The power of design-build: a guide to effective design-build project delivery using the SAFEDB-methodology
Part I. Introduction to design-build: process definition, design-build project management, and design-build best practices and success strategies -- 1. Design-build: the pathway from vision to reality -- 2. Project management in design-build projects -- 3. Design-build best practices and success str...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
New York, New York (222 East 46th Street, New York, NY 10017)
Business Expert Press
2014
|
Ausgabe: | First edition |
Schriftenreihe: | Project management collection
|
Schlagworte: | |
Online-Zugang: | FHN01 FWS01 FWS02 UBY01 Volltext |
Zusammenfassung: | Part I. Introduction to design-build: process definition, design-build project management, and design-build best practices and success strategies -- 1. Design-build: the pathway from vision to reality -- 2. Project management in design-build projects -- 3. Design-build best practices and success strategies -- Part II. The SAFEDB-methodology: methodology overview and description -- 4. About the SAFEDB-methodology -- 5. The first SAFEDB-methodology component: develop design-build solutions -- 6. The second SAFEDB-methodology component: fast-track design-build activities -- 7. The third SAFEDB-methodology component: control design-build work progress -- Part III. The SAFEDB-methodology: methodology application example and case study -- 8. Application of the SAFEDB-methodology -- 9. A full scale SAFEDB-methodology application example -- References -- Index Design-build is a powerful project delivery approach. Actuating such power, however, requires special skill and know-how, and is indeed a trade secret. This is what this book is all about. It provides the design-build professionals and academics with critical design-build knowledge and know-how, as well as with a practical and academically validated innovative design-build methodology, namely, the SAFEDB-methodology. The SAFEDB-methodology consists of three key components, namely, develop design-build solutions, fast-track design-build activities, and control design-build progress. The first component is concerned with evaluating candidate design-build options and selecting the most effective design-build solution. The second component looks deep into overlapping design and construction activities and introduces an effective overlapping strategy enabling maximum safe schedule compression. The third and last methodology component focuses on enhancing the design-build schedule reliability by taking into account potential schedule branching and inadvertent rework loops in a structured and proactive manner. The book is designed to provide the reader with actionable skills that can be applied in real-world business situations. It presents the SAFEDB-methodology in a clear, practical, and step-by-step manner, providing practical examples for the application of the methodology in real-life projects. It also provides a review of the design-build history, how to shape the design-build team, guidelines to winning the design-build competition, connection to the Project Management Institute's (PMI) Project Management Body of Knowledge Guide (PMBOK Guide) project management model, in addition to cutting-edge design-build best practices and tricks of the trade for various civil engineering applications and project situations |
Beschreibung: | Part of: 2014 digital library Includes bibliographical references (pages 221-222) and index |
Beschreibung: | Online-Ressource (229 pages) |
ISBN: | 9781606497715 9781606497708 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV045875985 | ||
003 | DE-604 | ||
005 | 20240422 | ||
007 | cr|uuu---uuuuu | ||
008 | 190514s2014 |||| o||u| ||||||eng d | ||
020 | |a 9781606497715 |9 978-1-60649-771-5 | ||
020 | |a 9781606497708 |9 978-1-60649-770-8 | ||
035 | |a (ZDB-191-BEX)10940888 | ||
035 | |a (OCoLC)889552366 | ||
035 | |a (DE-599)BVBBV045875985 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-863 |a DE-862 |a DE-92 |a DE-706 | ||
082 | 0 | |a 690.068 |2 23 | |
100 | 1 | |a Hashem, Sherif. |e Verfasser |4 aut | |
245 | 1 | 0 | |a The power of design-build |b a guide to effective design-build project delivery using the SAFEDB-methodology |c Sherif Hashem |
250 | |a First edition | ||
264 | 1 | |a New York, New York (222 East 46th Street, New York, NY 10017) |b Business Expert Press |c 2014 | |
300 | |a Online-Ressource (229 pages) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Project management collection | |
500 | |a Part of: 2014 digital library | ||
500 | |a Includes bibliographical references (pages 221-222) and index | ||
520 | |a Part I. Introduction to design-build: process definition, design-build project management, and design-build best practices and success strategies -- 1. Design-build: the pathway from vision to reality -- 2. Project management in design-build projects -- 3. Design-build best practices and success strategies -- Part II. The SAFEDB-methodology: methodology overview and description -- 4. About the SAFEDB-methodology -- 5. The first SAFEDB-methodology component: develop design-build solutions -- 6. The second SAFEDB-methodology component: fast-track design-build activities -- 7. The third SAFEDB-methodology component: control design-build work progress -- Part III. The SAFEDB-methodology: methodology application example and case study -- 8. Application of the SAFEDB-methodology -- 9. A full scale SAFEDB-methodology application example -- References -- Index | ||
520 | |a Design-build is a powerful project delivery approach. Actuating such power, however, requires special skill and know-how, and is indeed a trade secret. This is what this book is all about. It provides the design-build professionals and academics with critical design-build knowledge and know-how, as well as with a practical and academically validated innovative design-build methodology, namely, the SAFEDB-methodology. The SAFEDB-methodology consists of three key components, namely, develop design-build solutions, fast-track design-build activities, and control design-build progress. The first component is concerned with evaluating candidate design-build options and selecting the most effective design-build solution. The second component looks deep into overlapping design and construction activities and introduces an effective overlapping strategy enabling maximum safe schedule compression. The third and last methodology component focuses on enhancing the design-build schedule reliability by taking into account potential schedule branching and inadvertent rework loops in a structured and proactive manner. The book is designed to provide the reader with actionable skills that can be applied in real-world business situations. It presents the SAFEDB-methodology in a clear, practical, and step-by-step manner, providing practical examples for the application of the methodology in real-life projects. It also provides a review of the design-build history, how to shape the design-build team, guidelines to winning the design-build competition, connection to the Project Management Institute's (PMI) Project Management Body of Knowledge Guide (PMBOK Guide) project management model, in addition to cutting-edge design-build best practices and tricks of the trade for various civil engineering applications and project situations | ||
650 | 4 | |a Construction projects / Management | |
650 | 4 | |a Concurrent engineering | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9781606497708 |
856 | 4 | 0 | |u http://portal.igpublish.com/iglibrary/search/BEPB0000272.html |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-191-BEX | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-031259203 | ||
966 | e | |u https://portal.igpublish.com/iglibrary/search/BEPB0000272.html |l FHN01 |p ZDB-191-BEX |x Verlag |3 Volltext | |
966 | e | |u http://portal.igpublish.com/iglibrary/search/BEPB0000272.html |l FWS01 |p ZDB-191-BEX |x Verlag |3 Volltext | |
966 | e | |u http://portal.igpublish.com/iglibrary/search/BEPB0000272.html |l FWS02 |p ZDB-191-BEX |x Verlag |3 Volltext | |
966 | e | |u http://portal.igpublish.com/iglibrary/search/BEPB0000272.html |l UBY01 |p ZDB-191-BEX |x Verlag |3 Volltext |
Datensatz im Suchindex
DE-BY-FWS_katkey | 724133 |
---|---|
_version_ | 1806188255107874816 |
any_adam_object | |
author | Hashem, Sherif |
author_facet | Hashem, Sherif |
author_role | aut |
author_sort | Hashem, Sherif |
author_variant | s h sh |
building | Verbundindex |
bvnumber | BV045875985 |
collection | ZDB-191-BEX |
ctrlnum | (ZDB-191-BEX)10940888 (OCoLC)889552366 (DE-599)BVBBV045875985 |
dewey-full | 690.068 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 690 - Construction of buildings |
dewey-raw | 690.068 |
dewey-search | 690.068 |
dewey-sort | 3690.068 |
dewey-tens | 690 - Construction of buildings |
discipline | Bauingenieurwesen |
edition | First edition |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04714nmm a2200469zc 4500</leader><controlfield tag="001">BV045875985</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20240422 </controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">190514s2014 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781606497715</subfield><subfield code="9">978-1-60649-771-5</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781606497708</subfield><subfield code="9">978-1-60649-770-8</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-191-BEX)10940888</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)889552366</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045875985</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-863</subfield><subfield code="a">DE-862</subfield><subfield code="a">DE-92</subfield><subfield code="a">DE-706</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">690.068</subfield><subfield code="2">23</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Hashem, Sherif.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">The power of design-build</subfield><subfield code="b">a guide to effective design-build project delivery using the SAFEDB-methodology</subfield><subfield code="c">Sherif Hashem</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">First edition</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">New York, New York (222 East 46th Street, New York, NY 10017)</subfield><subfield code="b">Business Expert Press</subfield><subfield code="c">2014</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">Online-Ressource (229 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Project management collection</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Part of: 2014 digital library</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references (pages 221-222) and index</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Part I. Introduction to design-build: process definition, design-build project management, and design-build best practices and success strategies -- 1. Design-build: the pathway from vision to reality -- 2. Project management in design-build projects -- 3. Design-build best practices and success strategies -- Part II. The SAFEDB-methodology: methodology overview and description -- 4. About the SAFEDB-methodology -- 5. The first SAFEDB-methodology component: develop design-build solutions -- 6. The second SAFEDB-methodology component: fast-track design-build activities -- 7. The third SAFEDB-methodology component: control design-build work progress -- Part III. The SAFEDB-methodology: methodology application example and case study -- 8. Application of the SAFEDB-methodology -- 9. A full scale SAFEDB-methodology application example -- References -- Index</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Design-build is a powerful project delivery approach. Actuating such power, however, requires special skill and know-how, and is indeed a trade secret. This is what this book is all about. It provides the design-build professionals and academics with critical design-build knowledge and know-how, as well as with a practical and academically validated innovative design-build methodology, namely, the SAFEDB-methodology. The SAFEDB-methodology consists of three key components, namely, develop design-build solutions, fast-track design-build activities, and control design-build progress. The first component is concerned with evaluating candidate design-build options and selecting the most effective design-build solution. The second component looks deep into overlapping design and construction activities and introduces an effective overlapping strategy enabling maximum safe schedule compression. The third and last methodology component focuses on enhancing the design-build schedule reliability by taking into account potential schedule branching and inadvertent rework loops in a structured and proactive manner. The book is designed to provide the reader with actionable skills that can be applied in real-world business situations. It presents the SAFEDB-methodology in a clear, practical, and step-by-step manner, providing practical examples for the application of the methodology in real-life projects. It also provides a review of the design-build history, how to shape the design-build team, guidelines to winning the design-build competition, connection to the Project Management Institute's (PMI) Project Management Body of Knowledge Guide (PMBOK Guide) project management model, in addition to cutting-edge design-build best practices and tricks of the trade for various civil engineering applications and project situations</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Construction projects / Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Concurrent engineering</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9781606497708</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://portal.igpublish.com/iglibrary/search/BEPB0000272.html</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-191-BEX</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-031259203</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://portal.igpublish.com/iglibrary/search/BEPB0000272.html</subfield><subfield code="l">FHN01</subfield><subfield code="p">ZDB-191-BEX</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://portal.igpublish.com/iglibrary/search/BEPB0000272.html</subfield><subfield code="l">FWS01</subfield><subfield code="p">ZDB-191-BEX</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://portal.igpublish.com/iglibrary/search/BEPB0000272.html</subfield><subfield code="l">FWS02</subfield><subfield code="p">ZDB-191-BEX</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://portal.igpublish.com/iglibrary/search/BEPB0000272.html</subfield><subfield code="l">UBY01</subfield><subfield code="p">ZDB-191-BEX</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV045875985 |
illustrated | Not Illustrated |
indexdate | 2024-08-01T14:29:09Z |
institution | BVB |
isbn | 9781606497715 9781606497708 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-031259203 |
oclc_num | 889552366 |
open_access_boolean | |
owner | DE-863 DE-BY-FWS DE-862 DE-BY-FWS DE-92 DE-706 |
owner_facet | DE-863 DE-BY-FWS DE-862 DE-BY-FWS DE-92 DE-706 |
physical | Online-Ressource (229 pages) |
psigel | ZDB-191-BEX |
publishDate | 2014 |
publishDateSearch | 2014 |
publishDateSort | 2014 |
publisher | Business Expert Press |
record_format | marc |
series2 | Project management collection |
spellingShingle | Hashem, Sherif The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology Construction projects / Management Concurrent engineering |
title | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology |
title_auth | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology |
title_exact_search | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology |
title_full | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology Sherif Hashem |
title_fullStr | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology Sherif Hashem |
title_full_unstemmed | The power of design-build a guide to effective design-build project delivery using the SAFEDB-methodology Sherif Hashem |
title_short | The power of design-build |
title_sort | the power of design build a guide to effective design build project delivery using the safedb methodology |
title_sub | a guide to effective design-build project delivery using the SAFEDB-methodology |
topic | Construction projects / Management Concurrent engineering |
topic_facet | Construction projects / Management Concurrent engineering |
url | http://portal.igpublish.com/iglibrary/search/BEPB0000272.html |
work_keys_str_mv | AT hashemsherif thepowerofdesignbuildaguidetoeffectivedesignbuildprojectdeliveryusingthesafedbmethodology |