Effective transition from design to production:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Boca Raton, Fla.
Auerbach
2008
[London] Taylor & Francis |
Schriftenreihe: | Series on resource management
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | Literaturangaben |
Beschreibung: | XXII, 246 S. Ill., graph. Darst. 25 cm |
ISBN: | 9781420046861 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV042140758 | ||
003 | DE-604 | ||
005 | 20141120 | ||
007 | t | ||
008 | 141022s2008 ad|| b||| 00||| eng d | ||
015 | |a GBA743476 |2 dnb | ||
020 | |a 9781420046861 |c (hbk.) : £44.99 |9 978-1-4200-4686-1 | ||
035 | |a (OCoLC)636853681 | ||
035 | |a (DE-599)OBVAC07453565 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-M347 | ||
050 | 0 | |a TS176 | |
082 | 0 | |a 658.5 |2 22 | |
084 | |a QP 540 |0 (DE-625)141899: |2 rvk | ||
084 | |a 85.15 |2 bkl | ||
100 | 1 | |a Ciambrone, David F. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Effective transition from design to production |c David F. Ciambrone |
264 | 1 | |a Boca Raton, Fla. |b Auerbach |c 2008 | |
264 | 1 | |a [London] |b Taylor & Francis | |
300 | |a XXII, 246 S. |b Ill., graph. Darst. |c 25 cm | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 0 | |a Series on resource management | |
500 | |a Literaturangaben | ||
650 | 4 | |a Production engineering | |
650 | 0 | 7 | |a Verfahrenstechnik |0 (DE-588)4062781-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigung |0 (DE-588)4016899-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsplanung |0 (DE-588)4047360-0 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4006432-3 |a Bibliografie |2 gnd-content | |
689 | 0 | 0 | |a Produktionsplanung |0 (DE-588)4047360-0 |D s |
689 | 0 | 1 | |a Verfahrenstechnik |0 (DE-588)4062781-0 |D s |
689 | 0 | 2 | |a Fertigung |0 (DE-588)4016899-2 |D s |
689 | 0 | |5 DE-604 | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027580729&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-027580729 |
Datensatz im Suchindex
_version_ | 1804152625816403968 |
---|---|
adam_text | Contents
Acknowledgments..........................................................................................ix
Introduction...................................................................................................xi
About the Author......................................................................................xxiii
1 Proposal/Contract..................................................................................1
1.1 Strategic Planning...............................................................................1
1.2 Proposal Support................................................................................2
1.3 Identifying Customer Requirements...................................................2
1.4 Determining Product Concept.........................................................16
1.5 Determining Commonality..............................................................16
1.6 Requests for Deviation from Customer Requirements......................17
1.7 Program Risk: Analysis and Mitigation............................................18
1.8 Developing Design-to-Cost Goals....................................................19
1.9 Master Schedule...............................................................................21
1.10 Determining Production Philosophy and Location...........................22
1.11 Simulation Analysis for Producibility...............................................23
1.12 Simulation Analysis for Factory and Space Planning........................23
1.13 Assembly Tooling, Fixture, and Equipment Forecasts......................24
1.14 New or Modified Production Equipment.........................................25
2 System Design......................................................................................27
2.1 Conduct Preliminary Design-to-Cost (DTC) Analysis.....................27
2.2 Assembly Process Methodology........................................................28
2.3 Develop Tooling Concepts...............................................................28
2.4 Develop Preliminary Manufacturing Plan or Flow...........................28
2.5 Identify New Manufacturing Technologies......................................31
2.6 Determine Product-Packaging Requirements...................................33
2.7 Develop Prototype Assembly Tooling...............................................33
2.8 Conduct Facilities Analysis..............................................................34
2.9 Determine Logistical Support Requirements...................................34
2.10 Determine Capital Equipment Requirements...................................35
2.11 Determine Test Philosophy...............................................................35
2.12 Determine Quality Assurance Requirements....................................35
v
vi ¦ Contents
2.13 Identify Human Resource Requirements..........................................38
2.14 Meetings...........................................................................................39
Detailed Design....................................................................................41
3.1 Design Considerations......................................................................41
3.1.1 Conceptual Design................................................................43
3.1.2 Analysis and Refinement......................................................44
3.1.3 Design for Manufacture.......................................................44
3.1.4 Drafting and Documentation...............................................45
3.1.5 Toolpath Creation and Machining.......................................46
3.2 New Production Process Development.............................................48
3.3 Assembly/Process Methodology........................................................48
3.4 Design to Cost..................................................................................48
3.5 Conduct Parts Obsolescence Study...................................................49
3.6 Design for Production......................................................................50
3.7 Design for Manufacturing and Assembly (DFMA)..........................51
3.8 Conduct Formal Cross-Functional Design Reviews.........................53
3.9 Bill of Material (BOM).....................................................................54
3.10 Assembly Simulation........................................................................54
3.11 Selecting Subcontractors and Vendors..............................................56
3.12 Determine Exit Criteria for Design Output to Manufacturing.........57
3.13 Create Detailed Manufacturing Plan/Flow.......................................58
3.14 Create Lean Factory Design/Balanced Flow.....................................58
3.14.1 The 5S Visual Controls..........................................................59
3.14.1.1 When to Use........................................................60
3.14.1.2 How-to Steps........................................................60
3.14.1.3 Why Have Visual Controls?..................................61
3.14.1.4 What a Visual Workplace Looks Like...................61
3.14.2 The Five Whys......................................................................61
3.14.2.1 When to Use.........................................................61
3.15 Develop Configuration Management Plan.......................................62
3.16 Documentation Media Method........................................................63
3.17 Conduct Product Design Documentation Release...........................64
3.18 Prepare Test Integration Plan...........................................................64
3.19 Create Test Hardware and Software.................................................65
3.20 Printed Wire Board Design to Release: An Example.......................66
3.20.1 Producibility Engineers........................................................66
3.20.1.1 Technology Roadmap...........................................68
3.20.1.2 Metrics..................................................................68
3.20.2 Circuit Card Assembly (COE): Role and Responsibility.............68
3.20.2.1 Circuit Card Assembly: Proof-of-Design
Process..................................................................69
3.20.2.2 Task Description...................................................69
Contents ¦ vii
Manufacturing Planning and Process/Prototype/Test
Development........................................................................................81
4.1 Transition to New Production Processes...........................................89
4.2 Determine Facility Requirements....................................................90
4.3 Finalize Assembly Methodology......................................................90
4.4 Determine Tool Design and Fabrication Requirements...................90
4.5 Implement Ergonomics.....................................................................91
4.6 Transition to a Contract Manufacturing Facility..............................91
4.7 Implement Vendor Monitoring.........................................................94
4.8 Write Software Programs for Manufacturing Equipment.................95
4.9 Implement Assembly Tooling...........................................................95
4.10 Finalize New Production Processes...................................................96
4.11 Conduct Line Balancing Analysis.....................................................96
4.12 Establish Metrics..............................................................................96
4.13 Determine Inventory System Based on Contractual Type.................97
4.14 Create Staffing Plan..........................................................................98
4.15 Control Tools...................................................................................98
4.16 Finalizing Manufacturing Plan/Flow................................................98
4.17 Conduct Prototype Documentation Planning..................................98
4.18 Determine Capital Requirements.....................................................99
4.19 Create Inventory System...................................................................99
4.20 Finalizing Production Plan...............................................................99
4.21 Conduct a Production Readiness Review..........................................99
4.22 Test Integration..............................................................................100
4.23 Manufacturing Plan.......................................................................102
Production Readiness.........................................................................105
5.1 Production Readiness Is a Complex Step........................................105
5.2 Implement Line Stock.....................................................................108
5.3 Implement Configuration Management.........................................109
5.4 Create Change Control Board........................................................109
5.5 Verify Tooling.................................................................................109
5.6 Support Transition-to-Production Processes...................................110
5.7 Create Prototype Routing and Planning.........................................110
5.8 Develop Change Control Board Protocol.......................................111
5.9 Conduct Prototype Kitting.............................................................Ill
5.10 Coordinate Configuration Management with Vendors...................111
5.11 Develop Quality Assurance Requirements/Buy-Off.......................112
5.12 Train Production Staff....................................................................112
5.13 Build Prototype Units.....................................................................113
Low-Rate Initial Production..............................................................115
6.1 Introduction...................................................................................115
6.2 Implement Production Tooling.......................................................118
VIII
Contents
6.3 Update Tooling Documentation.....................................................118
6.4 Verify Calibration and Maintenance Schedules..............................119
6.5 Update Drawing Documentation...................................................119
6.6 Update Planning Documentation...................................................119
6.7 Implement Kitting Plans.................................................................119
6.8 Update Test Fixtures and Software for Production Hardware.........119
6.9 Finalize Staffing Plan......................................................................120
6.10 Build First Article...........................................................................120
6.11 Create a Master Schedule................................................................120
6.12 Update Documentation Changes...................................................121
6.13 Conduct First-Article Buy-Off Procedures......................................121
6.14 Begin Low-Rate Initial Production (LRIP).....................................121
6.15 Determine Production Ramp-Up...................................................122
7 Production..........................................................................................123
7-1 Build Production Units: Ramp up to Full Production....................123
8 Other Areas for Concern....................................................................127
8.1 Data Loss........................................................................................127
8.2 Production Breaks: Bathtub Issues..................................................128
8.3 Defect Control................................................................................129
8.4 The Hidden Factory........................................................................130
8.5 The Experience Level of Manufacturing and Producibility
Engineering Personnel....................................................................130
References...................................................................................................133
Appendix A Quality Function Deployment (QFD).................................135
Appendix B Six Sigma and Design-to-Production Transition................139
Appendix C Design for Manufacturing...................................................163
Appendix D Effective Transition from Design to Production Vendor
Survey Tools........................................................................173
Appendix E Effective Transition from Design to Production.................191
Appendix F Design for the Environment (DfE)......................................229
Index...........................................................................................................241
|
any_adam_object | 1 |
author | Ciambrone, David F. |
author_facet | Ciambrone, David F. |
author_role | aut |
author_sort | Ciambrone, David F. |
author_variant | d f c df dfc |
building | Verbundindex |
bvnumber | BV042140758 |
callnumber-first | T - Technology |
callnumber-label | TS176 |
callnumber-raw | TS176 |
callnumber-search | TS176 |
callnumber-sort | TS 3176 |
callnumber-subject | TS - Manufactures |
classification_rvk | QP 540 |
ctrlnum | (OCoLC)636853681 (DE-599)OBVAC07453565 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01765nam a2200469 c 4500</leader><controlfield tag="001">BV042140758</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20141120 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">141022s2008 ad|| b||| 00||| eng d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">GBA743476</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781420046861</subfield><subfield code="c">(hbk.) : £44.99</subfield><subfield code="9">978-1-4200-4686-1</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)636853681</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)OBVAC07453565</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-M347</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS176</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">22</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 540</subfield><subfield code="0">(DE-625)141899:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">85.15</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Ciambrone, David F.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Effective transition from design to production</subfield><subfield code="c">David F. Ciambrone</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Boca Raton, Fla.</subfield><subfield code="b">Auerbach</subfield><subfield code="c">2008</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">[London]</subfield><subfield code="b">Taylor & Francis</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XXII, 246 S.</subfield><subfield code="b">Ill., graph. Darst.</subfield><subfield code="c">25 cm</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Series on resource management</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Literaturangaben</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production engineering</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Verfahrenstechnik</subfield><subfield code="0">(DE-588)4062781-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigung</subfield><subfield code="0">(DE-588)4016899-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4006432-3</subfield><subfield code="a">Bibliografie</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Verfahrenstechnik</subfield><subfield code="0">(DE-588)4062781-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Fertigung</subfield><subfield code="0">(DE-588)4016899-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027580729&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-027580729</subfield></datafield></record></collection> |
genre | (DE-588)4006432-3 Bibliografie gnd-content |
genre_facet | Bibliografie |
id | DE-604.BV042140758 |
illustrated | Illustrated |
indexdate | 2024-07-10T01:13:42Z |
institution | BVB |
isbn | 9781420046861 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-027580729 |
oclc_num | 636853681 |
open_access_boolean | |
owner | DE-M347 |
owner_facet | DE-M347 |
physical | XXII, 246 S. Ill., graph. Darst. 25 cm |
publishDate | 2008 |
publishDateSearch | 2008 |
publishDateSort | 2008 |
publisher | Auerbach Taylor & Francis |
record_format | marc |
series2 | Series on resource management |
spelling | Ciambrone, David F. Verfasser aut Effective transition from design to production David F. Ciambrone Boca Raton, Fla. Auerbach 2008 [London] Taylor & Francis XXII, 246 S. Ill., graph. Darst. 25 cm txt rdacontent n rdamedia nc rdacarrier Series on resource management Literaturangaben Production engineering Verfahrenstechnik (DE-588)4062781-0 gnd rswk-swf Fertigung (DE-588)4016899-2 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 gnd rswk-swf (DE-588)4006432-3 Bibliografie gnd-content Produktionsplanung (DE-588)4047360-0 s Verfahrenstechnik (DE-588)4062781-0 s Fertigung (DE-588)4016899-2 s DE-604 HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027580729&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Ciambrone, David F. Effective transition from design to production Production engineering Verfahrenstechnik (DE-588)4062781-0 gnd Fertigung (DE-588)4016899-2 gnd Produktionsplanung (DE-588)4047360-0 gnd |
subject_GND | (DE-588)4062781-0 (DE-588)4016899-2 (DE-588)4047360-0 (DE-588)4006432-3 |
title | Effective transition from design to production |
title_auth | Effective transition from design to production |
title_exact_search | Effective transition from design to production |
title_full | Effective transition from design to production David F. Ciambrone |
title_fullStr | Effective transition from design to production David F. Ciambrone |
title_full_unstemmed | Effective transition from design to production David F. Ciambrone |
title_short | Effective transition from design to production |
title_sort | effective transition from design to production |
topic | Production engineering Verfahrenstechnik (DE-588)4062781-0 gnd Fertigung (DE-588)4016899-2 gnd Produktionsplanung (DE-588)4047360-0 gnd |
topic_facet | Production engineering Verfahrenstechnik Fertigung Produktionsplanung Bibliografie |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027580729&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT ciambronedavidf effectivetransitionfromdesigntoproduction |