Toyota production system: an integrated approach to just-in-time
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
London u.a.
Inst. of Industrial Engineers ; Chapman & Hall
1994
|
Ausgabe: | 2. ed. |
Schlagworte: | |
Beschreibung: | Literaturverz. S. 407 - 417 |
Beschreibung: | XVII, 423 S. Ill., graph. Darst. |
ISBN: | 0412582201 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV019993695 | ||
003 | DE-604 | ||
005 | 20060425 | ||
007 | t | ||
008 | 050809s1994 ad|| |||| 00||| eng d | ||
020 | |a 0412582201 |9 0-412-58220-1 | ||
035 | |a (OCoLC)32715159 | ||
035 | |a (DE-599)BVBBV019993695 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-M347 |a DE-634 | ||
050 | 0 | |a TL278 | |
050 | 0 | |a TS155 | |
082 | 0 | |a 658.5 |2 20 | |
084 | |a QP 543 |0 (DE-625)141901: |2 rvk | ||
084 | |a QR 524 |0 (DE-625)142043: |2 rvk | ||
100 | 1 | |a Monden, Yasuhiro |d 1940- |e Verfasser |0 (DE-588)12069817X |4 aut | |
245 | 1 | 0 | |a Toyota production system |b an integrated approach to just-in-time |c Yasuhiro Monden |
250 | |a 2. ed. | ||
264 | 1 | |a London u.a. |b Inst. of Industrial Engineers ; Chapman & Hall |c 1994 | |
300 | |a XVII, 423 S. |b Ill., graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Literaturverz. S. 407 - 417 | ||
610 | 2 | 7 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |2 gnd |9 rswk-swf |
650 | 7 | |a Just-in-time-productie |2 gtt | |
650 | 7 | |a Productiesystemen |2 gtt | |
650 | 7 | |a Toyota |2 gtt | |
650 | 4 | |a Automobile industry and trade |x Production control |z Japan | |
650 | 4 | |a Production management |z Japan | |
650 | 4 | |a Toyota automobiles | |
650 | 0 | 7 | |a Lean Production |0 (DE-588)4287302-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigungssystem |0 (DE-588)4154150-9 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |D b |
689 | 0 | 1 | |a Fertigungssystem |0 (DE-588)4154150-9 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |D b |
689 | 1 | 1 | |a Lean Production |0 (DE-588)4287302-2 |D s |
689 | 1 | |8 1\p |5 DE-604 | |
999 | |a oai:aleph.bib-bvb.de:BVB01-013315545 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804133541064212480 |
---|---|
any_adam_object | |
author | Monden, Yasuhiro 1940- |
author_GND | (DE-588)12069817X |
author_facet | Monden, Yasuhiro 1940- |
author_role | aut |
author_sort | Monden, Yasuhiro 1940- |
author_variant | y m ym |
building | Verbundindex |
bvnumber | BV019993695 |
callnumber-first | T - Technology |
callnumber-label | TL278 |
callnumber-raw | TL278 TS155 |
callnumber-search | TL278 TS155 |
callnumber-sort | TL 3278 |
callnumber-subject | TL - Motor Vehicles and Aeronautics |
classification_rvk | QP 543 QR 524 |
ctrlnum | (OCoLC)32715159 (DE-599)BVBBV019993695 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | 2. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01889nam a2200529 c 4500</leader><controlfield tag="001">BV019993695</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20060425 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">050809s1994 ad|| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0412582201</subfield><subfield code="9">0-412-58220-1</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)32715159</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV019993695</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-M347</subfield><subfield code="a">DE-634</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TL278</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS155</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 543</subfield><subfield code="0">(DE-625)141901:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QR 524</subfield><subfield code="0">(DE-625)142043:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Monden, Yasuhiro</subfield><subfield code="d">1940-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)12069817X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Toyota production system</subfield><subfield code="b">an integrated approach to just-in-time</subfield><subfield code="c">Yasuhiro Monden</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">London u.a.</subfield><subfield code="b">Inst. of Industrial Engineers ; Chapman & Hall</subfield><subfield code="c">1994</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XVII, 423 S.</subfield><subfield code="b">Ill., graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Literaturverz. S. 407 - 417</subfield></datafield><datafield tag="610" ind1="2" ind2="7"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Just-in-time-productie</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Productiesystemen</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Toyota</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Automobile industry and trade</subfield><subfield code="x">Production control</subfield><subfield code="z">Japan</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production management</subfield><subfield code="z">Japan</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Toyota automobiles</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="D">b</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="D">b</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-013315545</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
id | DE-604.BV019993695 |
illustrated | Illustrated |
indexdate | 2024-07-09T20:10:21Z |
institution | BVB |
isbn | 0412582201 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-013315545 |
oclc_num | 32715159 |
open_access_boolean | |
owner | DE-M347 DE-634 |
owner_facet | DE-M347 DE-634 |
physical | XVII, 423 S. Ill., graph. Darst. |
publishDate | 1994 |
publishDateSearch | 1994 |
publishDateSort | 1994 |
publisher | Inst. of Industrial Engineers ; Chapman & Hall |
record_format | marc |
spelling | Monden, Yasuhiro 1940- Verfasser (DE-588)12069817X aut Toyota production system an integrated approach to just-in-time Yasuhiro Monden 2. ed. London u.a. Inst. of Industrial Engineers ; Chapman & Hall 1994 XVII, 423 S. Ill., graph. Darst. txt rdacontent n rdamedia nc rdacarrier Literaturverz. S. 407 - 417 Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd rswk-swf Just-in-time-productie gtt Productiesystemen gtt Toyota gtt Automobile industry and trade Production control Japan Production management Japan Toyota automobiles Lean Production (DE-588)4287302-2 gnd rswk-swf Fertigungssystem (DE-588)4154150-9 gnd rswk-swf Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 b Fertigungssystem (DE-588)4154150-9 s DE-604 Lean Production (DE-588)4287302-2 s 1\p DE-604 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Monden, Yasuhiro 1940- Toyota production system an integrated approach to just-in-time Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd Just-in-time-productie gtt Productiesystemen gtt Toyota gtt Automobile industry and trade Production control Japan Production management Japan Toyota automobiles Lean Production (DE-588)4287302-2 gnd Fertigungssystem (DE-588)4154150-9 gnd |
subject_GND | (DE-588)136030-9 (DE-588)4287302-2 (DE-588)4154150-9 |
title | Toyota production system an integrated approach to just-in-time |
title_auth | Toyota production system an integrated approach to just-in-time |
title_exact_search | Toyota production system an integrated approach to just-in-time |
title_full | Toyota production system an integrated approach to just-in-time Yasuhiro Monden |
title_fullStr | Toyota production system an integrated approach to just-in-time Yasuhiro Monden |
title_full_unstemmed | Toyota production system an integrated approach to just-in-time Yasuhiro Monden |
title_short | Toyota production system |
title_sort | toyota production system an integrated approach to just in time |
title_sub | an integrated approach to just-in-time |
topic | Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd Just-in-time-productie gtt Productiesystemen gtt Toyota gtt Automobile industry and trade Production control Japan Production management Japan Toyota automobiles Lean Production (DE-588)4287302-2 gnd Fertigungssystem (DE-588)4154150-9 gnd |
topic_facet | Toyota-Jidōsha-Kōgyō-KK Just-in-time-productie Productiesystemen Toyota Automobile industry and trade Production control Japan Production management Japan Toyota automobiles Lean Production Fertigungssystem |
work_keys_str_mv | AT mondenyasuhiro toyotaproductionsystemanintegratedapproachtojustintime |