Increasing aircraft carrier forward presence: changing the length of the maintenance cycle
Gespeichert in:
Format: | Elektronisch E-Book |
---|---|
Sprache: | English |
Veröffentlicht: |
Santa Monica, CA
RAND Corp.
2008
|
Schriftenreihe: | Rand Corporation monograph series
|
Schlagworte: | |
Online-Zugang: | FAW01 FAW02 Volltext |
Beschreibung: | "Prepared for the United States Navy.". - "MG-706-NAVY"--Page 4 of cover. - Research conducted within the Rand National Defense Research Institute. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 Includes bibliographical references (pages 67-70) Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs |
Beschreibung: | 1 Online-Ressource (xx, 70 pages) |
ISBN: | 0833044079 0833045954 9780833044075 9780833045959 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV043122406 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 151126s2008 |||| o||u| ||||||eng d | ||
020 | |a 0833044079 |9 0-8330-4407-9 | ||
020 | |a 0833045954 |c electronic bk. |9 0-8330-4595-4 | ||
020 | |a 9780833044075 |9 978-0-8330-4407-5 | ||
020 | |a 9780833045959 |c electronic bk. |9 978-0-8330-4595-9 | ||
035 | |a (OCoLC)234317049 | ||
035 | |a (DE-599)BVBBV043122406 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-1046 |a DE-1047 | ||
082 | 0 | |a 359.9/4835 |2 22 | |
245 | 1 | 0 | |a Increasing aircraft carrier forward presence |b changing the length of the maintenance cycle |c Roland J. Yardley [and others] |
264 | 1 | |a Santa Monica, CA |b RAND Corp. |c 2008 | |
300 | |a 1 Online-Ressource (xx, 70 pages) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Rand Corporation monograph series | |
500 | |a "Prepared for the United States Navy.". - "MG-706-NAVY"--Page 4 of cover. - Research conducted within the Rand National Defense Research Institute. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 | ||
500 | |a Includes bibliographical references (pages 67-70) | ||
500 | |a Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards | ||
500 | |a The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs | ||
610 | 1 | 4 | |a United States / Navy / Operational readiness |
610 | 2 | 4 | |a United States |b Navy |x Operational readiness |
650 | 7 | |a POLITICAL SCIENCE / Political Freedom & Security / International Security |2 bisacsh | |
650 | 7 | |a POLITICAL SCIENCE / Political Freedom & Security / General |2 bisacsh | |
650 | 7 | |a TECHNOLOGY / Military Science |2 bisacsh | |
650 | 7 | |a POLITICAL SCIENCE / Security (National & International) |2 bisacsh | |
650 | 4 | |a Aircraft carriers |z United States |x Maintenance and repair | |
651 | 4 | |a USA | |
700 | 1 | |a Yardley, Roland J. |e Sonstige |4 oth | |
710 | 2 | |a United States |b Navy |e Sonstige |4 oth | |
710 | 2 | |a National Defense Research Institute (U.S.) |e Sonstige |4 oth | |
856 | 4 | 0 | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143 |x Aggregator |3 Volltext |
912 | |a ZDB-4-EBA | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-028546597 | ||
966 | e | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143 |l FAW01 |p ZDB-4-EBA |q FAW_PDA_EBA |x Aggregator |3 Volltext | |
966 | e | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143 |l FAW02 |p ZDB-4-EBA |q FAW_PDA_EBA |x Aggregator |3 Volltext |
Datensatz im Suchindex
_version_ | 1804175553102610432 |
---|---|
any_adam_object | |
building | Verbundindex |
bvnumber | BV043122406 |
collection | ZDB-4-EBA |
ctrlnum | (OCoLC)234317049 (DE-599)BVBBV043122406 |
dewey-full | 359.9/4835 |
dewey-hundreds | 300 - Social sciences |
dewey-ones | 359 - Sea forces and warfare |
dewey-raw | 359.9/4835 |
dewey-search | 359.9/4835 |
dewey-sort | 3359.9 44835 |
dewey-tens | 350 - Public administration and military science |
discipline | Militärwissenschaft |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04647nmm a2200529zc 4500</leader><controlfield tag="001">BV043122406</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">151126s2008 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0833044079</subfield><subfield code="9">0-8330-4407-9</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0833045954</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">0-8330-4595-4</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780833044075</subfield><subfield code="9">978-0-8330-4407-5</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780833045959</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">978-0-8330-4595-9</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)234317049</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV043122406</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-1046</subfield><subfield code="a">DE-1047</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">359.9/4835</subfield><subfield code="2">22</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Increasing aircraft carrier forward presence</subfield><subfield code="b">changing the length of the maintenance cycle</subfield><subfield code="c">Roland J. Yardley [and others]</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Santa Monica, CA</subfield><subfield code="b">RAND Corp.</subfield><subfield code="c">2008</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (xx, 70 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Rand Corporation monograph series</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">"Prepared for the United States Navy.". - "MG-706-NAVY"--Page 4 of cover. - Research conducted within the Rand National Defense Research Institute. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references (pages 67-70)</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs</subfield></datafield><datafield tag="610" ind1="1" ind2="4"><subfield code="a">United States / Navy / Operational readiness</subfield></datafield><datafield tag="610" ind1="2" ind2="4"><subfield code="a">United States</subfield><subfield code="b">Navy</subfield><subfield code="x">Operational readiness</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">POLITICAL SCIENCE / Political Freedom & Security / International Security</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">POLITICAL SCIENCE / Political Freedom & Security / General</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY / Military Science</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">POLITICAL SCIENCE / Security (National & International)</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Aircraft carriers</subfield><subfield code="z">United States</subfield><subfield code="x">Maintenance and repair</subfield></datafield><datafield tag="651" ind1=" " ind2="4"><subfield code="a">USA</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Yardley, Roland J.</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">United States</subfield><subfield code="b">Navy</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">National Defense Research Institute (U.S.)</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-028546597</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143</subfield><subfield code="l">FAW01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FAW_PDA_EBA</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143</subfield><subfield code="l">FAW02</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FAW_PDA_EBA</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
geographic | USA |
geographic_facet | USA |
id | DE-604.BV043122406 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T07:18:07Z |
institution | BVB |
isbn | 0833044079 0833045954 9780833044075 9780833045959 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-028546597 |
oclc_num | 234317049 |
open_access_boolean | |
owner | DE-1046 DE-1047 |
owner_facet | DE-1046 DE-1047 |
physical | 1 Online-Ressource (xx, 70 pages) |
psigel | ZDB-4-EBA ZDB-4-EBA FAW_PDA_EBA |
publishDate | 2008 |
publishDateSearch | 2008 |
publishDateSort | 2008 |
publisher | RAND Corp. |
record_format | marc |
series2 | Rand Corporation monograph series |
spelling | Increasing aircraft carrier forward presence changing the length of the maintenance cycle Roland J. Yardley [and others] Santa Monica, CA RAND Corp. 2008 1 Online-Ressource (xx, 70 pages) txt rdacontent c rdamedia cr rdacarrier Rand Corporation monograph series "Prepared for the United States Navy.". - "MG-706-NAVY"--Page 4 of cover. - Research conducted within the Rand National Defense Research Institute. - Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002 Includes bibliographical references (pages 67-70) Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs United States / Navy / Operational readiness United States Navy Operational readiness POLITICAL SCIENCE / Political Freedom & Security / International Security bisacsh POLITICAL SCIENCE / Political Freedom & Security / General bisacsh TECHNOLOGY / Military Science bisacsh POLITICAL SCIENCE / Security (National & International) bisacsh Aircraft carriers United States Maintenance and repair USA Yardley, Roland J. Sonstige oth United States Navy Sonstige oth National Defense Research Institute (U.S.) Sonstige oth http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143 Aggregator Volltext |
spellingShingle | Increasing aircraft carrier forward presence changing the length of the maintenance cycle United States / Navy / Operational readiness United States Navy Operational readiness POLITICAL SCIENCE / Political Freedom & Security / International Security bisacsh POLITICAL SCIENCE / Political Freedom & Security / General bisacsh TECHNOLOGY / Military Science bisacsh POLITICAL SCIENCE / Security (National & International) bisacsh Aircraft carriers United States Maintenance and repair |
title | Increasing aircraft carrier forward presence changing the length of the maintenance cycle |
title_auth | Increasing aircraft carrier forward presence changing the length of the maintenance cycle |
title_exact_search | Increasing aircraft carrier forward presence changing the length of the maintenance cycle |
title_full | Increasing aircraft carrier forward presence changing the length of the maintenance cycle Roland J. Yardley [and others] |
title_fullStr | Increasing aircraft carrier forward presence changing the length of the maintenance cycle Roland J. Yardley [and others] |
title_full_unstemmed | Increasing aircraft carrier forward presence changing the length of the maintenance cycle Roland J. Yardley [and others] |
title_short | Increasing aircraft carrier forward presence |
title_sort | increasing aircraft carrier forward presence changing the length of the maintenance cycle |
title_sub | changing the length of the maintenance cycle |
topic | United States / Navy / Operational readiness United States Navy Operational readiness POLITICAL SCIENCE / Political Freedom & Security / International Security bisacsh POLITICAL SCIENCE / Political Freedom & Security / General bisacsh TECHNOLOGY / Military Science bisacsh POLITICAL SCIENCE / Security (National & International) bisacsh Aircraft carriers United States Maintenance and repair |
topic_facet | United States / Navy / Operational readiness United States Navy Operational readiness POLITICAL SCIENCE / Political Freedom & Security / International Security POLITICAL SCIENCE / Political Freedom & Security / General TECHNOLOGY / Military Science POLITICAL SCIENCE / Security (National & International) Aircraft carriers United States Maintenance and repair USA |
url | http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=230143 |
work_keys_str_mv | AT yardleyrolandj increasingaircraftcarrierforwardpresencechangingthelengthofthemaintenancecycle AT unitedstatesnavy increasingaircraftcarrierforwardpresencechangingthelengthofthemaintenancecycle AT nationaldefenseresearchinstituteus increasingaircraftcarrierforwardpresencechangingthelengthofthemaintenancecycle |