processes and standards required for the effective time management of major construction projects | |
520 | 3 | |a This book uses logical step-by-step procedures and examples from inception and risk appraisal--through design and construction to testing and commissioning--to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion | |
520 | 3 | |a Guide to Good Practice in the Management of Time in Major Projects -- Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling | |
650 | 0 | 7 | |a Terminplanung |0 (DE-588)4059504-3 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Bauvorhaben |0 (DE-588)4120975-8 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Großprojekt |0 (DE-588)4121387-7 |2 gnd |9 rswk-swf |
653 | 0 | |a Building / Superintendence | |
653 | 0 | |a Production scheduling | |
653 | 0 | |a Building / Superintendence | |
653 | 0 | |a Production scheduling | |
689 | 0 | 0 | |a Bauvorhaben |0 (DE-588)4120975-8 |D s |
689 | 0 | 1 | |a Großprojekt |0 (DE-588)4121387-7 |D s |
689 | 0 | 2 | |a Terminplanung |0 (DE-588)4059504-3 |D s |
689 | 0 | |5 DE-604 | |
710 | 2 | |a Chartered Institution of Building Services Engineers |0 (DE-588)5015200-2 |4 isb | |
776 | 0 | 8 | |i Online version |t Guide to good practice in the management of time in major projects |b Second edition |d Hoboken, NJ, USA : Wiley, 2018 |z 9781119428459 |
999 | |a oai:aleph.bib-bvb.de:BVB01-031276544 |
Datensatz im Suchindex
_version_ | 1804180051882672128 |
---|---|
any_adam_object | |
building | Verbundindex |
bvnumber | BV045893564 |
classification_rvk | QP 360 |
contents | Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model |
ctrlnum | (OCoLC)1112136342 (DE-599)BVBBV045893564 |
discipline | Wirtschaftswissenschaften |
edition | Second edition |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03132nam a2200481 c 4500</leader><controlfield tag="001">BV045893564</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20191001 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">190522s2018 a||| b||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781119428398</subfield><subfield code="c">pbk</subfield><subfield code="9">978-1-1194-2839-8</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1119428394</subfield><subfield code="9">1119428394</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1112136342</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045893564</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-11</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 360</subfield><subfield code="0">(DE-625)141869:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Guide to good practice in the management of time in major projects</subfield><subfield code="b">dynamic time modelling</subfield><subfield code="c">the Chartered Institute of Building</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">Second edition</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Hoboken, NJ</subfield><subfield code="b">John Wiley & Sons, Inc.</subfield><subfield code="c">2018</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">xviii, 227 Seiten</subfield><subfield code="b">Illustrationen, Diagramme</subfield><subfield code="c">30 cm</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">A practical treatise on the processes and standards required for the effective time management of major construction projects</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">This book uses logical step-by-step procedures and examples from inception and risk appraisal--through design and construction to testing and commissioning--to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">Guide to Good Practice in the Management of Time in Major Projects -- Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Terminplanung</subfield><subfield code="0">(DE-588)4059504-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Bauvorhaben</subfield><subfield code="0">(DE-588)4120975-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Großprojekt</subfield><subfield code="0">(DE-588)4121387-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Building / Superintendence</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Building / Superintendence</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Bauvorhaben</subfield><subfield code="0">(DE-588)4120975-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Großprojekt</subfield><subfield code="0">(DE-588)4121387-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Terminplanung</subfield><subfield code="0">(DE-588)4059504-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">Chartered Institution of Building Services Engineers</subfield><subfield code="0">(DE-588)5015200-2</subfield><subfield code="4">isb</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Online version</subfield><subfield code="t">Guide to good practice in the management of time in major projects</subfield><subfield code="b">Second edition</subfield><subfield code="d">Hoboken, NJ, USA : Wiley, 2018</subfield><subfield code="z">9781119428459</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-031276544</subfield></datafield></record></collection> |
id | DE-604.BV045893564 |
illustrated | Illustrated |
indexdate | 2024-07-10T08:29:37Z |
institution | BVB |
institution_GND | (DE-588)5015200-2 |
isbn | 9781119428398 1119428394 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-031276544 |
oclc_num | 1112136342 |
open_access_boolean | |
owner | DE-11 |
owner_facet | DE-11 |
physical | xviii, 227 Seiten Illustrationen, Diagramme 30 cm |
publishDate | 2018 |
publishDateSearch | 2018 |
publishDateSort | 2018 |
publisher | John Wiley & Sons, Inc. |
record_format | marc |
spelling | Guide to good practice in the management of time in major projects dynamic time modelling the Chartered Institute of Building Second edition Hoboken, NJ John Wiley & Sons, Inc. 2018 xviii, 227 Seiten Illustrationen, Diagramme 30 cm txt rdacontent n rdamedia nc rdacarrier Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model A practical treatise on the processes and standards required for the effective time management of major construction projects This book uses logical step-by-step procedures and examples from inception and risk appraisal--through design and construction to testing and commissioning--to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion Guide to Good Practice in the Management of Time in Major Projects -- Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling Terminplanung (DE-588)4059504-3 gnd rswk-swf Bauvorhaben (DE-588)4120975-8 gnd rswk-swf Großprojekt (DE-588)4121387-7 gnd rswk-swf Building / Superintendence Production scheduling Bauvorhaben (DE-588)4120975-8 s Großprojekt (DE-588)4121387-7 s Terminplanung (DE-588)4059504-3 s DE-604 Chartered Institution of Building Services Engineers (DE-588)5015200-2 isb Online version Guide to good practice in the management of time in major projects Second edition Hoboken, NJ, USA : Wiley, 2018 9781119428459 |
spellingShingle | Guide to good practice in the management of time in major projects dynamic time modelling Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model Terminplanung (DE-588)4059504-3 gnd Bauvorhaben (DE-588)4120975-8 gnd Großprojekt (DE-588)4121387-7 gnd |
subject_GND | (DE-588)4059504-3 (DE-588)4120975-8 (DE-588)4121387-7 |
title | Guide to good practice in the management of time in major projects dynamic time modelling |
title_auth | Guide to good practice in the management of time in major projects dynamic time modelling |
title_exact_search | Guide to good practice in the management of time in major projects dynamic time modelling |
title_full | Guide to good practice in the management of time in major projects dynamic time modelling the Chartered Institute of Building |
title_fullStr | Guide to good practice in the management of time in major projects dynamic time modelling the Chartered Institute of Building |
title_full_unstemmed | Guide to good practice in the management of time in major projects dynamic time modelling the Chartered Institute of Building |
title_short | Guide to good practice in the management of time in major projects |
title_sort | guide to good practice in the management of time in major projects dynamic time modelling |
title_sub | dynamic time modelling |
topic | Terminplanung (DE-588)4059504-3 gnd Bauvorhaben (DE-588)4120975-8 gnd Großprojekt (DE-588)4121387-7 gnd |
topic_facet | Terminplanung Bauvorhaben Großprojekt |
work_keys_str_mv | AT charteredinstitutionofbuildingservicesengineers guidetogoodpracticeinthemanagementoftimeinmajorprojectsdynamictimemodelling |