Maximizing machinery uptime:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Amsterdam ; Boston
Elsevier Gulf Professional Pub.
2006
|
Schlagworte: | |
Beschreibung: | Print version record. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 |
Beschreibung: | 1 online resource (x, 661 pages) illustrations |
ISBN: | 9780080454771 0080454771 1280629371 9781280629372 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV045343726 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 181206s2006 |||| o||u| ||||||eng d | ||
020 | |a 9780080454771 |9 978-0-08-045477-1 | ||
020 | |a 0080454771 |9 0-08-045477-1 | ||
020 | |a 1280629371 |9 1-280-62937-1 | ||
020 | |a 9781280629372 |9 978-1-280-62937-2 | ||
035 | |a (ZDB-4-ENC)ocn609936656 | ||
035 | |a (OCoLC)609936656 | ||
035 | |a (DE-599)BVBBV045343726 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
082 | 0 | |a 658.5/14 |2 22 | |
100 | 1 | |a Geitner, Fred K. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Maximizing machinery uptime |c Fred K. Geitner and Heinz P. Bloch |
264 | 1 | |a Amsterdam ; Boston |b Elsevier Gulf Professional Pub. |c 2006 | |
300 | |a 1 online resource (x, 661 pages) |b illustrations | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
500 | |a Print version record. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 | ||
505 | 8 | |a The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. *Provides the tools to drastically improve machinery productivity and performance *Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime *Authoritative reference for maximizing the uptime of process equipment | |
650 | 4 | |a Gestion d'entreprise | |
650 | 4 | |a Machinisme | |
650 | 4 | |a Efficacite organisationnelle | |
650 | 7 | |a TECHNOLOGY & ENGINEERING / Automation |2 bisacsh | |
650 | 7 | |a Industrial management |2 fast | |
650 | 7 | |a Machinery in the workplace |2 fast | |
650 | 7 | |a Organizational effectiveness |2 fast | |
650 | 4 | |a Industrial management |a Machinery in the workplace |a Organizational effectiveness | |
650 | 0 | 7 | |a Optimierung |0 (DE-588)4043664-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Maschine |0 (DE-588)4037786-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Betriebszeit |0 (DE-588)4224504-7 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Maschine |0 (DE-588)4037786-6 |D s |
689 | 0 | 1 | |a Betriebszeit |0 (DE-588)4224504-7 |D s |
689 | 0 | 2 | |a Optimierung |0 (DE-588)4043664-0 |D s |
689 | 0 | |8 1\p |5 DE-604 | |
700 | 1 | |a Bloch, Heinz P. |d 1933- |e Sonstige |4 oth | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |a Geitner, Fred K. |t Maximizing machinery uptime |d Amsterdam ; Boston : Elsevier Gulf Professional Pub., 2006 |
912 | |a ZDB-4-ENC | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-030730430 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804179162715389952 |
---|---|
any_adam_object | |
author | Geitner, Fred K. |
author_facet | Geitner, Fred K. |
author_role | aut |
author_sort | Geitner, Fred K. |
author_variant | f k g fk fkg |
building | Verbundindex |
bvnumber | BV045343726 |
collection | ZDB-4-ENC |
contents | The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. *Provides the tools to drastically improve machinery productivity and performance *Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime *Authoritative reference for maximizing the uptime of process equipment |
ctrlnum | (ZDB-4-ENC)ocn609936656 (OCoLC)609936656 (DE-599)BVBBV045343726 |
dewey-full | 658.5/14 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5/14 |
dewey-search | 658.5/14 |
dewey-sort | 3658.5 214 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03113nmm a2200553zc 4500</leader><controlfield tag="001">BV045343726</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">181206s2006 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780080454771</subfield><subfield code="9">978-0-08-045477-1</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0080454771</subfield><subfield code="9">0-08-045477-1</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1280629371</subfield><subfield code="9">1-280-62937-1</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781280629372</subfield><subfield code="9">978-1-280-62937-2</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-4-ENC)ocn609936656</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)609936656</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045343726</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/14</subfield><subfield code="2">22</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Geitner, Fred K.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Maximizing machinery uptime</subfield><subfield code="c">Fred K. Geitner and Heinz P. Bloch</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Amsterdam ; Boston</subfield><subfield code="b">Elsevier Gulf Professional Pub.</subfield><subfield code="c">2006</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (x, 661 pages)</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Print version record. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. *Provides the tools to drastically improve machinery productivity and performance *Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime *Authoritative reference for maximizing the uptime of process equipment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Gestion d'entreprise</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Machinisme</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Efficacite organisationnelle</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING / Automation</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Industrial management</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Machinery in the workplace</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Organizational effectiveness</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial management</subfield><subfield code="a">Machinery in the workplace</subfield><subfield code="a">Organizational effectiveness</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Maschine</subfield><subfield code="0">(DE-588)4037786-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Betriebszeit</subfield><subfield code="0">(DE-588)4224504-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Maschine</subfield><subfield code="0">(DE-588)4037786-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Betriebszeit</subfield><subfield code="0">(DE-588)4224504-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Bloch, Heinz P.</subfield><subfield code="d">1933-</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="a">Geitner, Fred K.</subfield><subfield code="t">Maximizing machinery uptime</subfield><subfield code="d">Amsterdam ; Boston : Elsevier Gulf Professional Pub., 2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-ENC</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-030730430</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
id | DE-604.BV045343726 |
illustrated | Illustrated |
indexdate | 2024-07-10T08:15:29Z |
institution | BVB |
isbn | 9780080454771 0080454771 1280629371 9781280629372 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-030730430 |
oclc_num | 609936656 |
open_access_boolean | |
physical | 1 online resource (x, 661 pages) illustrations |
psigel | ZDB-4-ENC |
publishDate | 2006 |
publishDateSearch | 2006 |
publishDateSort | 2006 |
publisher | Elsevier Gulf Professional Pub. |
record_format | marc |
spelling | Geitner, Fred K. Verfasser aut Maximizing machinery uptime Fred K. Geitner and Heinz P. Bloch Amsterdam ; Boston Elsevier Gulf Professional Pub. 2006 1 online resource (x, 661 pages) illustrations txt rdacontent c rdamedia cr rdacarrier Print version record. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. *Provides the tools to drastically improve machinery productivity and performance *Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime *Authoritative reference for maximizing the uptime of process equipment Gestion d'entreprise Machinisme Efficacite organisationnelle TECHNOLOGY & ENGINEERING / Automation bisacsh Industrial management fast Machinery in the workplace fast Organizational effectiveness fast Industrial management Machinery in the workplace Organizational effectiveness Optimierung (DE-588)4043664-0 gnd rswk-swf Maschine (DE-588)4037786-6 gnd rswk-swf Betriebszeit (DE-588)4224504-7 gnd rswk-swf Maschine (DE-588)4037786-6 s Betriebszeit (DE-588)4224504-7 s Optimierung (DE-588)4043664-0 s 1\p DE-604 Bloch, Heinz P. 1933- Sonstige oth Erscheint auch als Druck-Ausgabe Geitner, Fred K. Maximizing machinery uptime Amsterdam ; Boston : Elsevier Gulf Professional Pub., 2006 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Geitner, Fred K. Maximizing machinery uptime The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. *Provides the tools to drastically improve machinery productivity and performance *Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime *Authoritative reference for maximizing the uptime of process equipment Gestion d'entreprise Machinisme Efficacite organisationnelle TECHNOLOGY & ENGINEERING / Automation bisacsh Industrial management fast Machinery in the workplace fast Organizational effectiveness fast Industrial management Machinery in the workplace Organizational effectiveness Optimierung (DE-588)4043664-0 gnd Maschine (DE-588)4037786-6 gnd Betriebszeit (DE-588)4224504-7 gnd |
subject_GND | (DE-588)4043664-0 (DE-588)4037786-6 (DE-588)4224504-7 |
title | Maximizing machinery uptime |
title_auth | Maximizing machinery uptime |
title_exact_search | Maximizing machinery uptime |
title_full | Maximizing machinery uptime Fred K. Geitner and Heinz P. Bloch |
title_fullStr | Maximizing machinery uptime Fred K. Geitner and Heinz P. Bloch |
title_full_unstemmed | Maximizing machinery uptime Fred K. Geitner and Heinz P. Bloch |
title_short | Maximizing machinery uptime |
title_sort | maximizing machinery uptime |
topic | Gestion d'entreprise Machinisme Efficacite organisationnelle TECHNOLOGY & ENGINEERING / Automation bisacsh Industrial management fast Machinery in the workplace fast Organizational effectiveness fast Industrial management Machinery in the workplace Organizational effectiveness Optimierung (DE-588)4043664-0 gnd Maschine (DE-588)4037786-6 gnd Betriebszeit (DE-588)4224504-7 gnd |
topic_facet | Gestion d'entreprise Machinisme Efficacite organisationnelle TECHNOLOGY & ENGINEERING / Automation Industrial management Machinery in the workplace Organizational effectiveness Industrial management Machinery in the workplace Organizational effectiveness Optimierung Maschine Betriebszeit |
work_keys_str_mv | AT geitnerfredk maximizingmachineryuptime AT blochheinzp maximizingmachineryuptime |