Photovoltaic Power Generation: Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983
Since 1977 the U.S. National Photovoltaic Program has actively supported the design, construction and operation of a variety of photovoltaic power system applications classed as Intermediate size systems and ranging in size from 15 kW to 1000 kW. To date fourteen systems have been built and generall...
Gespeichert in:
Weitere Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Dordrecht
Springer Netherlands
1984
|
Schriftenreihe: | Solar Energy R&D in the European Community, Series C, Photovoltaic Power Generation
4 |
Schlagworte: | |
Online-Zugang: | BTU01 URL des Erstveröffentlichers |
Zusammenfassung: | Since 1977 the U.S. National Photovoltaic Program has actively supported the design, construction and operation of a variety of photovoltaic power system applications classed as Intermediate size systems and ranging in size from 15 kW to 1000 kW. To date fourteen systems have been built and generally are operating as planned. One lOOkW application project was terminated before the completion of the project due to exhaustion of funds and too ambitious of a project. The fourteen operating systems represented a total installed peak generating capacity of 1,164 kW and have delivered nearly 2,000 MWH of energy. Under the U.S. National Program two additional intermediate size photovoltaic power plants are under construction and are expected to become operational during 1984. These two plants represent a total of 1,300 kW of peak generating capacity and should deliver over 1800 MWH of energy per year. In addition the U.S. Photovoltaic Program has committed most of the funding to support the design, procurement and construction of a 1000 kW photovoltaic plant. This .plant will be constructed and installed during the 1984-1985 period. Current U. S. Program Plans do not anticipate funding any further Intermediate size photovoltaic power plants. In parallel with the government program, the private sector has begun building and installing Intermediate (and larger) size photovoltaic power systems. Over the past 21 months, the private sector has installed four Intermediate size PV systems in the U.S. |
Beschreibung: | 1 Online-Ressource (305 p) |
ISBN: | 9789400963429 |
DOI: | 10.1007/978-94-009-6342-9 |
Internformat
MARC
LEADER | 00000nmm a2200000zcb4500 | ||
---|---|---|---|
001 | BV045185315 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 180912s1984 |||| o||u| ||||||eng d | ||
020 | |a 9789400963429 |9 978-94-009-6342-9 | ||
024 | 7 | |a 10.1007/978-94-009-6342-9 |2 doi | |
035 | |a (ZDB-2-ENG)978-94-009-6342-9 | ||
035 | |a (OCoLC)1053793128 | ||
035 | |a (DE-599)BVBBV045185315 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-634 | ||
082 | 0 | |a 621.042 |2 23 | |
245 | 1 | 0 | |a Photovoltaic Power Generation |b Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 |c edited by W. Palz |
246 | 1 | 3 | |a Proceedings of the EC Contractors' Meeting held in Hamburg/Pellworm, July 12-13, 1983 |
264 | 1 | |a Dordrecht |b Springer Netherlands |c 1984 | |
300 | |a 1 Online-Ressource (305 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Solar Energy R&D in the European Community, Series C, Photovoltaic Power Generation |v 4 | |
520 | |a Since 1977 the U.S. National Photovoltaic Program has actively supported the design, construction and operation of a variety of photovoltaic power system applications classed as Intermediate size systems and ranging in size from 15 kW to 1000 kW. To date fourteen systems have been built and generally are operating as planned. One lOOkW application project was terminated before the completion of the project due to exhaustion of funds and too ambitious of a project. The fourteen operating systems represented a total installed peak generating capacity of 1,164 kW and have delivered nearly 2,000 MWH of energy. Under the U.S. National Program two additional intermediate size photovoltaic power plants are under construction and are expected to become operational during 1984. These two plants represent a total of 1,300 kW of peak generating capacity and should deliver over 1800 MWH of energy per year. In addition the U.S. Photovoltaic Program has committed most of the funding to support the design, procurement and construction of a 1000 kW photovoltaic plant. This .plant will be constructed and installed during the 1984-1985 period. Current U. S. Program Plans do not anticipate funding any further Intermediate size photovoltaic power plants. In parallel with the government program, the private sector has begun building and installing Intermediate (and larger) size photovoltaic power systems. Over the past 21 months, the private sector has installed four Intermediate size PV systems in the U.S. | ||
650 | 4 | |a Engineering | |
650 | 4 | |a Renewable and Green Energy | |
650 | 4 | |a Engineering | |
650 | 4 | |a Renewable energy resources | |
650 | 4 | |a Renewable energy sources | |
650 | 4 | |a Alternate energy sources | |
650 | 4 | |a Green energy industries | |
700 | 1 | |a Palz, W. |4 edt | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9789400963443 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-94-009-6342-9 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-2-ENG | ||
940 | 1 | |q ZDB-2-ENG_Archiv | |
999 | |a oai:aleph.bib-bvb.de:BVB01-030574492 | ||
966 | e | |u https://doi.org/10.1007/978-94-009-6342-9 |l BTU01 |p ZDB-2-ENG |q ZDB-2-ENG_Archiv |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804178875067924480 |
---|---|
any_adam_object | |
author2 | Palz, W. |
author2_role | edt |
author2_variant | w p wp |
author_facet | Palz, W. |
building | Verbundindex |
bvnumber | BV045185315 |
collection | ZDB-2-ENG |
ctrlnum | (ZDB-2-ENG)978-94-009-6342-9 (OCoLC)1053793128 (DE-599)BVBBV045185315 |
dewey-full | 621.042 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 621 - Applied physics |
dewey-raw | 621.042 |
dewey-search | 621.042 |
dewey-sort | 3621.042 |
dewey-tens | 620 - Engineering and allied operations |
discipline | Energietechnik |
doi_str_mv | 10.1007/978-94-009-6342-9 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03263nmm a2200469zcb4500</leader><controlfield tag="001">BV045185315</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">180912s1984 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9789400963429</subfield><subfield code="9">978-94-009-6342-9</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-94-009-6342-9</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-2-ENG)978-94-009-6342-9</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1053793128</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045185315</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">621.042</subfield><subfield code="2">23</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Photovoltaic Power Generation</subfield><subfield code="b">Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983</subfield><subfield code="c">edited by W. Palz</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Proceedings of the EC Contractors' Meeting held in Hamburg/Pellworm, July 12-13, 1983</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Dordrecht</subfield><subfield code="b">Springer Netherlands</subfield><subfield code="c">1984</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (305 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Solar Energy R&D in the European Community, Series C, Photovoltaic Power Generation</subfield><subfield code="v">4</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Since 1977 the U.S. National Photovoltaic Program has actively supported the design, construction and operation of a variety of photovoltaic power system applications classed as Intermediate size systems and ranging in size from 15 kW to 1000 kW. To date fourteen systems have been built and generally are operating as planned. One lOOkW application project was terminated before the completion of the project due to exhaustion of funds and too ambitious of a project. The fourteen operating systems represented a total installed peak generating capacity of 1,164 kW and have delivered nearly 2,000 MWH of energy. Under the U.S. National Program two additional intermediate size photovoltaic power plants are under construction and are expected to become operational during 1984. These two plants represent a total of 1,300 kW of peak generating capacity and should deliver over 1800 MWH of energy per year. In addition the U.S. Photovoltaic Program has committed most of the funding to support the design, procurement and construction of a 1000 kW photovoltaic plant. This .plant will be constructed and installed during the 1984-1985 period. Current U. S. Program Plans do not anticipate funding any further Intermediate size photovoltaic power plants. In parallel with the government program, the private sector has begun building and installing Intermediate (and larger) size photovoltaic power systems. Over the past 21 months, the private sector has installed four Intermediate size PV systems in the U.S.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Renewable and Green Energy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Renewable energy resources</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Renewable energy sources</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Alternate energy sources</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Green energy industries</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Palz, W.</subfield><subfield code="4">edt</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9789400963443</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-94-009-6342-9</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-ENG</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">ZDB-2-ENG_Archiv</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-030574492</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-94-009-6342-9</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-ENG</subfield><subfield code="q">ZDB-2-ENG_Archiv</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV045185315 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T08:10:55Z |
institution | BVB |
isbn | 9789400963429 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-030574492 |
oclc_num | 1053793128 |
open_access_boolean | |
owner | DE-634 |
owner_facet | DE-634 |
physical | 1 Online-Ressource (305 p) |
psigel | ZDB-2-ENG ZDB-2-ENG_Archiv ZDB-2-ENG ZDB-2-ENG_Archiv |
publishDate | 1984 |
publishDateSearch | 1984 |
publishDateSort | 1984 |
publisher | Springer Netherlands |
record_format | marc |
series2 | Solar Energy R&D in the European Community, Series C, Photovoltaic Power Generation |
spelling | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 edited by W. Palz Proceedings of the EC Contractors' Meeting held in Hamburg/Pellworm, July 12-13, 1983 Dordrecht Springer Netherlands 1984 1 Online-Ressource (305 p) txt rdacontent c rdamedia cr rdacarrier Solar Energy R&D in the European Community, Series C, Photovoltaic Power Generation 4 Since 1977 the U.S. National Photovoltaic Program has actively supported the design, construction and operation of a variety of photovoltaic power system applications classed as Intermediate size systems and ranging in size from 15 kW to 1000 kW. To date fourteen systems have been built and generally are operating as planned. One lOOkW application project was terminated before the completion of the project due to exhaustion of funds and too ambitious of a project. The fourteen operating systems represented a total installed peak generating capacity of 1,164 kW and have delivered nearly 2,000 MWH of energy. Under the U.S. National Program two additional intermediate size photovoltaic power plants are under construction and are expected to become operational during 1984. These two plants represent a total of 1,300 kW of peak generating capacity and should deliver over 1800 MWH of energy per year. In addition the U.S. Photovoltaic Program has committed most of the funding to support the design, procurement and construction of a 1000 kW photovoltaic plant. This .plant will be constructed and installed during the 1984-1985 period. Current U. S. Program Plans do not anticipate funding any further Intermediate size photovoltaic power plants. In parallel with the government program, the private sector has begun building and installing Intermediate (and larger) size photovoltaic power systems. Over the past 21 months, the private sector has installed four Intermediate size PV systems in the U.S. Engineering Renewable and Green Energy Renewable energy resources Renewable energy sources Alternate energy sources Green energy industries Palz, W. edt Erscheint auch als Druck-Ausgabe 9789400963443 https://doi.org/10.1007/978-94-009-6342-9 Verlag URL des Erstveröffentlichers Volltext |
spellingShingle | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 Engineering Renewable and Green Energy Renewable energy resources Renewable energy sources Alternate energy sources Green energy industries |
title | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 |
title_alt | Proceedings of the EC Contractors' Meeting held in Hamburg/Pellworm, July 12-13, 1983 |
title_auth | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 |
title_exact_search | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 |
title_full | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 edited by W. Palz |
title_fullStr | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 edited by W. Palz |
title_full_unstemmed | Photovoltaic Power Generation Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 edited by W. Palz |
title_short | Photovoltaic Power Generation |
title_sort | photovoltaic power generation proceedings of the ec contractors meeting held in hamburg pellworm 12 13 july 1983 |
title_sub | Proceedings of the EC Contractors’ Meeting held in Hamburg/Pellworm, 12–13 July 1983 |
topic | Engineering Renewable and Green Energy Renewable energy resources Renewable energy sources Alternate energy sources Green energy industries |
topic_facet | Engineering Renewable and Green Energy Renewable energy resources Renewable energy sources Alternate energy sources Green energy industries |
url | https://doi.org/10.1007/978-94-009-6342-9 |
work_keys_str_mv | AT palzw photovoltaicpowergenerationproceedingsoftheeccontractorsmeetingheldinhamburgpellworm1213july1983 AT palzw proceedingsoftheeccontractorsmeetingheldinhamburgpellwormjuly12131983 |