Resource-constrained project scheduling: models, algorithms, extensions and applications
Gespeichert in:
Format: | Elektronisch E-Book |
---|---|
Sprache: | English |
Veröffentlicht: |
London
ISTE
2008
|
Schriftenreihe: | Control systems, robotics and manufacturing series
|
Schlagworte: | |
Online-Zugang: | FRO01 UBG01 Volltext |
Beschreibung: | Includes bibliographical references (pages 279-301) and index This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures |
Beschreibung: | 1 Online-Ressource (308 pages) |
ISBN: | 9780470393840 047039384X 9780470611227 0470611227 1848210345 9781848210349 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV043390986 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 160222s2008 |||| o||u| ||||||eng d | ||
020 | |a 9780470393840 |c electronic bk. |9 978-0-470-39384-0 | ||
020 | |a 047039384X |c electronic bk. |9 0-470-39384-X | ||
020 | |a 9780470611227 |9 978-0-470-61122-7 | ||
020 | |a 0470611227 |9 0-470-61122-7 | ||
020 | |a 1848210345 |9 1-84821-034-5 | ||
020 | |a 9781848210349 |9 978-1-84821-034-9 | ||
020 | |a 9781848210349 |9 978-1-84821-034-9 | ||
024 | 7 | |a 10.1002/9780470611227 |2 doi | |
035 | |a (ZDB-35-WIC)ocn593295616 | ||
035 | |a (OCoLC)593295616 | ||
035 | |a (DE-599)BVBBV043390986 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-861 | ||
082 | 0 | |a 658.5/3 |2 22 | |
245 | 1 | 0 | |a Resource-constrained project scheduling |b models, algorithms, extensions and applications |c edited by Christian Artigues, Sophie Demassey, Emmanuel Néron |
264 | 1 | |a London |b ISTE |c 2008 | |
300 | |a 1 Online-Ressource (308 pages) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Control systems, robotics and manufacturing series | |
500 | |a Includes bibliographical references (pages 279-301) and index | ||
500 | |a This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures | ||
650 | 7 | |a TECHNOLOGY & ENGINEERING / Industrial Technology |2 bisacsh | |
650 | 7 | |a TECHNOLOGY & ENGINEERING / Industrial Engineering |2 bisacsh | |
650 | 7 | |a BUSINESS & ECONOMICS / Production & Operations Management |2 bisacsh | |
650 | 7 | |a Production scheduling |2 fast | |
650 | 4 | |a Wirtschaft | |
650 | 4 | |a Production scheduling | |
650 | 0 | 7 | |a Projektmanagement |0 (DE-588)4047441-0 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Projektmanagement |0 (DE-588)4047441-0 |D s |
689 | 0 | |8 1\p |5 DE-604 | |
700 | 1 | |a Artigues, Christian |e Sonstige |4 oth | |
700 | 1 | |a Demassey, Sophie |e Sonstige |4 oth | |
700 | 1 | |a Neron, Emmanuel |e Sonstige |4 oth | |
856 | 4 | 0 | |u https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227 |x Verlag |z URL des Erstveröffentlichers |3 Volltext |
912 | |a ZDB-35-WIC | ||
940 | 1 | |q UBG_PDA_WIC | |
999 | |a oai:aleph.bib-bvb.de:BVB01-028809570 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
966 | e | |u https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227 |l FRO01 |p ZDB-35-WIC |q FRO_PDA_WIC |x Verlag |3 Volltext | |
966 | e | |u https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227 |l UBG01 |p ZDB-35-WIC |q UBG_PDA_WIC |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804175965736140800 |
---|---|
any_adam_object | |
building | Verbundindex |
bvnumber | BV043390986 |
collection | ZDB-35-WIC |
ctrlnum | (ZDB-35-WIC)ocn593295616 (OCoLC)593295616 (DE-599)BVBBV043390986 |
dewey-full | 658.5/3 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5/3 |
dewey-search | 658.5/3 |
dewey-sort | 3658.5 13 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03897nmm a2200601zc 4500</leader><controlfield tag="001">BV043390986</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">160222s2008 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780470393840</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">978-0-470-39384-0</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">047039384X</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">0-470-39384-X</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780470611227</subfield><subfield code="9">978-0-470-61122-7</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0470611227</subfield><subfield code="9">0-470-61122-7</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1848210345</subfield><subfield code="9">1-84821-034-5</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781848210349</subfield><subfield code="9">978-1-84821-034-9</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781848210349</subfield><subfield code="9">978-1-84821-034-9</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1002/9780470611227</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-35-WIC)ocn593295616</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)593295616</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV043390986</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-861</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/3</subfield><subfield code="2">22</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Resource-constrained project scheduling</subfield><subfield code="b">models, algorithms, extensions and applications</subfield><subfield code="c">edited by Christian Artigues, Sophie Demassey, Emmanuel Néron</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">London</subfield><subfield code="b">ISTE</subfield><subfield code="c">2008</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (308 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Control systems, robotics and manufacturing series</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references (pages 279-301) and index</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING / Industrial Technology</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING / Industrial Engineering</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">BUSINESS & ECONOMICS / Production & Operations Management</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Production scheduling</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Wirtschaft</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Artigues, Christian</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Demassey, Sophie</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Neron, Emmanuel</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227</subfield><subfield code="x">Verlag</subfield><subfield code="z">URL des Erstveröffentlichers</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-35-WIC</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">UBG_PDA_WIC</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-028809570</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227</subfield><subfield code="l">FRO01</subfield><subfield code="p">ZDB-35-WIC</subfield><subfield code="q">FRO_PDA_WIC</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227</subfield><subfield code="l">UBG01</subfield><subfield code="p">ZDB-35-WIC</subfield><subfield code="q">UBG_PDA_WIC</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV043390986 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T07:24:40Z |
institution | BVB |
isbn | 9780470393840 047039384X 9780470611227 0470611227 1848210345 9781848210349 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-028809570 |
oclc_num | 593295616 |
open_access_boolean | |
owner | DE-861 |
owner_facet | DE-861 |
physical | 1 Online-Ressource (308 pages) |
psigel | ZDB-35-WIC UBG_PDA_WIC ZDB-35-WIC FRO_PDA_WIC ZDB-35-WIC UBG_PDA_WIC |
publishDate | 2008 |
publishDateSearch | 2008 |
publishDateSort | 2008 |
publisher | ISTE |
record_format | marc |
series2 | Control systems, robotics and manufacturing series |
spelling | Resource-constrained project scheduling models, algorithms, extensions and applications edited by Christian Artigues, Sophie Demassey, Emmanuel Néron London ISTE 2008 1 Online-Ressource (308 pages) txt rdacontent c rdamedia cr rdacarrier Control systems, robotics and manufacturing series Includes bibliographical references (pages 279-301) and index This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures TECHNOLOGY & ENGINEERING / Industrial Technology bisacsh TECHNOLOGY & ENGINEERING / Industrial Engineering bisacsh BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production scheduling fast Wirtschaft Production scheduling Projektmanagement (DE-588)4047441-0 gnd rswk-swf Projektmanagement (DE-588)4047441-0 s 1\p DE-604 Artigues, Christian Sonstige oth Demassey, Sophie Sonstige oth Neron, Emmanuel Sonstige oth https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227 Verlag URL des Erstveröffentlichers Volltext 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Resource-constrained project scheduling models, algorithms, extensions and applications TECHNOLOGY & ENGINEERING / Industrial Technology bisacsh TECHNOLOGY & ENGINEERING / Industrial Engineering bisacsh BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production scheduling fast Wirtschaft Production scheduling Projektmanagement (DE-588)4047441-0 gnd |
subject_GND | (DE-588)4047441-0 |
title | Resource-constrained project scheduling models, algorithms, extensions and applications |
title_auth | Resource-constrained project scheduling models, algorithms, extensions and applications |
title_exact_search | Resource-constrained project scheduling models, algorithms, extensions and applications |
title_full | Resource-constrained project scheduling models, algorithms, extensions and applications edited by Christian Artigues, Sophie Demassey, Emmanuel Néron |
title_fullStr | Resource-constrained project scheduling models, algorithms, extensions and applications edited by Christian Artigues, Sophie Demassey, Emmanuel Néron |
title_full_unstemmed | Resource-constrained project scheduling models, algorithms, extensions and applications edited by Christian Artigues, Sophie Demassey, Emmanuel Néron |
title_short | Resource-constrained project scheduling |
title_sort | resource constrained project scheduling models algorithms extensions and applications |
title_sub | models, algorithms, extensions and applications |
topic | TECHNOLOGY & ENGINEERING / Industrial Technology bisacsh TECHNOLOGY & ENGINEERING / Industrial Engineering bisacsh BUSINESS & ECONOMICS / Production & Operations Management bisacsh Production scheduling fast Wirtschaft Production scheduling Projektmanagement (DE-588)4047441-0 gnd |
topic_facet | TECHNOLOGY & ENGINEERING / Industrial Technology TECHNOLOGY & ENGINEERING / Industrial Engineering BUSINESS & ECONOMICS / Production & Operations Management Production scheduling Wirtschaft Projektmanagement |
url | https://onlinelibrary.wiley.com/doi/book/10.1002/9780470611227 |
work_keys_str_mv | AT artigueschristian resourceconstrainedprojectschedulingmodelsalgorithmsextensionsandapplications AT demasseysophie resourceconstrainedprojectschedulingmodelsalgorithmsextensionsandapplications AT neronemmanuel resourceconstrainedprojectschedulingmodelsalgorithmsextensionsandapplications |