Monument Engineering Ltd: aggregate planning = Case study, operations management
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
[Place of publication not identified]
Kogan Page
[2016]
|
Schriftenreihe: | Kogan Page Case Study Library
|
Schlagworte: | |
Online-Zugang: | FLA01 |
Beschreibung: | Description based on online resource; title from caption (Safari, viewed August 26, 2016). - Date of publication from resource description page |
Beschreibung: | 1 online resource (1 volume) illustrations |
ISBN: | 0749477741 9780749477745 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV045359976 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 181212s2016 |||| o||u| ||||||eng d | ||
020 | |a 0749477741 |9 0-7494-7774-1 | ||
020 | |a 9780749477745 |9 978-0-7494-7774-5 | ||
035 | |a (ZDB-4-EBU)ocn957525977 | ||
035 | |a (OCoLC)957525977 | ||
035 | |a (DE-599)BVBBV045359976 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
082 | 0 | |a 658.56 |2 23 | |
100 | 1 | |a Simpson, Mike |e Verfasser |4 aut | |
245 | 1 | 0 | |a Monument Engineering Ltd |b aggregate planning = Case study, operations management |c Mike Simpson and Andrea Genovese |
246 | 1 | 3 | |a Monument Engineering Limited |
246 | 1 | 3 | |a Case study, operations management |
246 | 1 | 1 | |a Case study, operations management |
264 | 1 | |a [Place of publication not identified] |b Kogan Page |c [2016] | |
300 | |a 1 online resource (1 volume) |b illustrations | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Kogan Page Case Study Library | |
500 | |a Description based on online resource; title from caption (Safari, viewed August 26, 2016). - Date of publication from resource description page | ||
505 | 8 | |a This case study illustrates how to create aggregate plans for the production processes of a company | |
650 | 7 | |a Production control |2 fast | |
650 | 7 | |a BUSINESS & ECONOMICS / Production & Operations Management |2 bisacsh | |
650 | 4 | |a Production control |v Case studies | |
700 | 1 | |a Genovese, Andrea |e Sonstige |4 oth | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |a Simpson, Mike |t Case Study: Monument Engineering Ltd |d London : Kogan Page, 2016 |z 9780749477738 |
912 | |a ZDB-4-EBU | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-030746567 | ||
966 | e | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1335062 |l FLA01 |p ZDB-4-EBU |q FLA_PDA_EBU |x Aggregator |3 Volltext |
Datensatz im Suchindex
_version_ | 1804179192566251520 |
---|---|
any_adam_object | |
author | Simpson, Mike |
author_facet | Simpson, Mike |
author_role | aut |
author_sort | Simpson, Mike |
author_variant | m s ms |
building | Verbundindex |
bvnumber | BV045359976 |
collection | ZDB-4-EBU |
contents | This case study illustrates how to create aggregate plans for the production processes of a company |
ctrlnum | (ZDB-4-EBU)ocn957525977 (OCoLC)957525977 (DE-599)BVBBV045359976 |
dewey-full | 658.56 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.56 |
dewey-search | 658.56 |
dewey-sort | 3658.56 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01926nmm a2200433zc 4500</leader><controlfield tag="001">BV045359976</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">181212s2016 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0749477741</subfield><subfield code="9">0-7494-7774-1</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780749477745</subfield><subfield code="9">978-0-7494-7774-5</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-4-EBU)ocn957525977</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)957525977</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045359976</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.56</subfield><subfield code="2">23</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Simpson, Mike</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Monument Engineering Ltd</subfield><subfield code="b">aggregate planning = Case study, operations management</subfield><subfield code="c">Mike Simpson and Andrea Genovese</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Monument Engineering Limited</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Case study, operations management</subfield></datafield><datafield tag="246" ind1="1" ind2="1"><subfield code="a">Case study, operations management</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">[Place of publication not identified]</subfield><subfield code="b">Kogan Page</subfield><subfield code="c">[2016]</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (1 volume)</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Kogan Page Case Study Library</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Description based on online resource; title from caption (Safari, viewed August 26, 2016). - Date of publication from resource description page</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">This case study illustrates how to create aggregate plans for the production processes of a company</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Production control</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">BUSINESS & ECONOMICS / Production & Operations Management</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield><subfield code="v">Case studies</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Genovese, Andrea</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="a">Simpson, Mike</subfield><subfield code="t">Case Study: Monument Engineering Ltd</subfield><subfield code="d">London : Kogan Page, 2016</subfield><subfield code="z">9780749477738</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBU</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-030746567</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1335062</subfield><subfield code="l">FLA01</subfield><subfield code="p">ZDB-4-EBU</subfield><subfield code="q">FLA_PDA_EBU</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV045359976 |
illustrated | Illustrated |
indexdate | 2024-07-10T08:15:58Z |
institution | BVB |
isbn | 0749477741 9780749477745 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-030746567 |
oclc_num | 957525977 |
open_access_boolean | |
physical | 1 online resource (1 volume) illustrations |
psigel | ZDB-4-EBU ZDB-4-EBU FLA_PDA_EBU |
publishDate | 2016 |
publishDateSearch | 2016 |
publishDateSort | 2016 |
publisher | Kogan Page |
record_format | marc |
series2 | Kogan Page Case Study Library |
spelling | Simpson, Mike Verfasser aut Monument Engineering Ltd aggregate planning = Case study, operations management Mike Simpson and Andrea Genovese Monument Engineering Limited Case study, operations management [Place of publication not identified] Kogan Page [2016] 1 online resource (1 volume) illustrations txt rdacontent c rdamedia cr rdacarrier Kogan Page Case Study Library Description based on online resource; title from caption (Safari, viewed August 26, 2016). - Date of publication from resource description page This case study illustrates how to create aggregate plans for the production processes of a company Production control fast BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production control Case studies Genovese, Andrea Sonstige oth Erscheint auch als Druck-Ausgabe Simpson, Mike Case Study: Monument Engineering Ltd London : Kogan Page, 2016 9780749477738 |
spellingShingle | Simpson, Mike Monument Engineering Ltd aggregate planning = Case study, operations management This case study illustrates how to create aggregate plans for the production processes of a company Production control fast BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production control Case studies |
title | Monument Engineering Ltd aggregate planning = Case study, operations management |
title_alt | Monument Engineering Limited Case study, operations management |
title_auth | Monument Engineering Ltd aggregate planning = Case study, operations management |
title_exact_search | Monument Engineering Ltd aggregate planning = Case study, operations management |
title_full | Monument Engineering Ltd aggregate planning = Case study, operations management Mike Simpson and Andrea Genovese |
title_fullStr | Monument Engineering Ltd aggregate planning = Case study, operations management Mike Simpson and Andrea Genovese |
title_full_unstemmed | Monument Engineering Ltd aggregate planning = Case study, operations management Mike Simpson and Andrea Genovese |
title_short | Monument Engineering Ltd |
title_sort | monument engineering ltd aggregate planning case study operations management |
title_sub | aggregate planning = Case study, operations management |
topic | Production control fast BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production control Case studies |
topic_facet | Production control BUSINESS & ECONOMICS / Production & Operations Management Production control Case studies |
work_keys_str_mv | AT simpsonmike monumentengineeringltdaggregateplanningcasestudyoperationsmanagement AT genoveseandrea monumentengineeringltdaggregateplanningcasestudyoperationsmanagement AT simpsonmike monumentengineeringlimited AT genoveseandrea monumentengineeringlimited AT simpsonmike casestudyoperationsmanagement AT genoveseandrea casestudyoperationsmanagement |