Project portfolio selection in the automotive supplier industry:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Abschlussarbeit Buch |
Sprache: | English |
Veröffentlicht: |
2014
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | VII, 86 S. |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV041714661 | ||
003 | DE-604 | ||
005 | 20140314 | ||
007 | t | ||
008 | 140303s2014 m||| 00||| eng d | ||
035 | |a (OCoLC)876298722 | ||
035 | |a (DE-599)BVBBV041714661 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a eng | |
049 | |a DE-355 |a DE-12 | ||
084 | |a QR 524 |0 (DE-625)142043: |2 rvk | ||
100 | 1 | |a Lienland, Bernhard |e Verfasser |4 aut | |
245 | 1 | 0 | |a Project portfolio selection in the automotive supplier industry |c von Bernhard Lienland |
264 | 1 | |c 2014 | |
300 | |a VII, 86 S. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
502 | |a Regensburg, Univ., Diss., 2014 | ||
650 | 0 | 7 | |a Entscheidungsprozess |0 (DE-588)4121202-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Projektauswahl |0 (DE-588)4125458-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Kraftfahrzeugzulieferindustrie |0 (DE-588)4260022-4 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a Kraftfahrzeugzulieferindustrie |0 (DE-588)4260022-4 |D s |
689 | 0 | 1 | |a Projektauswahl |0 (DE-588)4125458-2 |D s |
689 | 0 | 2 | |a Entscheidungsprozess |0 (DE-588)4121202-2 |D s |
689 | 0 | |C b |5 DE-604 | |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027161789&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-027161789 |
Datensatz im Suchindex
_version_ | 1804151989030879232 |
---|---|
adam_text | PROJECT PORTFOLIO SELECTION IN THE AUTOMOTIVE SUPPLIER INDUSTRY
CONTENTS
LIST OF FIGURES V
LIST OF TABLES V
LIST OF ABBREVIATIONS VII
1 INTRODUCTION 1
1.1 PROJECT SELECTION AS A DECISIVE PROCESS 1
1.2 RESEARCH RELATED TO PROJECT SELECTION IN THE AUTOMOTIVE SUPPLIER
INDUSTRY 3
1.3 FOCUS 1: ALLOCATING INDIRECT TOOLING COSTS TO PRODUCTION ORDERS S
1.4 FOCUS 2: THE UNDERVALUATION OF CORPORATE REPUTATION AS A SUPPLIER
SELECTION FACTOR 6
1.5 FOCUS 3: PROJECT SELECTION WITH LINEAR OPTIMIZATION 7
1.6 FOCUS 4: A REVIEW AND COMPARISON OF GENETIC ALGORITHMS FOR THE 0-1
MULTIDIMENSIONAL
KNAPSACK PROBLEM 8
2 ALLOCATING INDIRECT TOOLING COSTS TO PRODUCTION ORDERS 9
2.1 INTRODUCTION 10
2.2 LITERATURE REVIEW 11
2.2.1 ASSESSING DIFFERENT ALLOCATION PRINCIPLES FOR DIFFERENT PURPOSES
11
2.2.2 PRINCIPLES FOR ALLOCATION 13
2.3 METHODOLOGY 19
2.3.1 CRITERIA FOR EVALUATING THE ALLOCATION SCHEMES 19
2.3.2 ASSESSING THE ALLOCATION METHODS - COMPUTATIONAL STUDY 21
2.3.3 IDENTIFYING THE MOST SUITABLE ALLOCATION SCHEME - THE AHP
TECHNIQUE 22
2.4 RESULTS . . 25
2.5 DISCUSSION 29
2.6 CONCLUSION 31
2.7 APPENDIX: APPLYING THE ALLOCATION SCHEMES (NUMERICAL EXAMPLES) 32
3 THE UNDERVALUATION OF CORPORATE REPUTATION AS A SUPPLIER SELECTION
FACTOR 37
3.1 INTRODUCTION 38
3.2 LITERATURE REVIEW 40
3.2.1 SUPPLIER SELECTION FACTORS 40
3.2.2 INGREDIENT BRANDING 41
3.3 METHOD 43
3.3.1 PARTICIPANTS 43
3.3.2 MATERIALS 43
3.3.3 DESIGN 45
3.3.4 PROCEDURE 45
3.4 RESULTS 46
3.5 DISCUSSION 48
3.6 IMPLICATIONS 49
3.7 CONCLUSION 50
III
HTTP://D-NB.INFO/1049863097
PROJECT PORTFOLIO SELECTION IN THE AUTOMOTIVE SUPPLIER INDUSTRY
3.8 APPENDICES 51
4 PROJECT SELECTION WITH LINEAR OPTIMIZATION 55
4.1 PROJEKTAUSWAHL ALS GRANDLAGE FQR DEN UNTERNEHMENSERFOLG 56
4.2 AUSGANGSSITUATION 56
4.2.1 DAS UNTEMEHMEN 56
4.2.2 DIE BISHERIGE PROJEKTAUSWAHL 57
4.2.3 DIE PROBLEME: UNRENTABLE PROJEKTAUSWAHL, STEIGENDE FIXKOSTEN UND
OBERSCHRITTENE
BUDGETGRENZEN 57
4.2.4 ANFBRDEMNGEN AN DAS NEUE VERFAHREN 57
4.3 ANSSTZE AUS DER THEORIE 58
4.3.1 PROJEKTAUSWAHLMETHODEN 58
4.3.2 INSTRUMENTE 59
4.4 LFISUNG: INTEGRFERTE PROJEKTAUSWAHL 60
4.4.1 DIE LINEARE OPTIMIERUNG ALS MFIGIICHKEIT ZUR PROJEKTAUSWAHL 60
4.4.2 DIE TECHNISCHE UMSETZUNG 63
4.5 ERGEBNISSE 65
4.5.1 PROFITABLE PROJEKTAUSWAHL MIT FIX- UND KAPITALKOSTENEFFIZIENZ BEI
SIMULTANER
BUDGETBEACHTUNG 65
4.5.2 OPTIMALE ERGEBNISSE ALS DISKUSSIONSBASIS 66
4.5.3 PREISGESTALTUNG BEIM ANGEBOTSPROZESS 66
5 A REVIEW AND COMPARISON OF GENETIC ALGORITHMS FOR THE 0-1
MULTIDIMENSIONAL
KNAPSACK PROBLEM 67
5.1 INTRODUCTION 68
5.2 LITERATURE OVERVIEW 68
5.2.1 COMPARISONS 68
5.2.2 GENETIC ALGORITHMS 69
5.3 EXPERIMENTAL COMPARISON 72
5.3.1 MATERIAL 72
5.3.2 PROCEDURE 72
5.4 RESULTS 72
5.5 DISCUSSION 75
5.6 CONCLUSION 76
6 FUTURE RESEARCH 77
BIBLIOGRAPHY 79
IV
|
any_adam_object | 1 |
author | Lienland, Bernhard |
author_facet | Lienland, Bernhard |
author_role | aut |
author_sort | Lienland, Bernhard |
author_variant | b l bl |
building | Verbundindex |
bvnumber | BV041714661 |
classification_rvk | QR 524 |
ctrlnum | (OCoLC)876298722 (DE-599)BVBBV041714661 |
discipline | Wirtschaftswissenschaften |
format | Thesis Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01494nam a2200373 c 4500</leader><controlfield tag="001">BV041714661</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20140314 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">140303s2014 m||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)876298722</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV041714661</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-355</subfield><subfield code="a">DE-12</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QR 524</subfield><subfield code="0">(DE-625)142043:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Lienland, Bernhard</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Project portfolio selection in the automotive supplier industry</subfield><subfield code="c">von Bernhard Lienland</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">VII, 86 S.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="502" ind1=" " ind2=" "><subfield code="a">Regensburg, Univ., Diss., 2014</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Entscheidungsprozess</subfield><subfield code="0">(DE-588)4121202-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektauswahl</subfield><subfield code="0">(DE-588)4125458-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kraftfahrzeugzulieferindustrie</subfield><subfield code="0">(DE-588)4260022-4</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Kraftfahrzeugzulieferindustrie</subfield><subfield code="0">(DE-588)4260022-4</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Projektauswahl</subfield><subfield code="0">(DE-588)4125458-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Entscheidungsprozess</subfield><subfield code="0">(DE-588)4121202-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="C">b</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027161789&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-027161789</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV041714661 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T01:03:34Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-027161789 |
oclc_num | 876298722 |
open_access_boolean | |
owner | DE-355 DE-BY-UBR DE-12 |
owner_facet | DE-355 DE-BY-UBR DE-12 |
physical | VII, 86 S. |
publishDate | 2014 |
publishDateSearch | 2014 |
publishDateSort | 2014 |
record_format | marc |
spelling | Lienland, Bernhard Verfasser aut Project portfolio selection in the automotive supplier industry von Bernhard Lienland 2014 VII, 86 S. txt rdacontent n rdamedia nc rdacarrier Regensburg, Univ., Diss., 2014 Entscheidungsprozess (DE-588)4121202-2 gnd rswk-swf Projektauswahl (DE-588)4125458-2 gnd rswk-swf Kraftfahrzeugzulieferindustrie (DE-588)4260022-4 gnd rswk-swf (DE-588)4113937-9 Hochschulschrift gnd-content Kraftfahrzeugzulieferindustrie (DE-588)4260022-4 s Projektauswahl (DE-588)4125458-2 s Entscheidungsprozess (DE-588)4121202-2 s b DE-604 DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027161789&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Lienland, Bernhard Project portfolio selection in the automotive supplier industry Entscheidungsprozess (DE-588)4121202-2 gnd Projektauswahl (DE-588)4125458-2 gnd Kraftfahrzeugzulieferindustrie (DE-588)4260022-4 gnd |
subject_GND | (DE-588)4121202-2 (DE-588)4125458-2 (DE-588)4260022-4 (DE-588)4113937-9 |
title | Project portfolio selection in the automotive supplier industry |
title_auth | Project portfolio selection in the automotive supplier industry |
title_exact_search | Project portfolio selection in the automotive supplier industry |
title_full | Project portfolio selection in the automotive supplier industry von Bernhard Lienland |
title_fullStr | Project portfolio selection in the automotive supplier industry von Bernhard Lienland |
title_full_unstemmed | Project portfolio selection in the automotive supplier industry von Bernhard Lienland |
title_short | Project portfolio selection in the automotive supplier industry |
title_sort | project portfolio selection in the automotive supplier industry |
topic | Entscheidungsprozess (DE-588)4121202-2 gnd Projektauswahl (DE-588)4125458-2 gnd Kraftfahrzeugzulieferindustrie (DE-588)4260022-4 gnd |
topic_facet | Entscheidungsprozess Projektauswahl Kraftfahrzeugzulieferindustrie Hochschulschrift |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027161789&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT lienlandbernhard projectportfolioselectionintheautomotivesupplierindustry |