Scheduling jobs with release times on parallel machines to minimize total tardiness:
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Osnabrück
Fachbereich Mathematik/Informatik, Univ. Osnabrück
2005
|
Schriftenreihe: | Osnabrücker Schriften zur Mathematik
Reihe P, Preprints ; 258 |
Schlagworte: | |
Beschreibung: | 13 S. graph. Darst. |
Internformat
MARC
LEADER | 00000nam a2200000 cb4500 | ||
---|---|---|---|
001 | BV021724604 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 060908s2005 d||| |||| 00||| eng d | ||
035 | |a (OCoLC)254680373 | ||
035 | |a (DE-599)BVBBV021724604 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a eng | |
049 | |a DE-703 | ||
084 | |a 17,1 |2 ssgn | ||
100 | 1 | |a Brucker, Peter |d 1942- |e Verfasser |0 (DE-588)118176757 |4 aut | |
245 | 1 | 0 | |a Scheduling jobs with release times on parallel machines to minimize total tardiness |c Peter Brucker ; Svetlana A. Kravchenko |
264 | 1 | |a Osnabrück |b Fachbereich Mathematik/Informatik, Univ. Osnabrück |c 2005 | |
300 | |a 13 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 1 | |a Osnabrücker Schriften zur Mathematik : Reihe P, Preprints |v 258 | |
650 | 4 | |a Angewandte Mathematik | |
650 | 4 | |a Forschungsbericht | |
700 | 1 | |a Kravčenko, Svetlana A. |e Verfasser |4 aut | |
830 | 0 | |a Osnabrücker Schriften zur Mathematik |v Reihe P, Preprints ; 258 |w (DE-604)BV005632209 |9 258 | |
999 | |a oai:aleph.bib-bvb.de:BVB01-014938225 |
Datensatz im Suchindex
_version_ | 1804135568209084416 |
---|---|
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author | Brucker, Peter 1942- Kravčenko, Svetlana A. |
author_GND | (DE-588)118176757 |
author_facet | Brucker, Peter 1942- Kravčenko, Svetlana A. |
author_role | aut aut |
author_sort | Brucker, Peter 1942- |
author_variant | p b pb s a k sa sak |
building | Verbundindex |
bvnumber | BV021724604 |
ctrlnum | (OCoLC)254680373 (DE-599)BVBBV021724604 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01136nam a2200313 cb4500</leader><controlfield tag="001">BV021724604</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">060908s2005 d||| |||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)254680373</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV021724604</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">17,1</subfield><subfield code="2">ssgn</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Brucker, Peter</subfield><subfield code="d">1942-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)118176757</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Scheduling jobs with release times on parallel machines to minimize total tardiness</subfield><subfield code="c">Peter Brucker ; Svetlana A. Kravchenko</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Osnabrück</subfield><subfield code="b">Fachbereich Mathematik/Informatik, Univ. Osnabrück</subfield><subfield code="c">2005</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">13 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Osnabrücker Schriften zur Mathematik : Reihe P, Preprints</subfield><subfield code="v">258</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Angewandte Mathematik</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Forschungsbericht</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Kravčenko, Svetlana A.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">Osnabrücker Schriften zur Mathematik</subfield><subfield code="v">Reihe P, Preprints ; 258</subfield><subfield code="w">(DE-604)BV005632209</subfield><subfield code="9">258</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-014938225</subfield></datafield></record></collection> |
id | DE-604.BV021724604 |
illustrated | Illustrated |
index_date | 2024-07-02T15:24:24Z |
indexdate | 2024-07-09T20:42:34Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-014938225 |
oclc_num | 254680373 |
open_access_boolean | |
owner | DE-703 |
owner_facet | DE-703 |
physical | 13 S. graph. Darst. |
publishDate | 2005 |
publishDateSearch | 2005 |
publishDateSort | 2005 |
publisher | Fachbereich Mathematik/Informatik, Univ. Osnabrück |
record_format | marc |
series | Osnabrücker Schriften zur Mathematik |
series2 | Osnabrücker Schriften zur Mathematik : Reihe P, Preprints |
spelling | Brucker, Peter 1942- Verfasser (DE-588)118176757 aut Scheduling jobs with release times on parallel machines to minimize total tardiness Peter Brucker ; Svetlana A. Kravchenko Osnabrück Fachbereich Mathematik/Informatik, Univ. Osnabrück 2005 13 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Osnabrücker Schriften zur Mathematik : Reihe P, Preprints 258 Angewandte Mathematik Forschungsbericht Kravčenko, Svetlana A. Verfasser aut Osnabrücker Schriften zur Mathematik Reihe P, Preprints ; 258 (DE-604)BV005632209 258 |
spellingShingle | Brucker, Peter 1942- Kravčenko, Svetlana A. Scheduling jobs with release times on parallel machines to minimize total tardiness Osnabrücker Schriften zur Mathematik Angewandte Mathematik Forschungsbericht |
title | Scheduling jobs with release times on parallel machines to minimize total tardiness |
title_auth | Scheduling jobs with release times on parallel machines to minimize total tardiness |
title_exact_search | Scheduling jobs with release times on parallel machines to minimize total tardiness |
title_exact_search_txtP | Scheduling jobs with release times on parallel machines to minimize total tardiness |
title_full | Scheduling jobs with release times on parallel machines to minimize total tardiness Peter Brucker ; Svetlana A. Kravchenko |
title_fullStr | Scheduling jobs with release times on parallel machines to minimize total tardiness Peter Brucker ; Svetlana A. Kravchenko |
title_full_unstemmed | Scheduling jobs with release times on parallel machines to minimize total tardiness Peter Brucker ; Svetlana A. Kravchenko |
title_short | Scheduling jobs with release times on parallel machines to minimize total tardiness |
title_sort | scheduling jobs with release times on parallel machines to minimize total tardiness |
topic | Angewandte Mathematik Forschungsbericht |
topic_facet | Angewandte Mathematik Forschungsbericht |
volume_link | (DE-604)BV005632209 |
work_keys_str_mv | AT bruckerpeter schedulingjobswithreleasetimesonparallelmachinestominimizetotaltardiness AT kravcenkosvetlanaa schedulingjobswithreleasetimesonparallelmachinestominimizetotaltardiness |