Accuracy of sediment size analyses made by the bottom withdrawal tube method: planned and conducted jointly by Tennessee Valley Authority ...
Gespeichert in:
Format: | Buch |
---|---|
Sprache: | English |
Veröffentlicht: |
Minneapolis, Minn.
St. Anthony Falls Hydraulic Laboratory
1953
|
Schriftenreihe: | Report / Subcommittee on Sedimentation
10 |
Beschreibung: | 115 S. graph. Darst. |
Internformat
MARC
LEADER | 00000nam a2200000 cb4500 | ||
---|---|---|---|
001 | BV024623832 | ||
003 | DE-604 | ||
005 | 20090910 | ||
007 | t | ||
008 | 090924s1953 d||| |||| 00||| eng d | ||
035 | |a (OCoLC)916665357 | ||
035 | |a (DE-599)BVBBV024623832 | ||
040 | |a DE-604 |b ger | ||
041 | 0 | |a eng | |
049 | |a DE-83 | ||
245 | 1 | 0 | |a Accuracy of sediment size analyses made by the bottom withdrawal tube method |b planned and conducted jointly by Tennessee Valley Authority ... |
264 | 1 | |a Minneapolis, Minn. |b St. Anthony Falls Hydraulic Laboratory |c 1953 | |
300 | |a 115 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 1 | |a Report / Subcommittee on Sedimentation |v 10 | |
710 | 2 | |a Tennessee Valley Authority |e Sonstige |0 (DE-588)6299-6 |4 oth | |
810 | 2 | |a United States |p Interagency Committee on Water Resources / Subcommittee on Sedimentation |t Report |v 10 |w (DE-604)BV024623826 |9 10 | |
999 | |a oai:aleph.bib-bvb.de:BVB01-018595698 |
Datensatz im Suchindex
_version_ | 1804140645319704576 |
---|---|
any_adam_object | |
building | Verbundindex |
bvnumber | BV024623832 |
ctrlnum | (OCoLC)916665357 (DE-599)BVBBV024623832 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01003nam a2200265 cb4500</leader><controlfield tag="001">BV024623832</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20090910 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">090924s1953 d||| |||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)916665357</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV024623832</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-83</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Accuracy of sediment size analyses made by the bottom withdrawal tube method</subfield><subfield code="b">planned and conducted jointly by Tennessee Valley Authority ...</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Minneapolis, Minn.</subfield><subfield code="b">St. Anthony Falls Hydraulic Laboratory</subfield><subfield code="c">1953</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">115 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Report / Subcommittee on Sedimentation</subfield><subfield code="v">10</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">Tennessee Valley Authority</subfield><subfield code="e">Sonstige</subfield><subfield code="0">(DE-588)6299-6</subfield><subfield code="4">oth</subfield></datafield><datafield tag="810" ind1="2" ind2=" "><subfield code="a">United States </subfield><subfield code="p">Interagency Committee on Water Resources / Subcommittee on Sedimentation</subfield><subfield code="t">Report</subfield><subfield code="v">10</subfield><subfield code="w">(DE-604)BV024623826</subfield><subfield code="9">10</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-018595698</subfield></datafield></record></collection> |
id | DE-604.BV024623832 |
illustrated | Illustrated |
indexdate | 2024-07-09T22:03:16Z |
institution | BVB |
institution_GND | (DE-588)6299-6 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-018595698 |
oclc_num | 916665357 |
open_access_boolean | |
owner | DE-83 |
owner_facet | DE-83 |
physical | 115 S. graph. Darst. |
publishDate | 1953 |
publishDateSearch | 1953 |
publishDateSort | 1953 |
publisher | St. Anthony Falls Hydraulic Laboratory |
record_format | marc |
series2 | Report / Subcommittee on Sedimentation |
spelling | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... Minneapolis, Minn. St. Anthony Falls Hydraulic Laboratory 1953 115 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Report / Subcommittee on Sedimentation 10 Tennessee Valley Authority Sonstige (DE-588)6299-6 oth United States Interagency Committee on Water Resources / Subcommittee on Sedimentation Report 10 (DE-604)BV024623826 10 |
spellingShingle | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_auth | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_exact_search | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_full | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_fullStr | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_full_unstemmed | Accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by Tennessee Valley Authority ... |
title_short | Accuracy of sediment size analyses made by the bottom withdrawal tube method |
title_sort | accuracy of sediment size analyses made by the bottom withdrawal tube method planned and conducted jointly by tennessee valley authority |
title_sub | planned and conducted jointly by Tennessee Valley Authority ... |
volume_link | (DE-604)BV024623826 |
work_keys_str_mv | AT tennesseevalleyauthority accuracyofsedimentsizeanalysesmadebythebottomwithdrawaltubemethodplannedandconductedjointlybytennesseevalleyauthority |