Luethi, M. (2009). Improving the efficiency of heavily used railway networks through integrated real-time rescheduling. ETH, IVT.
Chicago-Zitierstil (17. Ausg.)Luethi, Marco. Improving the Efficiency of Heavily Used Railway Networks Through Integrated Real-time Rescheduling. Zürich: ETH, IVT, 2009.
MLA-Zitierstil (9. Ausg.)Luethi, Marco. Improving the Efficiency of Heavily Used Railway Networks Through Integrated Real-time Rescheduling. ETH, IVT, 2009.
Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.