Lotsizing and Scheduling for Production Planning:
Billions of dollars are tied up in the inventories of manufacturing companies which cause large (interest) costs. A small decrease of the inventory and/or production costs without reduction of the service level can increase the profit substantially. Especially in the case of scarce capacity, efficie...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Berlin, Heidelberg
Springer Berlin Heidelberg
1994
|
Schriftenreihe: | Lecture Notes in Economics and Mathematical Systems
408 |
Schlagworte: | |
Online-Zugang: | BTU01 Volltext |
Zusammenfassung: | Billions of dollars are tied up in the inventories of manufacturing companies which cause large (interest) costs. A small decrease of the inventory and/or production costs without reduction of the service level can increase the profit substantially. Especially in the case of scarce capacity, efficient production schedules are fundamental for short delivery time and on-time delivery which are important competitive priorities. To support decision makers by improving their manufacturing resource planning system with appropriate methods is one of the most of production planning. interesting challenges The following chapters contain new models and new solution strategies which may be helpful for decision makers and for further research in the areas of production planning and operations research. The main subject is on lotsizing and scheduling. The objectives and further characteristics of such problems can be inferred from practical need. Thus, before an outline is given, we consider the general objectives of lotsizing and scheduling and classify the most important characteristics of such problems in the following sections |
Beschreibung: | 1 Online-Ressource (VIII, 118 p) |
ISBN: | 9783642457357 |
DOI: | 10.1007/978-3-642-45735-7 |
Internformat
MARC
LEADER | 00000nmm a2200000zcb4500 | ||
---|---|---|---|
001 | BV045185204 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 180912s1994 |||| o||u| ||||||eng d | ||
020 | |a 9783642457357 |9 978-3-642-45735-7 | ||
024 | 7 | |a 10.1007/978-3-642-45735-7 |2 doi | |
035 | |a (ZDB-2-ENG)978-3-642-45735-7 | ||
035 | |a (OCoLC)1185223892 | ||
035 | |a (DE-599)BVBBV045185204 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-634 | ||
082 | 0 | |a 670 |2 23 | |
084 | |a QP 542 |0 (DE-625)141900: |2 rvk | ||
084 | |a SI 853 |0 (DE-625)143200: |2 rvk | ||
084 | |a SK 970 |0 (DE-625)143276: |2 rvk | ||
100 | 1 | |a Haase, Knut |e Verfasser |4 aut | |
245 | 1 | 0 | |a Lotsizing and Scheduling for Production Planning |c by Knut Haase |
264 | 1 | |a Berlin, Heidelberg |b Springer Berlin Heidelberg |c 1994 | |
300 | |a 1 Online-Ressource (VIII, 118 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Lecture Notes in Economics and Mathematical Systems |v 408 | |
520 | |a Billions of dollars are tied up in the inventories of manufacturing companies which cause large (interest) costs. A small decrease of the inventory and/or production costs without reduction of the service level can increase the profit substantially. Especially in the case of scarce capacity, efficient production schedules are fundamental for short delivery time and on-time delivery which are important competitive priorities. To support decision makers by improving their manufacturing resource planning system with appropriate methods is one of the most of production planning. interesting challenges The following chapters contain new models and new solution strategies which may be helpful for decision makers and for further research in the areas of production planning and operations research. The main subject is on lotsizing and scheduling. The objectives and further characteristics of such problems can be inferred from practical need. Thus, before an outline is given, we consider the general objectives of lotsizing and scheduling and classify the most important characteristics of such problems in the following sections | ||
650 | 4 | |a Engineering | |
650 | 4 | |a Industrial and Production Engineering | |
650 | 4 | |a Operations Management | |
650 | 4 | |a Operation Research/Decision Theory | |
650 | 4 | |a Engineering | |
650 | 4 | |a Production management | |
650 | 4 | |a Operations research | |
650 | 4 | |a Decision making | |
650 | 4 | |a Industrial engineering | |
650 | 4 | |a Production engineering | |
650 | 0 | 7 | |a Modell |0 (DE-588)4039798-1 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Losgrößenmodell |0 (DE-588)4261231-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsplanung |0 (DE-588)4047360-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Mathematisches Modell |0 (DE-588)4114528-8 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Operations Research |0 (DE-588)4043586-6 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Produktionsplanung |0 (DE-588)4047360-0 |D s |
689 | 0 | 1 | |a Operations Research |0 (DE-588)4043586-6 |D s |
689 | 0 | 2 | |a Modell |0 (DE-588)4039798-1 |D s |
689 | 0 | |8 1\p |5 DE-604 | |
689 | 1 | 0 | |a Losgrößenmodell |0 (DE-588)4261231-7 |D s |
689 | 1 | 1 | |a Reihenfolgeproblem |0 (DE-588)4242167-6 |D s |
689 | 1 | |8 2\p |5 DE-604 | |
689 | 2 | 0 | |a Mathematisches Modell |0 (DE-588)4114528-8 |D s |
689 | 2 | |8 3\p |5 DE-604 | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe |z 9783540578338 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-3-642-45735-7 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-2-ENG | ||
940 | 1 | |q ZDB-2-ENG_Archiv | |
999 | |a oai:aleph.bib-bvb.de:BVB01-030574382 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
883 | 1 | |8 2\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
883 | 1 | |8 3\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
966 | e | |u https://doi.org/10.1007/978-3-642-45735-7 |l BTU01 |p ZDB-2-ENG |q ZDB-2-ENG_Archiv |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804178874807877632 |
---|---|
any_adam_object | |
author | Haase, Knut |
author_facet | Haase, Knut |
author_role | aut |
author_sort | Haase, Knut |
author_variant | k h kh |
building | Verbundindex |
bvnumber | BV045185204 |
classification_rvk | QP 542 SI 853 SK 970 |
collection | ZDB-2-ENG |
ctrlnum | (ZDB-2-ENG)978-3-642-45735-7 (OCoLC)1185223892 (DE-599)BVBBV045185204 |
dewey-full | 670 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 670 - Manufacturing |
dewey-raw | 670 |
dewey-search | 670 |
dewey-sort | 3670 |
dewey-tens | 670 - Manufacturing |
discipline | Mathematik Werkstoffwissenschaften / Fertigungstechnik Wirtschaftswissenschaften |
doi_str_mv | 10.1007/978-3-642-45735-7 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04045nmm a2200745zcb4500</leader><controlfield tag="001">BV045185204</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">180912s1994 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783642457357</subfield><subfield code="9">978-3-642-45735-7</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-3-642-45735-7</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-2-ENG)978-3-642-45735-7</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1185223892</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV045185204</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">670</subfield><subfield code="2">23</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">SI 853</subfield><subfield code="0">(DE-625)143200:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">SK 970</subfield><subfield code="0">(DE-625)143276:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Haase, Knut</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Lotsizing and Scheduling for Production Planning</subfield><subfield code="c">by Knut Haase</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin, Heidelberg</subfield><subfield code="b">Springer Berlin Heidelberg</subfield><subfield code="c">1994</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (VIII, 118 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Lecture Notes in Economics and Mathematical Systems</subfield><subfield code="v">408</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Billions of dollars are tied up in the inventories of manufacturing companies which cause large (interest) costs. A small decrease of the inventory and/or production costs without reduction of the service level can increase the profit substantially. Especially in the case of scarce capacity, efficient production schedules are fundamental for short delivery time and on-time delivery which are important competitive priorities. To support decision makers by improving their manufacturing resource planning system with appropriate methods is one of the most of production planning. interesting challenges The following chapters contain new models and new solution strategies which may be helpful for decision makers and for further research in the areas of production planning and operations research. The main subject is on lotsizing and scheduling. The objectives and further characteristics of such problems can be inferred from practical need. Thus, before an outline is given, we consider the general objectives of lotsizing and scheduling and classify the most important characteristics of such problems in the following sections</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial and Production Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operation Research/Decision Theory</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Operations research</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Decision making</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production engineering</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Modell</subfield><subfield code="0">(DE-588)4039798-1</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Losgrößenmodell</subfield><subfield code="0">(DE-588)4261231-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Operations Research</subfield><subfield code="0">(DE-588)4043586-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Operations Research</subfield><subfield code="0">(DE-588)4043586-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Modell</subfield><subfield code="0">(DE-588)4039798-1</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Losgrößenmodell</subfield><subfield code="0">(DE-588)4261231-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Reihenfolgeproblem</subfield><subfield code="0">(DE-588)4242167-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="8">2\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="8">3\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe</subfield><subfield code="z">9783540578338</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-3-642-45735-7</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-ENG</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">ZDB-2-ENG_Archiv</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-030574382</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">2\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">3\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-642-45735-7</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-ENG</subfield><subfield code="q">ZDB-2-ENG_Archiv</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV045185204 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T08:10:55Z |
institution | BVB |
isbn | 9783642457357 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-030574382 |
oclc_num | 1185223892 |
open_access_boolean | |
owner | DE-634 |
owner_facet | DE-634 |
physical | 1 Online-Ressource (VIII, 118 p) |
psigel | ZDB-2-ENG ZDB-2-ENG_Archiv ZDB-2-ENG ZDB-2-ENG_Archiv |
publishDate | 1994 |
publishDateSearch | 1994 |
publishDateSort | 1994 |
publisher | Springer Berlin Heidelberg |
record_format | marc |
series2 | Lecture Notes in Economics and Mathematical Systems |
spelling | Haase, Knut Verfasser aut Lotsizing and Scheduling for Production Planning by Knut Haase Berlin, Heidelberg Springer Berlin Heidelberg 1994 1 Online-Ressource (VIII, 118 p) txt rdacontent c rdamedia cr rdacarrier Lecture Notes in Economics and Mathematical Systems 408 Billions of dollars are tied up in the inventories of manufacturing companies which cause large (interest) costs. A small decrease of the inventory and/or production costs without reduction of the service level can increase the profit substantially. Especially in the case of scarce capacity, efficient production schedules are fundamental for short delivery time and on-time delivery which are important competitive priorities. To support decision makers by improving their manufacturing resource planning system with appropriate methods is one of the most of production planning. interesting challenges The following chapters contain new models and new solution strategies which may be helpful for decision makers and for further research in the areas of production planning and operations research. The main subject is on lotsizing and scheduling. The objectives and further characteristics of such problems can be inferred from practical need. Thus, before an outline is given, we consider the general objectives of lotsizing and scheduling and classify the most important characteristics of such problems in the following sections Engineering Industrial and Production Engineering Operations Management Operation Research/Decision Theory Production management Operations research Decision making Industrial engineering Production engineering Modell (DE-588)4039798-1 gnd rswk-swf Losgrößenmodell (DE-588)4261231-7 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 gnd rswk-swf Mathematisches Modell (DE-588)4114528-8 gnd rswk-swf Operations Research (DE-588)4043586-6 gnd rswk-swf Reihenfolgeproblem (DE-588)4242167-6 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 s Operations Research (DE-588)4043586-6 s Modell (DE-588)4039798-1 s 1\p DE-604 Losgrößenmodell (DE-588)4261231-7 s Reihenfolgeproblem (DE-588)4242167-6 s 2\p DE-604 Mathematisches Modell (DE-588)4114528-8 s 3\p DE-604 Erscheint auch als Druck-Ausgabe 9783540578338 https://doi.org/10.1007/978-3-642-45735-7 Verlag URL des Erstveröffentlichers Volltext 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk 2\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk 3\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Haase, Knut Lotsizing and Scheduling for Production Planning Engineering Industrial and Production Engineering Operations Management Operation Research/Decision Theory Production management Operations research Decision making Industrial engineering Production engineering Modell (DE-588)4039798-1 gnd Losgrößenmodell (DE-588)4261231-7 gnd Produktionsplanung (DE-588)4047360-0 gnd Mathematisches Modell (DE-588)4114528-8 gnd Operations Research (DE-588)4043586-6 gnd Reihenfolgeproblem (DE-588)4242167-6 gnd |
subject_GND | (DE-588)4039798-1 (DE-588)4261231-7 (DE-588)4047360-0 (DE-588)4114528-8 (DE-588)4043586-6 (DE-588)4242167-6 |
title | Lotsizing and Scheduling for Production Planning |
title_auth | Lotsizing and Scheduling for Production Planning |
title_exact_search | Lotsizing and Scheduling for Production Planning |
title_full | Lotsizing and Scheduling for Production Planning by Knut Haase |
title_fullStr | Lotsizing and Scheduling for Production Planning by Knut Haase |
title_full_unstemmed | Lotsizing and Scheduling for Production Planning by Knut Haase |
title_short | Lotsizing and Scheduling for Production Planning |
title_sort | lotsizing and scheduling for production planning |
topic | Engineering Industrial and Production Engineering Operations Management Operation Research/Decision Theory Production management Operations research Decision making Industrial engineering Production engineering Modell (DE-588)4039798-1 gnd Losgrößenmodell (DE-588)4261231-7 gnd Produktionsplanung (DE-588)4047360-0 gnd Mathematisches Modell (DE-588)4114528-8 gnd Operations Research (DE-588)4043586-6 gnd Reihenfolgeproblem (DE-588)4242167-6 gnd |
topic_facet | Engineering Industrial and Production Engineering Operations Management Operation Research/Decision Theory Production management Operations research Decision making Industrial engineering Production engineering Modell Losgrößenmodell Produktionsplanung Mathematisches Modell Operations Research Reihenfolgeproblem |
url | https://doi.org/10.1007/978-3-642-45735-7 |
work_keys_str_mv | AT haaseknut lotsizingandschedulingforproductionplanning |