How to manage project opportunity and risk: why uncertainty management can be a much better approach than risk management
Gespeichert in:
Vorheriger Titel: | Project risk management : processes, insights and techniques |
---|---|
1. Verfasser: | |
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Chichester, West Sussex
Wiley
2012
|
Ausgabe: | 3rd ed |
Schlagworte: | |
Online-Zugang: | TUM01 Volltext |
Beschreibung: | 1 Online-Ressource (xxvi, 492 Seiten) |
ISBN: | 9781119962632 1119962633 9781119966654 1119966655 0470686499 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV042743747 | ||
003 | DE-604 | ||
005 | 20170825 | ||
007 | cr|uuu---uuuuu | ||
008 | 150806s2012 |||| o||u| ||||||eng d | ||
020 | |a 9781119962632 |c ebk. |9 978-1-119-96263-2 | ||
020 | |a 1119962633 |c ebk. |9 1-119-96263-3 | ||
020 | |a 9781119966654 |c ebk. |9 978-1-119-96665-4 | ||
020 | |a 1119966655 |c ebk. |9 1-119-96665-5 | ||
020 | |a 0470686499 |9 0-470-68649-9 | ||
035 | |a (OCoLC)769187441 | ||
035 | |a (DE-599)BVBBV042743747 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-91 | ||
082 | 0 | |a 658.4/04 |2 23 | |
100 | 1 | |a Chapman, Chris |d 1939- |e Verfasser |0 (DE-588)12481736X |4 aut | |
245 | 1 | 0 | |a How to manage project opportunity and risk |b why uncertainty management can be a much better approach than risk management |c Chris Chapman and Stephen Ward |
246 | 1 | 3 | |a Project risk management |
250 | |a 3rd ed | ||
264 | 1 | |a Chichester, West Sussex |b Wiley |c 2012 | |
300 | |a 1 Online-Ressource (xxvi, 492 Seiten) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
505 | 8 | |a Includes bibliographical references and index | |
505 | 8 | |a Machine generated contents note: pt. I Setting the scene -- 1. Uncertainty in and around projects -- 2. Uncertainty, risk and opportunity -- 3. Key motives for uncertainty management -- 4. An overview of generic process frameworks -- pt. II The generic process in one key lifecycle stage -- 5. Define the project -- 6. Focus the process -- 7. Identify all the relevant sources of uncertainty, response options and conditions -- 8. Structure all uncertainty -- 9. Clarify ownership -- 10. Quantify some uncertainty -- 11. Evaluate all the relevant implications -- pt. III The generic process in all lifecycle stages -- 12. Fully integrating the strategy shaping stages -- 13. Fully integrating the strategy implementation stages -- pt. IV Key corporate implications -- 14. Developing PUMP capability as a project -- 15. Contracts and governance as frameworks for enlightened relationship management -- 16.A corporate capability perspective | |
650 | 7 | |a BUSINESS & ECONOMICS / Project Management |2 bisacsh | |
650 | 7 | |a TECHNOLOGY & ENGINEERING / Project Management |2 bisacsh | |
650 | 7 | |a Project management |2 fast | |
650 | 7 | |a Risk management |2 fast | |
650 | 4 | |a Wirtschaft | |
650 | 4 | |a Project management | |
650 | 4 | |a Risk management | |
650 | 0 | 7 | |a Projektmanagement |0 (DE-588)4047441-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Risikomanagement |0 (DE-588)4121590-4 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Projektmanagement |0 (DE-588)4047441-0 |D s |
689 | 0 | 1 | |a Risikomanagement |0 (DE-588)4121590-4 |D s |
689 | 0 | |8 1\p |5 DE-604 | |
700 | 1 | |a Ward, Stephen |e Sonstige |0 (DE-588)124817408 |4 oth | |
780 | 0 | 0 | |i updated and re-titled 3rd edition of |t Project risk management : processes, insights and techniques |w (DE-604)BV019973687 |
856 | 4 | 0 | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606 |x Aggregator |3 Volltext |
912 | |a ZDB-4-NLEBK | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-028174616 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
966 | e | |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606 |l TUM01 |p ZDB-4-NLEBK |q TUM_PDA_EBSCOBAE_gekauft |x Aggregator |3 Volltext |
Datensatz im Suchindex
_version_ | 1804174957012320256 |
---|---|
any_adam_object | |
author | Chapman, Chris 1939- |
author_GND | (DE-588)12481736X (DE-588)124817408 |
author_facet | Chapman, Chris 1939- |
author_role | aut |
author_sort | Chapman, Chris 1939- |
author_variant | c c cc |
building | Verbundindex |
bvnumber | BV042743747 |
collection | ZDB-4-NLEBK |
contents | Includes bibliographical references and index Machine generated contents note: pt. I Setting the scene -- 1. Uncertainty in and around projects -- 2. Uncertainty, risk and opportunity -- 3. Key motives for uncertainty management -- 4. An overview of generic process frameworks -- pt. II The generic process in one key lifecycle stage -- 5. Define the project -- 6. Focus the process -- 7. Identify all the relevant sources of uncertainty, response options and conditions -- 8. Structure all uncertainty -- 9. Clarify ownership -- 10. Quantify some uncertainty -- 11. Evaluate all the relevant implications -- pt. III The generic process in all lifecycle stages -- 12. Fully integrating the strategy shaping stages -- 13. Fully integrating the strategy implementation stages -- pt. IV Key corporate implications -- 14. Developing PUMP capability as a project -- 15. Contracts and governance as frameworks for enlightened relationship management -- 16.A corporate capability perspective |
ctrlnum | (OCoLC)769187441 (DE-599)BVBBV042743747 |
dewey-full | 658.4/04 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.4/04 |
dewey-search | 658.4/04 |
dewey-sort | 3658.4 14 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | 3rd ed |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03378nmm a2200577zc 4500</leader><controlfield tag="001">BV042743747</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20170825 </controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">150806s2012 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781119962632</subfield><subfield code="c">ebk.</subfield><subfield code="9">978-1-119-96263-2</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1119962633</subfield><subfield code="c">ebk.</subfield><subfield code="9">1-119-96263-3</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781119966654</subfield><subfield code="c">ebk.</subfield><subfield code="9">978-1-119-96665-4</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1119966655</subfield><subfield code="c">ebk.</subfield><subfield code="9">1-119-96665-5</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0470686499</subfield><subfield code="9">0-470-68649-9</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)769187441</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV042743747</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.4/04</subfield><subfield code="2">23</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Chapman, Chris</subfield><subfield code="d">1939-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)12481736X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">How to manage project opportunity and risk</subfield><subfield code="b">why uncertainty management can be a much better approach than risk management</subfield><subfield code="c">Chris Chapman and Stephen Ward</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Project risk management</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">3rd ed</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Chichester, West Sussex</subfield><subfield code="b">Wiley</subfield><subfield code="c">2012</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (xxvi, 492 Seiten)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Includes bibliographical references and index</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Machine generated contents note: pt. I Setting the scene -- 1. Uncertainty in and around projects -- 2. Uncertainty, risk and opportunity -- 3. Key motives for uncertainty management -- 4. An overview of generic process frameworks -- pt. II The generic process in one key lifecycle stage -- 5. Define the project -- 6. Focus the process -- 7. Identify all the relevant sources of uncertainty, response options and conditions -- 8. Structure all uncertainty -- 9. Clarify ownership -- 10. Quantify some uncertainty -- 11. Evaluate all the relevant implications -- pt. III The generic process in all lifecycle stages -- 12. Fully integrating the strategy shaping stages -- 13. Fully integrating the strategy implementation stages -- pt. IV Key corporate implications -- 14. Developing PUMP capability as a project -- 15. Contracts and governance as frameworks for enlightened relationship management -- 16.A corporate capability perspective</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">BUSINESS & ECONOMICS / Project Management</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING / Project Management</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Project management</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Risk management</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Wirtschaft</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Project management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Risk management</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Risikomanagement</subfield><subfield code="0">(DE-588)4121590-4</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Risikomanagement</subfield><subfield code="0">(DE-588)4121590-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Ward, Stephen</subfield><subfield code="e">Sonstige</subfield><subfield code="0">(DE-588)124817408</subfield><subfield code="4">oth</subfield></datafield><datafield tag="780" ind1="0" ind2="0"><subfield code="i">updated and re-titled 3rd edition of</subfield><subfield code="t">Project risk management : processes, insights and techniques</subfield><subfield code="w">(DE-604)BV019973687</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-NLEBK</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-028174616</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606</subfield><subfield code="l">TUM01</subfield><subfield code="p">ZDB-4-NLEBK</subfield><subfield code="q">TUM_PDA_EBSCOBAE_gekauft</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV042743747 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T07:08:38Z |
institution | BVB |
isbn | 9781119962632 1119962633 9781119966654 1119966655 0470686499 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-028174616 |
oclc_num | 769187441 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
physical | 1 Online-Ressource (xxvi, 492 Seiten) |
psigel | ZDB-4-NLEBK ZDB-4-NLEBK TUM_PDA_EBSCOBAE_gekauft |
publishDate | 2012 |
publishDateSearch | 2012 |
publishDateSort | 2012 |
publisher | Wiley |
record_format | marc |
spelling | Chapman, Chris 1939- Verfasser (DE-588)12481736X aut How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management Chris Chapman and Stephen Ward Project risk management 3rd ed Chichester, West Sussex Wiley 2012 1 Online-Ressource (xxvi, 492 Seiten) txt rdacontent c rdamedia cr rdacarrier Includes bibliographical references and index Machine generated contents note: pt. I Setting the scene -- 1. Uncertainty in and around projects -- 2. Uncertainty, risk and opportunity -- 3. Key motives for uncertainty management -- 4. An overview of generic process frameworks -- pt. II The generic process in one key lifecycle stage -- 5. Define the project -- 6. Focus the process -- 7. Identify all the relevant sources of uncertainty, response options and conditions -- 8. Structure all uncertainty -- 9. Clarify ownership -- 10. Quantify some uncertainty -- 11. Evaluate all the relevant implications -- pt. III The generic process in all lifecycle stages -- 12. Fully integrating the strategy shaping stages -- 13. Fully integrating the strategy implementation stages -- pt. IV Key corporate implications -- 14. Developing PUMP capability as a project -- 15. Contracts and governance as frameworks for enlightened relationship management -- 16.A corporate capability perspective BUSINESS & ECONOMICS / Project Management bisacsh TECHNOLOGY & ENGINEERING / Project Management bisacsh Project management fast Risk management fast Wirtschaft Project management Risk management Projektmanagement (DE-588)4047441-0 gnd rswk-swf Risikomanagement (DE-588)4121590-4 gnd rswk-swf Projektmanagement (DE-588)4047441-0 s Risikomanagement (DE-588)4121590-4 s 1\p DE-604 Ward, Stephen Sonstige (DE-588)124817408 oth updated and re-titled 3rd edition of Project risk management : processes, insights and techniques (DE-604)BV019973687 http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606 Aggregator Volltext 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Chapman, Chris 1939- How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management Includes bibliographical references and index Machine generated contents note: pt. I Setting the scene -- 1. Uncertainty in and around projects -- 2. Uncertainty, risk and opportunity -- 3. Key motives for uncertainty management -- 4. An overview of generic process frameworks -- pt. II The generic process in one key lifecycle stage -- 5. Define the project -- 6. Focus the process -- 7. Identify all the relevant sources of uncertainty, response options and conditions -- 8. Structure all uncertainty -- 9. Clarify ownership -- 10. Quantify some uncertainty -- 11. Evaluate all the relevant implications -- pt. III The generic process in all lifecycle stages -- 12. Fully integrating the strategy shaping stages -- 13. Fully integrating the strategy implementation stages -- pt. IV Key corporate implications -- 14. Developing PUMP capability as a project -- 15. Contracts and governance as frameworks for enlightened relationship management -- 16.A corporate capability perspective BUSINESS & ECONOMICS / Project Management bisacsh TECHNOLOGY & ENGINEERING / Project Management bisacsh Project management fast Risk management fast Wirtschaft Project management Risk management Projektmanagement (DE-588)4047441-0 gnd Risikomanagement (DE-588)4121590-4 gnd |
subject_GND | (DE-588)4047441-0 (DE-588)4121590-4 |
title | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management |
title_alt | Project risk management |
title_auth | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management |
title_exact_search | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management |
title_full | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management Chris Chapman and Stephen Ward |
title_fullStr | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management Chris Chapman and Stephen Ward |
title_full_unstemmed | How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management Chris Chapman and Stephen Ward |
title_old | Project risk management : processes, insights and techniques |
title_short | How to manage project opportunity and risk |
title_sort | how to manage project opportunity and risk why uncertainty management can be a much better approach than risk management |
title_sub | why uncertainty management can be a much better approach than risk management |
topic | BUSINESS & ECONOMICS / Project Management bisacsh TECHNOLOGY & ENGINEERING / Project Management bisacsh Project management fast Risk management fast Wirtschaft Project management Risk management Projektmanagement (DE-588)4047441-0 gnd Risikomanagement (DE-588)4121590-4 gnd |
topic_facet | BUSINESS & ECONOMICS / Project Management TECHNOLOGY & ENGINEERING / Project Management Project management Risk management Wirtschaft Projektmanagement Risikomanagement |
url | http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=509606 |
work_keys_str_mv | AT chapmanchris howtomanageprojectopportunityandriskwhyuncertaintymanagementcanbeamuchbetterapproachthanriskmanagement AT wardstephen howtomanageprojectopportunityandriskwhyuncertaintymanagementcanbeamuchbetterapproachthanriskmanagement AT chapmanchris projectriskmanagement AT wardstephen projectriskmanagement |