Ganzheitliche Fabrikplanung: Grundlagen, Vorgehensweise, EDV-Unterstützung
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | German |
Veröffentlicht: |
Berlin [u.a.]
Springer
2013
|
Schlagworte: | |
Online-Zugang: | Inhaltstext Inhaltsverzeichnis |
Beschreibung: | XII, 351 S. Ill., graph. Darst. |
ISBN: | 9783642325502 3642325505 9783540784029 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV040603273 | ||
003 | DE-604 | ||
005 | 20130527 | ||
007 | t | ||
008 | 121203s2013 gw ad|| |||| 00||| ger d | ||
015 | |a 12,N45 |2 dnb | ||
016 | 7 | |a 1027422438 |2 DE-101 | |
020 | |a 9783642325502 |c Pb. : EUR 49.95 (DE), EUR 51.35 (AT), sfr 62.50 (freier Pr.) |9 978-3-642-32550-2 | ||
020 | |a 3642325505 |9 3-642-32550-5 | ||
020 | |a 9783540784029 |c (Hardcover) |9 978-3-540-78402-9 | ||
024 | 3 | |a 9783642325502 | |
028 | 5 | 2 | |a Best.-Nr.: 86150123 |
035 | |a (OCoLC)825098898 | ||
035 | |a (DE-599)DNB1027422438 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a ger | |
044 | |a gw |c XA-DE-BE | ||
049 | |a DE-703 |a DE-859 |a DE-92 |a DE-29T | ||
082 | 0 | |a 658.5 |2 22/ger | |
084 | |a QP 550 |0 (DE-625)141903: |2 rvk | ||
084 | |a ZG 9220 |0 (DE-625)156051: |2 rvk | ||
084 | |a 620 |2 sdnb | ||
084 | |a 650 |2 sdnb | ||
100 | 1 | |a Pawellek, Günther |e Verfasser |0 (DE-588)135791820 |4 aut | |
245 | 1 | 0 | |a Ganzheitliche Fabrikplanung |b Grundlagen, Vorgehensweise, EDV-Unterstützung |c Günther Pawellek |
264 | 1 | |a Berlin [u.a.] |b Springer |c 2013 | |
300 | |a XII, 351 S. |b Ill., graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
650 | 0 | 7 | |a Fertigungslogistik |0 (DE-588)4214214-3 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fabrikplanung |0 (DE-588)4134388-8 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionssystem |0 (DE-588)4138914-1 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Fabrikplanung |0 (DE-588)4134388-8 |D s |
689 | 0 | 1 | |a Produktionssystem |0 (DE-588)4138914-1 |D s |
689 | 0 | 2 | |a Fertigungslogistik |0 (DE-588)4214214-3 |D s |
689 | 0 | |5 DE-604 | |
856 | 4 | 2 | |m X:MVB |q text/html |u http://deposit.dnb.de/cgi-bin/dokserv?id=4171880&prov=M&dok_var=1&dok_ext=htm |3 Inhaltstext |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025430989&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-025430989 |
Datensatz im Suchindex
_version_ | 1807954458013859840 |
---|---|
adam_text |
IMAGE 1
INHALTSVERZEICHNIS
1 EINFUEHRUNG IN DAS FACHGEBIET 1
1.1 DIE "FABRIK DER ZUKUNFT" 1
1.2 PRODUKTIONSSTRATEGIEN UND FABRIKPLANUNG 2
1.3 FABRIKPLANUNG UND LOGISTIK 6
1.4 NEUE ANFORDERUNGEN AN DIE FABRIKPLANUNG 8
1.5 UEBUNGSFRAGEN ZUM ABSCHNITT 1 10
1.6 LITERATUR ZUM ABSCHNITT 1 11
2 GRUNDLAGEN DER GANZHEITLICHEN FABRIKPLANUNG 13
2.1 INHALT UND UMFANG DER FABRIKPLANUNG 13
2.1.1 ZUM ALLGEMEINEN FABRIKPLANUNGSBEGRIFF 13
2.1.2 GANZHEITLICHE FABRIKPLANUNG 14
2.1.3 PROZESSORIENTIERUNG IN DER FABRIKPLANUNG 16
2.1.4 PLANUNG IM SYSTEMLEBENSZYKLUS 17
2.1.5 GANZHEITLICHE FABRIKPLANUNG IM PRODUKTIONSSYSTEM. 19 2.2
KOMPONENTEN DER GANZHEITLICHEN FABRIKPLANUNG 22
2.2.1 VERNETZTES ZIELSYSTEM 22
2.2.2 ORGANISATIONSSTRUKTUR UND GESTALTUNGSBEREICHE 24 2.2.3
LOESUNGSPRINZIPIEN UND GESTALTUNGSALTERNATIVEN 33 2.2.4 VORGEHENSWEISE
BEI SYSTEMORIENTIERTER PLANUNG 36 2.2.5 RESSOURCEN 38
2.3 ALLGEMEINER PROBLEMLOESUNGSPROZESS 39
2.3.1 VORBEREITUNG DER PLANUNG 40
2.3.2 ERARBEITUNG VON GESTALTUNGSALTERNATIVEN 45
2.4 VORGEHENSMODELLE DER GANZHEITLICHEN FABRIKPLANUNG 50
2.4.1 VORGEHENSRICHTUNG TOP-DOWN ODER BOTTOM-UP 50 2.4.2 PLANUNGSPHASEN
51
2.4.3 SCHRITTE INNERHALB DER STRUKTUR- BZW. SYSTEMPLANUNG. 53 2.4.4
METHODEN UND INSTRUMENTE 55
2.4.5 GESAMTSTRUKTUR BEI FABRIKPLANUNGSPROJEKTEN 55
HTTP://D-NB.INFO/1027422438
IMAGE 2
X
INHALTSVERZEICHNIS
2.5 UEBUNGSFRAGEN ZUM ABSCHNITT 2 59
2.6 LITERATUR ZUM ABSCHNITT 2 60
3 STRATEGIEPLANUNG 63
3.1 AUFGABE DER STRATEGIEPLANUNG 63
3.2 METHODEN UND HILFSMITTEL 65
3.2.1 INNOVATIVE RATIONALISIERUNG 65
3.2.2 TYPISCHE KENNZAHLEN DER FABRIKLOGISTIK 66
3.2.3 STRUKTUR DER LOGISTIKKOSTEN 67
3.3 ENTWICKLUNG EINER INNOVATIONSSTRATEGIE 69
3.3.1 ANSTOSS FUER EIN INNOVATIONSPROGRAMM 69
3.3.2 DATENBASIS UND SCHLUESSELKENNZAHLEN 71
3.3.3 POSITIONS-UND POTENTIALANALYSE 80
3.3.4 ABLEITUNG UND UMSETZUNG EINES INNOVATIONSPROGRAMMS 83
3.3.5 KENNZAHLENGESTUETZTES INNOVATIONSCONTROLLING 86 3.4 ENTWICKLUNG
EINER STANDORTSTRATEGIE 89
3.4.1 ANLASS UND ANFORDERUNGEN 89
3.4.2 ALLGEMEINE STANDORTFAKTOREN 95
3.4.3 SCHRITTE DER STANDORTPLANUNG 97
3.5 ENTWICKLUNG EINER NACHHALTIGKEITSSTRATEGIE 100
3.5.1 FABRIKPLANUNG UND FABRIKOEKOLOGIE 100
3.5.2 AUFBAU EINES UMWELTMANAGEMENTSYSTEMS 102
3.5.3 INTEGRATION DER UMWELTSCHUTZASPEKTE IN DIE FABRIKPLANUNG 106
3.6 UEBUNGSFRAGEN ZUM ABSCHNITT 3 109
3.7 LITERATUR ZUM ABSCHNITT 3 110
4 STRUKTURPLANUNG 115
4.1 AUFGABE DER STRUKTURPLANUNG 115
4.1.1 BEGRIFF "STRUKTURPLANUNG" 115
4.1.2 STRUKTURABHAENGIGKEIT 116
4.1.3 PLANUNGSFALLE 117
4.2 ANSAETZE FUER INNOVATIVE FABRIKSTRUKTUREN 118
4.2.1 ANFORDERUNGEN AN DIE ZUKUENFTIGE FABRIKSTRUKTUR 118 4.2.2
IDEALSTRUKTUR 121
4.2.3 LOGISTIKGERECHTE FABRIKSTRUKTUREN 122
4.2.4 FABRIKSTRUKTUREN UND GEBAEUDE 126
4.3 PLANUNGSSCHRITTE 130
4.3.1 VORGEHENSWEISE 130
4.3.2 ANALYSE DER PLANUNGSELEMENTE 131
4.3.3 IDEALPLANUNG 135
4.3.4 REALPLANUNG 140
4.3.5 DOKUMENTATION 147
IMAGE 3
INHALTSVERZEICHNIS X I
4.4 METHODEN DER LAYOUTPLANUNG 148
4.4.1 ANORDNUNGSOPTIMIERUNG 148
4.4.2 GROBE FLAECHENBEDARFSERMITTLUNG 153
4.4.3 ABLEITUNG IDEAL- UND REAL-LAYOUT 157
4.4.4 FLAECHENKENNZAHLEN 160
4.5 PRAXISBEISPIELE ZUR FABRIKSTRUKTURPLANUNG 163
4.5.1 BEISPIEL: STRUKTURPLANUNG FAHRTREPPENFERTIGUNG 163 4.5.2 BEISPIEL:
STRUKTURPLANUNG HAUSGERAETEFERTIGUNG 167 4.5.3 BEISPIEL: STRUKTURPLANUNG
FERTIGUNG MEDIZINTECHNISCHER GERAETE 168
4.5.4 BEISPIEL: STRUKTURPLANUNG SERIENPUMPENPRODUKTION. 174 4.6
UEBUNGSFRAGEN ZUM ABSCHNITT 4 178
4.7 LITERATUR ZUM ABSCHNITT 4 179
5 SYSTEMPLANUNG 183
5.1 AUFGABE DER SYSTEMPLANUNG 183
5.1.1 BEGRIFF "SYSTEMPLANUNG" 183
5.1.2 ABHAENGIGKEITEN UND ANFORDERUNGEN 184
5.1.3 HERSTELLERNEUTRALE SYSTEMPLANUNG 187
5.2 METHODIK DER SYSTEMPLANUNG 188
5.2.1 BETRACHTUNGSEBENEN 188
5.2.2 PLANUNGSSCHRITTE ALLGEMEIN 189
5.2.3 PLANUNGSTIEFE UND SYSTEMBEISPIELE 192
5.3 FERTIGUNGS- UND MONTAGESYSTEMPLANUNG 197
5.3.1 ANLAESSE UND ANFORDERUNGEN 197
5.3.2 ANPASSUNG DER PRODUKTIONSSYSTEME 198
5.3.3 BEISPIEL: SYSTEMPLANUNG GETRIEBEFERTIGUNG 199
5.3.4 BEISPIEL: SYSTEMPLANUNG ELEKTROMOTORENMONTAGE 204 5.3.5 BEISPIEL:
SYSTEMPLANUNG MONTAGEBEREITSTELLUNG 206 5.4 LAGER-UND
TRANSPORTSYSTEMPLANUNG 209
5.4.1 ANLAESSE UND ANFORDERUNGEN 209
5.4.2 SCHRITTE DER LAGERSYSTEMPLANUNG 214
5.4.3 BEISPIEL: OUTSOURCING DER FERTIGWARENLAGERUNG 220 5.4.4 SCHRITTE
DER TRANSPORTSYSTEMPLANUNG 227
5.4.5 BEISPIEL: AUTOMATISIERUNG VON TRANSPORTEN IN DER MONTAGE 233
5.5 ORGANISATIONSSYSTEMPLANUNG 238
5.5.1 ANLAESSE UND ANFORDERUNGEN 238
5.5.2 SCHRITTE DER ORGANISATIONSSYSTEMPLANUNG 239
5.5.3 PLANUNG DER PRODUKTIONSSTEUERUNG 241
5.6 GEBAEUDESYSTEM-UND INFRASTRUKTURPLANUNG 252
5.6.1 ANLAESSE UND ANFORDERUNGEN 252
5.6.2 SCHRITTE DER BAULICHEN SYSTEMPLANUNG 252
5.7 UEBUNGSFRAGEN ZU VORLESUNGSBAUSTEIN 5 256
5.8 LITERATUR ZUM ABSCHNITT 5 258
IMAGE 4
XI1
INHALTSVERZEICHNIS
6 AUSFIIHRUNGSPLANUNG 261
6.1 AUFGABE DER AUSFUHRUNGSPLANUNG 261
6.2 PLANUNGSSCHRITTE 261
6.2.1 DETAILPLANUNG 262
6.2.2 AUSSCHREIBUNGSVERFAHREN 263
6.2.3 AUSFUHRUNGSUEBERWACHUNG 265
6.3 PROJEKTMANAGEMENT 267
6.3.1 PROJEKTBEGRIFF 267
6.3.2 PROJEKTORGANISATION 268
6.3.3 FUEHRUNGSTECHNIKEN UND -MITTEL 269
6.3.4 WANN SOLLTE PROJEKTMANAGEMENT ANGEWENDET WERDEN? 271
6.4 PERSONALENTWICKLUNG 272
6.5 UEBUNGSFRAGEN ZUM ABSCHNITT 6 273
6.6 LITERATUR ZUM ABSCHNITT 6 274
7 EDV-UNTERSTUETZUNG 275
7.1 NOTWENDIGKEIT, ENTWICKLUNG UND ANFORDERUNGEN 275
7.1.1 NOTWENDIGKEIT UND MOEGLICHKEITEN ZUR PLANUNGSUNTERSTUETZUNG 275
7.1.2 ENTWICKLUNG DER EDV -UNTERSTUETZUNG 276
7.2 EDV-PROGRAMME ALS PLANUNGSHILFSMITTEL 280
7.2.1 EINSATZGEBIETE 280
7.2.2 ZUORDNUNG VON EDV-PROGRAMMEN ZU PLANUNGSPHASEN 282
7.3 WERKZEUGE DER FABRIKPLANUNG 293
7.3.1 SIMULATION 293
7.3.2 FACILITY MANAGEMENT (FM) 306
7.3.3 VIRTUAL REALITY 309
7.3.4 DIGITALE FABRIK 311
7.4 INTEGRIERTE PLANUNGSSYSTEME FUER PRODUKTION UND LOGISTIK 316 7.4.1
PLANUNGSKONZEPT IPPL 316
7.4.2 INTEGRIERTES PRODUKT-UND PROZESSMODELL 319
7.4.3 IPPL-TOOLS 323
7.4.4 DATENINTEGRIERTE LAYOUTPLANUNG 329
7.4.5 METHODEN-MANAGEMENT-SYSTEM MEPORT 331
7.5 ENTWICKLUNGSSTAND UND AUSBLICK 335
7.5.1 STAND DES EDV-EINSATZES BEI DER PLANUNG 335
7.5.2 AUSBLICK 337
7.6 UEBUNGSFRAGEN ZUM ABSCHNITT 7 338
7.7 LITERATUR ZUM ABSCHNITT 7 338
SACHVERZEICHNIS 345 |
any_adam_object | 1 |
author | Pawellek, Günther |
author_GND | (DE-588)135791820 |
author_facet | Pawellek, Günther |
author_role | aut |
author_sort | Pawellek, Günther |
author_variant | g p gp |
building | Verbundindex |
bvnumber | BV040603273 |
classification_rvk | QP 550 ZG 9220 |
ctrlnum | (OCoLC)825098898 (DE-599)DNB1027422438 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Maschinenbau / Maschinenwesen Technik Wirtschaftswissenschaften |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00000nam a2200000 c 4500</leader><controlfield tag="001">BV040603273</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20130527</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">121203s2013 gw ad|| |||| 00||| ger d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">12,N45</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">1027422438</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783642325502</subfield><subfield code="c">Pb. : EUR 49.95 (DE), EUR 51.35 (AT), sfr 62.50 (freier Pr.)</subfield><subfield code="9">978-3-642-32550-2</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3642325505</subfield><subfield code="9">3-642-32550-5</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783540784029</subfield><subfield code="c">(Hardcover)</subfield><subfield code="9">978-3-540-78402-9</subfield></datafield><datafield tag="024" ind1="3" ind2=" "><subfield code="a">9783642325502</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">Best.-Nr.: 86150123</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)825098898</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DNB1027422438</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">ger</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">XA-DE-BE</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield><subfield code="a">DE-859</subfield><subfield code="a">DE-92</subfield><subfield code="a">DE-29T</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">22/ger</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 550</subfield><subfield code="0">(DE-625)141903:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">ZG 9220</subfield><subfield code="0">(DE-625)156051:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">620</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">650</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Pawellek, Günther</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)135791820</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Ganzheitliche Fabrikplanung</subfield><subfield code="b">Grundlagen, Vorgehensweise, EDV-Unterstützung</subfield><subfield code="c">Günther Pawellek</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin [u.a.]</subfield><subfield code="b">Springer</subfield><subfield code="c">2013</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XII, 351 S.</subfield><subfield code="b">Ill., graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungslogistik</subfield><subfield code="0">(DE-588)4214214-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Fertigungslogistik</subfield><subfield code="0">(DE-588)4214214-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">X:MVB</subfield><subfield code="q">text/html</subfield><subfield code="u">http://deposit.dnb.de/cgi-bin/dokserv?id=4171880&prov=M&dok_var=1&dok_ext=htm</subfield><subfield code="3">Inhaltstext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025430989&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-025430989</subfield></datafield></record></collection> |
id | DE-604.BV040603273 |
illustrated | Illustrated |
indexdate | 2024-08-21T00:22:10Z |
institution | BVB |
isbn | 9783642325502 3642325505 9783540784029 |
language | German |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-025430989 |
oclc_num | 825098898 |
open_access_boolean | |
owner | DE-703 DE-859 DE-92 DE-29T |
owner_facet | DE-703 DE-859 DE-92 DE-29T |
physical | XII, 351 S. Ill., graph. Darst. |
publishDate | 2013 |
publishDateSearch | 2013 |
publishDateSort | 2013 |
publisher | Springer |
record_format | marc |
spelling | Pawellek, Günther Verfasser (DE-588)135791820 aut Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung Günther Pawellek Berlin [u.a.] Springer 2013 XII, 351 S. Ill., graph. Darst. txt rdacontent n rdamedia nc rdacarrier Fertigungslogistik (DE-588)4214214-3 gnd rswk-swf Fabrikplanung (DE-588)4134388-8 gnd rswk-swf Produktionssystem (DE-588)4138914-1 gnd rswk-swf Fabrikplanung (DE-588)4134388-8 s Produktionssystem (DE-588)4138914-1 s Fertigungslogistik (DE-588)4214214-3 s DE-604 X:MVB text/html http://deposit.dnb.de/cgi-bin/dokserv?id=4171880&prov=M&dok_var=1&dok_ext=htm Inhaltstext DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025430989&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Pawellek, Günther Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung Fertigungslogistik (DE-588)4214214-3 gnd Fabrikplanung (DE-588)4134388-8 gnd Produktionssystem (DE-588)4138914-1 gnd |
subject_GND | (DE-588)4214214-3 (DE-588)4134388-8 (DE-588)4138914-1 |
title | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung |
title_auth | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung |
title_exact_search | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung |
title_full | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung Günther Pawellek |
title_fullStr | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung Günther Pawellek |
title_full_unstemmed | Ganzheitliche Fabrikplanung Grundlagen, Vorgehensweise, EDV-Unterstützung Günther Pawellek |
title_short | Ganzheitliche Fabrikplanung |
title_sort | ganzheitliche fabrikplanung grundlagen vorgehensweise edv unterstutzung |
title_sub | Grundlagen, Vorgehensweise, EDV-Unterstützung |
topic | Fertigungslogistik (DE-588)4214214-3 gnd Fabrikplanung (DE-588)4134388-8 gnd Produktionssystem (DE-588)4138914-1 gnd |
topic_facet | Fertigungslogistik Fabrikplanung Produktionssystem |
url | http://deposit.dnb.de/cgi-bin/dokserv?id=4171880&prov=M&dok_var=1&dok_ext=htm http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025430989&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT pawellekgunther ganzheitlichefabrikplanunggrundlagenvorgehensweiseedvunterstutzung |