Reacting to risks with real options: valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Abschlussarbeit Buch |
Sprache: | English |
Veröffentlicht: |
Tilburg
Tilburg University/Faculty of Economics and Business Administation
2009
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis Inhaltsverzeichnis |
Beschreibung: | Zsfassung in niederl. Sprache |
Beschreibung: | 219 S. graph. Darst. |
ISBN: | 9789056682347 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV035770745 | ||
003 | DE-604 | ||
005 | 20091104 | ||
007 | t | ||
008 | 091014s2009 d||| m||| 00||| eng d | ||
020 | |a 9789056682347 |9 978-90-5668-234-7 | ||
035 | |a (OCoLC)552615697 | ||
035 | |a (DE-599)GBV601852087 | ||
040 | |a DE-604 |b ger | ||
041 | 0 | |a eng | |
049 | |a DE-91G | ||
084 | |a DAT 060d |2 stub | ||
084 | |a WIR 554d |2 stub | ||
100 | 1 | |a Hilhorst, Cornelia Alijda Richarda |e Verfasser |4 aut | |
245 | 1 | 0 | |a Reacting to risks with real options |b valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties |c door Cornelia Alijda Richarda Hilhorst |
246 | 1 | 3 | |a Reageren op risico's met reële opties: waardering van managerial flexibiliteit in IT projecten |
246 | 1 | 1 | |a Reageren op risico's met reële opties |
264 | 1 | |a Tilburg |b Tilburg University/Faculty of Economics and Business Administation |c 2009 | |
300 | |a 219 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Zsfassung in niederl. Sprache | ||
502 | |a Zugl.: Tilburg, Univ., Diss., 2009 | ||
650 | 7 | |a Informationstechnik |2 stw | |
650 | 7 | |a Investitionsrisiko |2 stw | |
650 | 7 | |a Niederlande |2 stw | |
650 | 7 | |a Projektmanagement |2 stw | |
650 | 7 | |a Realoption |2 stw | |
650 | 7 | |a Ressourcenorientierter Ansatz |2 stw | |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
856 | 4 | |m DE-601 |q pdf/application |u http://www.gbv.de/dms/zbw/601852087.pdf |z kostenfrei |3 Inhaltsverzeichnis | |
856 | 4 | 2 | |m GBV Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=018630451&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-018630451 |
Datensatz im Suchindex
_version_ | 1804140700363653120 |
---|---|
adam_text | TJBOVERSITEIT * ^ ^ * VAN TLLBURG REACTING TO RISKS WITH REAL OPTIONS:
VALUATION OF MANAGERIAL FLEXIBILITY IN IT PROJECTS B 364395 CONTENTS
PREFACE 5 CHAPTER 1 INTRODUCTION 11 1.1 WHY SHOULD WE STUDY THIS TOPIC?
12 1.2 OVERALL RESEARCH QUESTIONS AND THEORETICAL ISSUES ADDRESSED 14
1.3 RESEARCH CONTRIBUTION OF THE DISSERTATION 16 1.4 IMPLICATIONS FOR
PRACTICE 18 1.5 RESEARCH DESIGN: A MULTIMETHOD MULTILEVEL APPROACH 20
1.6 STRUCTURE OF THE DISSERTATION 23 CHAPTER 2 LITERATURE REVIEW 25 2.1
FLEXIBILITY AS A PRIORITY IN GAINING COMPETITIVE ADVANTAGE 26 2.3 IT
RISKS AND THEORETICAL PERSPECTIVES ON RISK 36 2.4 THE VALUATION OF
MANAGERIAL FLEXIBILITY IN IT PROJECTS USING REAL OPTIONS THEORY 40 2.5
REAL OPTIONS REASONING AND IT RISK MANAGEMENT 49 2.6 DETAILED RESEARCH
QUESTIONS 52 CHAPTER 3 A RESOURCE BASED AND REAL OPTIONS PERSPECTIVE ON
STRATEGIC FLEXIBILITY AND IT INFRASTRUCTURE CAPABILITIES: AN EXPLORATORY
CASE STUDY ANALYSIS 55 3.1 STRATEGIC FLEXIBILITY AND IT INFRASTRUCTURE
INVESTMENTS 56 3.2 THEORETICAL FRAMEWORK 57 3.3 FIELD STUDY 62 3.4
ANALYSIS OF EMPIRICAL FINDINGS 75 3.5 CONCLUSIONS 79 CHAPTER 4 USING
DEMPSTER-SHAFER THEORY AND REAL OPTIONS THEORY TO ASSESS COMPETING
STRATEGIES FOR IMPLEMENTING IT INFRASTRUCTURES: A CASE STUDY 83 4.1
INTRODUCTION 84 4.2 THEORETICAL BACKGROUND 86 4.3 ATTRIBUTES FOR IT
INFRASTRUCTURE STRATEGIES 95 4.4 THE CASE: IMPLEMENTATION OF A HUMAN
RESOURCE MANAGEMENT SYSTEM. 97 4.5 ASSESSMENT OF THE DIFFERENT
IMPLEMENTATION STRATEGIES 103 4.6 DISCUSSION AND CONCLUSION 116 CHAPTER
5 IT PROJECT RISKS AND THE MANAGERIAL VALUATION OF REAL OPTIONS 121 5.1
INTRODUCTION 122 5.2 REAL OPTIONS BASED RISK MANAGEMENT IN IT PROJECTS
125 5.3 RESEARCH MODEL AND HYPOTHESES 132 5.4 RESEARCH METHOD 147 5.5
ANALYSIS AND RESULTS 149 5.6 DISCUSSION 154 5.7 IMPLICATIONS AND
DIRECTIONS FOR FURTHER RESEARCH 158 5.8 CONCLUSION 162 CHAPTER 6
CONCLUSIONS AND RECOMMENDATIONS 163 6.1 SUMMARY OF MAIN FINDINGS 163 6.2
LIMITATIONS OF THE RESEARCH 169 6.3 THEORETICAL CONTRIBUTIONS 172 6.4
MANAGERIAL RELEVANCE 173 6.5 DIRECTIONS FOR FUTURE RESEARCH 177
REFERENCES 181 APPENDIX A: IT INFRASTRUCTURE CAPABILITY CLUSTERS 195
APPENDIX B: THE EVIDENTIAL REASONING ALGORITHM 197 APPENDIX C: PRETEST
EXPERIMENT 199 APPENDIX D: PRETEST IT PROJECT SCENARIO 211 APPENDIX E:
FIELD EXPERIMENT IT PROJECT SCENARIO 213 SAMENVATTING 215 CURRICULUM
VITAE 219
|
any_adam_object | 1 |
author | Hilhorst, Cornelia Alijda Richarda |
author_facet | Hilhorst, Cornelia Alijda Richarda |
author_role | aut |
author_sort | Hilhorst, Cornelia Alijda Richarda |
author_variant | c a r h car carh |
building | Verbundindex |
bvnumber | BV035770745 |
classification_tum | DAT 060d WIR 554d |
ctrlnum | (OCoLC)552615697 (DE-599)GBV601852087 |
discipline | Informatik Wirtschaftswissenschaften |
format | Thesis Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01872nam a2200433 c 4500</leader><controlfield tag="001">BV035770745</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20091104 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">091014s2009 d||| m||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9789056682347</subfield><subfield code="9">978-90-5668-234-7</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)552615697</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBV601852087</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91G</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">DAT 060d</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">WIR 554d</subfield><subfield code="2">stub</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Hilhorst, Cornelia Alijda Richarda</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Reacting to risks with real options</subfield><subfield code="b">valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties</subfield><subfield code="c">door Cornelia Alijda Richarda Hilhorst</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Reageren op risico's met reële opties: waardering van managerial flexibiliteit in IT projecten</subfield></datafield><datafield tag="246" ind1="1" ind2="1"><subfield code="a">Reageren op risico's met reële opties</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Tilburg</subfield><subfield code="b">Tilburg University/Faculty of Economics and Business Administation</subfield><subfield code="c">2009</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">219 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Zsfassung in niederl. Sprache</subfield></datafield><datafield tag="502" ind1=" " ind2=" "><subfield code="a">Zugl.: Tilburg, Univ., Diss., 2009</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Informationstechnik</subfield><subfield code="2">stw</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Investitionsrisiko</subfield><subfield code="2">stw</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Niederlande</subfield><subfield code="2">stw</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Projektmanagement</subfield><subfield code="2">stw</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Realoption</subfield><subfield code="2">stw</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Ressourcenorientierter Ansatz</subfield><subfield code="2">stw</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="856" ind1="4" ind2=" "><subfield code="m">DE-601</subfield><subfield code="q">pdf/application</subfield><subfield code="u">http://www.gbv.de/dms/zbw/601852087.pdf</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">GBV Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=018630451&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-018630451</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV035770745 |
illustrated | Illustrated |
indexdate | 2024-07-09T22:04:09Z |
institution | BVB |
isbn | 9789056682347 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-018630451 |
oclc_num | 552615697 |
open_access_boolean | 1 |
owner | DE-91G DE-BY-TUM |
owner_facet | DE-91G DE-BY-TUM |
physical | 219 S. graph. Darst. |
publishDate | 2009 |
publishDateSearch | 2009 |
publishDateSort | 2009 |
publisher | Tilburg University/Faculty of Economics and Business Administation |
record_format | marc |
spelling | Hilhorst, Cornelia Alijda Richarda Verfasser aut Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties door Cornelia Alijda Richarda Hilhorst Reageren op risico's met reële opties: waardering van managerial flexibiliteit in IT projecten Reageren op risico's met reële opties Tilburg Tilburg University/Faculty of Economics and Business Administation 2009 219 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Zsfassung in niederl. Sprache Zugl.: Tilburg, Univ., Diss., 2009 Informationstechnik stw Investitionsrisiko stw Niederlande stw Projektmanagement stw Realoption stw Ressourcenorientierter Ansatz stw (DE-588)4113937-9 Hochschulschrift gnd-content DE-601 pdf/application http://www.gbv.de/dms/zbw/601852087.pdf kostenfrei Inhaltsverzeichnis GBV Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=018630451&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Hilhorst, Cornelia Alijda Richarda Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties Informationstechnik stw Investitionsrisiko stw Niederlande stw Projektmanagement stw Realoption stw Ressourcenorientierter Ansatz stw |
subject_GND | (DE-588)4113937-9 |
title | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties |
title_alt | Reageren op risico's met reële opties: waardering van managerial flexibiliteit in IT projecten Reageren op risico's met reële opties |
title_auth | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties |
title_exact_search | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties |
title_full | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties door Cornelia Alijda Richarda Hilhorst |
title_fullStr | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties door Cornelia Alijda Richarda Hilhorst |
title_full_unstemmed | Reacting to risks with real options valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties door Cornelia Alijda Richarda Hilhorst |
title_short | Reacting to risks with real options |
title_sort | reacting to risks with real options valuation of managerial flexibility in it projetcs reageren op risico s met reele opties |
title_sub | valuation of managerial flexibility in IT projetcs = Reageren op risico's met reële opties |
topic | Informationstechnik stw Investitionsrisiko stw Niederlande stw Projektmanagement stw Realoption stw Ressourcenorientierter Ansatz stw |
topic_facet | Informationstechnik Investitionsrisiko Niederlande Projektmanagement Realoption Ressourcenorientierter Ansatz Hochschulschrift |
url | http://www.gbv.de/dms/zbw/601852087.pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=018630451&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT hilhorstcorneliaalijdaricharda reactingtoriskswithrealoptionsvaluationofmanagerialflexibilityinitprojetcsreagerenoprisicosmetreeleopties AT hilhorstcorneliaalijdaricharda reagerenoprisicosmetreeleoptieswaarderingvanmanagerialflexibiliteitinitprojecten AT hilhorstcorneliaalijdaricharda reagerenoprisicosmetreeleopties |
Es ist kein Print-Exemplar vorhanden.
Inhaltsverzeichnis