Gower handbook of project management:
Gespeichert in:
Format: | Buch |
---|---|
Sprache: | English |
Veröffentlicht: |
Aldershot u.a.
Gower
2000
|
Ausgabe: | 3. ed. |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | Previous ed. ed. by Dennis Lock |
Beschreibung: | XXXVI, 847 S. graph. Darst. |
ISBN: | 0566081385 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV013918412 | ||
003 | DE-604 | ||
005 | 20010918 | ||
007 | t | ||
008 | 010918s2000 d||| |||| 00||| eng d | ||
020 | |a 0566081385 |9 0-566-08138-5 | ||
035 | |a (OCoLC)42786367 | ||
035 | |a (DE-599)BVBBV013918412 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a eng | |
049 | |a DE-573 | ||
050 | 0 | |a T56.8 | |
082 | 0 | |a 658.4/04 |2 21 | |
084 | |a QP 360 |0 (DE-625)141869: |2 rvk | ||
245 | 1 | 0 | |a Gower handbook of project management |c ed. by Dennis Lock... |
246 | 1 | 3 | |a Handbook of project management |
250 | |a 3. ed. | ||
264 | 1 | |a Aldershot u.a. |b Gower |c 2000 | |
300 | |a XXXVI, 847 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Previous ed. ed. by Dennis Lock | ||
650 | 7 | |a Gestion de projet |2 rasuqam | |
650 | 7 | |a Gestion de projets |2 ram | |
650 | 7 | |a Planification de projets |2 rasuqam | |
650 | 4 | |a Project management | |
650 | 7 | |a Projet de développement |2 rasuqam | |
650 | 4 | |a Project management |v Handbooks, manuals, etc | |
650 | 0 | 7 | |a Projektmanagement |0 (DE-588)4047441-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Vertrag |0 (DE-588)4063270-2 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4143413-4 |a Aufsatzsammlung |2 gnd-content | |
689 | 0 | 0 | |a Projektmanagement |0 (DE-588)4047441-0 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Vertrag |0 (DE-588)4063270-2 |D s |
689 | 1 | |8 1\p |5 DE-604 | |
700 | 1 | |a Turner, Rodney J. |e Sonstige |4 oth | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009523004&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-009523004 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804128761452429312 |
---|---|
adam_text | Contents
List of figures xix
Notes on contributors xxv
Preface xxxv
1 An encyclopaedia for the profession of project management 1
Rodney Turner
Project management as a profession 1
The Body of Knowledge 2
The knowledge areas 8
References and further reading 24
Part I Projects
Introduction to Part I 29
2 Implementing strategy through programmes of projects 33
David Partington
Strategy and projects 34
Challenges of the programme approach 39
Conclusions 45
References and further reading 45
Related topics 46
3 Managing programmes of projects 47
Ruth Murray Webster and Michel Thiry
What is programme management? 47
Projects and programmes: key differences 51
Programme configurations 51
V
GOWER HANDBOOK OF PROJECT MANAGEMENT
How programmes link strategy with projects 53
Programme methods and techniques 56
Conclusions 62
References and further reading 62
Related topics 63
4 Projects and project management 65
Rodney Turner
Projects: the endeavour 66
Project management: the process 69
The levels 71
Additional issues 71
References and further reading 75
Related topics 76
5 Project success and strategy 77
Rodney Turner
Judging project success 78
A strategy for project implementation 80
References and further reading 83
Related topics 84
6 Processes and procedures 85
Richard Pharro
Method 86
BS6079 A Guide to Project Management 88
PRINCE 2 93
ISO 10,006: Guidelines to Quality in Project Management 106
Conclusions 110
References and further reading 111
Related topics 111
7 Information systems for programme management 113
GeoffReiss
Project planning and control tools 114
The differences between programme and project planning 117
A model of the programme planning process 118
A vision of the future 122
vi
CONTENTS
Programme management roles 125
Related topics 130
8 The programme and project support office 131
David Marsh
Implementing a programme or project support office 132
The programme support office 132
The project support office 136
Costs and benefits of the PSO 140
Summary 143
References and further reading 143
Related topics 144
9 Project health checks 145
John Wateridge
Post implementation review 147
Project health check 148
Project health check structure 151
Project audits 152
References and further reading 160
Related topics 160
Part II Context
Introduction to Part II 163
10 Political, economic, social and technical influences PEST 165
Alan Harpham
Terminology and definitions 166
Political 168
Economic 174
Social 176
Technical 180
Conclusions 182
References and further reading 183
Related topics 183
11 Managing the legal context 185
GeoffHaley
Procurement 185
vii
GOWER HANDBOOK OF PROJECT MANAGEMENT
Planning and inquiry 189
Environmental legal 192
Law of tort 199
References and further reading 200
Related topics 200
12 Managing the environment 201
Rodney Turner
Developing an environmental strategy 201
Environmental principles 207
Environmental accounting and costing 209
Environmental impact analysis 210
Obtaining consents 212
References and further reading 214
Related topics 215
13 Projects for shareholder value 217
Rodney Turner
Linking project success, performance and appraisal 218
Shareholder value analysis 219
The generic project 223
Comparison of Zeneca and ICI 227
Conclusions 228
References and further reading 228
Related topics 229
Part III Functions
Introduction to Part III 233
14 Managing scope functionality and value 237
Stephen Sinister
Understanding value 238
Defining functionality and value 240
The value management process 243
Summary 250
References and further reading 250
Related topics 250
viii
CONTENTS
15 Managing scope configuration and work methods 251
Rodney Turner
The four steps of configuration management 252
Change control 257
Configuration management through the life cycle 259
Goal Directed Project Management 260
Managing scope of work 265
References and further reading 266
Related topics 266
16 Managing quality 267
Rodney Turner
Quality in the context of projects 267
A five element model for quality 268
Is quality free? 272
Diagnostic tools for solving quality problems 273
References and further reading 275
Related topics 275
17 Managing organization structure and responsibilities 277
Erling Andersen
External organizational structures 277
Internal organizational structures 282
References and further reading 291
Related topics 292
18 Managing cost 293
Dennis Lock
Cost definitions 293
Principles of cost management 295
Cost estimating 299
Cost budgets 307
Cost monitoring using simple graphs 308
Milestone monitoring 312
Cost reporting based on earned value 316
References and further reading 321
Related topics 321
ix
GOWER HANDBOOK OF PROJECT MANAGEMENT
19 Managing the schedule 323
Dennis Lock
Preparation for scheduling 323
Scheduling the furniture project using a bar chart 327
Activity on arrow critical path networks 330
Precedence networks 335
Creating practical logic 339
Early consideration of resources 342
Network too big? 343
Timescale too long? 344
References and further reading 346
Related topics 347
20 Managing resources 349
Dennis Lock
What resources to schedule 349
Resource scheduling principles 351
The role of critical path networks in resource scheduling 354
Conflict between project time and resource limits 357
Scheduling project resources with a computer 359
Output reports from resource scheduling 364
Some resource timing problems 366
Multiproject scheduling 368
Detailed work scheduling within small departments 371
Benefits 371
References and further reading 373
Related topics 373
21 Managing risk 375
Chris Chapman and Stephen Ward
The risk management process (RMP) 376
Alternative perspectives 390
Conclusions 392
Acknowledgements 393
References and further reading 393
Related topics 394
X
CONTENTS
22 Managing health and safety 395
Jim Pearce
An introduction to occupational health and safety 395
The cost of health and safety 396
Risk assessment 398
Risk control 399
The role of occupational health and safety in project management 403
Safety policy 405
Acknowledgement 409
References and further reading 409
Related topics 410
Appendix 22.1: Legal requirements 411
Appendix 22.2: Personal responsibility 418
Appendix 22.3: Safety practitioner 420
Appendix 22.4: Construction health and safety 423
Part IV Process
Introduction to Part TV 427
23 Managing the project life cycle 431
Chris Dawson
Process model 432
life cycles 434
Project processes 437
Extended process life cycle models 442
Managing the process life cycle 445
Summary 448
References and further reading 448
Related topics 449
24 Managing the project start 451
Roland Gareis
Projects are temporary organizations 452
Objectives of the project start process 453
Timing of the project start process 456
Functions, methods, responsibilities and deliverables of the
project start process 458
xi
GOWER HANDBOOK OF PROJECT MANAGEMENT
Design of the project start process 458
Project start and project type 462
Quality of the project start process 466
Conclusions 466
References and further reading 467
Related topics 467
25 Proposal, initiation and feasibility 469
Stephen Simister
Proposal 471
Initiation 471
The feasibility study 472
Conclusions 477
References and further reading 478
Related topics 478
26 Managing implementation and progress 479
Dennis Lock
Essential framework of progress management 479
Communicating the work programme 482
Starting up 483
Managing progress in the various project functions 485
Higher level progress checks 492
Special priority cases 493
Progress measurement 494
Changes 496
Progress meetings 499
Progress reporting 501
References and further reading 503
Related topics 503
Part V Commercial
Introduction to Part V 507
27 Project appraisal 509
Dennis Lock
The need to consider total costs 509
Cash flow scheduling 512
Appraisal using break even analysis 513
xii
CONTENTS
Discounting methods 515
Project feasibility studies and risk analysis 522
References and further reading 524
Related topics 524
28 Two phase parametric discounting 527
Chris Chapman
A simplified version of the example decision 529
Phase one: parametric approach 530
Phase two: probabilistic approach 535
Conclusions 538
Acknowledgement 539
References and further reading 540
Related topics 540
29 Managing finance 541
Tony Merna
Project finance 542
Financial instruments 547
Financial engineering 550
Financial risk management 551
Conclusions 562
References and further reading 563
Related topics 563
Part VI Contractual
Introduction to Part VI 567
30 Roles and responsibilities in project procurement 571
Nigel Smith
Project procurement 571
Roles and responsibilities in a traditional procurement strategy 572
Roles and responsibilities in alternative procurement strategies 577
Emerging procurement routes 582
Standard terms for project managers 585
Future trends 586
References and further reading 587
Related topics 587
xiii
GOWER HANDBOOK OF PROJECT MANAGEMENT
31 Partnering, benchmarking and alliances 589
Denise Bower and Fotis Skountzos
Background 589
Partnering 590
Benchmarking 603
Incentives and partnering 606
Conclusions 609
References and further reading 610
Related topics 612
32 Contract law 613
Peter Marsh
Contract formation 613
Invalidity factors and frustration 617
Conditions and warranty 618
Related topic 628
33 Contracts and payment structures 629
Peter Marsh
Contract structures 629
The contract price 631
Terms of payment 637
References and further reading 641
Related topics 641
34 Standard forms of contract 643
Stephen Sinister and Rodney Turner
Bespoke versus standard forms of contract 643
Why use standard forms? 644
Summary 646
References and further reading 647
Related topics 647
35 Procurement 649
Peter Baily
Some special characteristics of project purchasing 649
The project purchasing manager 651
Subcontracting 652
The purchasing cycle 653
xiv
CONTENTS
Purchased materials and equipment 657
Amendments to purchase orders 659
Electronic data interchange (EDI) 660
References and further reading 660
Related topics 661
36 Bidding 663
Stephen Simister
Managing the bid process 663
The bid process 664
Main activities in the bid process 665
Post bid review 669
Conclusions 670
References and further reading 670
Related topics 670
37 Managing variations, claims and disputes 673
Peter Marsh
Variations 673
Claims 678
Disputes 681
Adjudication 684
References and further reading 686
Related topics 686
Part VII People
Introduction to Part VII 689
38 Managing human resources in the project based organization 693
Anne Keegan and Rodney Turner
From operations to projects 694
Selection in the project based firm 695
Career development for a changing environment 697
Learning for the individual and for the organization 700
Continuity and change in people management 704
Conclusions 707
References and further reading 707
Related topics 708
XV
GOWER HANDBOOK OF PROJECT MANAGEMENT
39 Project management competences in the project oriented
organization 709
Roland Gareis and Martina Huemann
Strategy, structure and culture of the project oriented organization 709
Project management as a business process of the POO 711
Project management competences of individuals and project teams 712
Project management competences of organizations 714
The pm competence model 714
Benchmarking the organizational pm competence 718
Further development of pm competences in the POO 719
Specific management competences in the POO 720
References and further reading 720
Related topics 721
40 Managing teams: the reality of life 723
Tony Reid
Results through teamworking 724
Practical guidelines 724
Further opportunities for growth 732
References and further reading 739
Related topics 739
41 Managing and leading 741
David Partington
Theories of leadership 743
The trait approach 744
The behavioural approach 746
The contingency approach 748
The visionary approach 751
Conclusions 754
References and further reading 755
42 Managing stakeholders 757
Bill McElroy and Chris Mills
Definitions 757
The stakeholder management process 761
Hints and tips 774
Acknowledgement 775
xvi
CONTENTS
References and further reading 775
Related topics 775
43 Managing conflict, persuasion and negotiation 777
Bob Graham
Avoiding conflict 778
Developing an influence strategy 779
Resolving conflict 786
The power and value of information 788
Conclusions 791
References and further reading 791
Related topics 791
44 Managing culture 793
David Rees
Definitions of culture 794
Culture in business 795
Impact of culture on performance 798
Managing culture in projects 799
Managing cultural integration 802
Managing international cultures 805
Paradigm shift 808
Some conclusions 814
References and further reading 814
45 Managing ethics 817
Alistair Godbold
Ethics and project management 818
Ethics as a differentiator 822
Ethical theory 822
Ethics abroad 826
Practical help 827
Conclusions 828
References and further reading 829
Index 831
xvii
List of figures
1.1 The Project Management Body of Knowledge topic areas and
coverage of several versions 4
1.2 A cascade of development objectives for organizations, and the
role of programmes and projects in their achievement 9
3.1 The change eco cycle 49
3.2 Programmes as the missing link 50
3.3 The programme eco cycle 54
3.4 Actions through the programme life cycle stages 55
3.5 Example of a function breakdown structure (FBS) 57
3.6 The programme review process 60
4.1 The goals and methods matrix 73
5.1 Project success criteria 79
5.2 The seven forces model of project management 81
6.1 The project management process, from inputs to outputs 87
6.2 The BS6079 project management process flow 90
6.3 The PRINCE 2 process model 94
6.4 The PRINCE 2 components 99
7.1 Three (of four) roles of programme management 126
7.2 Aims and responsibilities of the four roles of programme
management 127 9
9.1 Project health check 154 8
9.2 Linking success criteria and success factors 159
10.1 Components of culture 177
10.2 Characteristics and systems of culture 178
10.3 Stakeholders to a project 178
10.4 Stakeholder success criteria 180
12.1 Environmental legislation 203
12.2 Pressures for performance improvement 203
xix
GOWER HANDBOOK OF PROJECT MANAGEMENT
12.3 Input output model of environmental impacts 204
12.4 Sixteen point charter for sustainable development 205
13.1 Shareholder value analysis for Zeneca 222
13.2 Ratios and shareholder value for ten UK FTSE100 companies 223
13.3 Analysis of the generic project for Zeneca 224
13.4 Shareholder value of the generic project and the impact of
variations in project performance 224
13.5 Comparison of the impact of variation in the performance of the
generic project in Zeneca and ICI 227
14.1 How value is increased 241
14.2 The benefits of value management 241
14.3 Hard and soft benefits of value management 242
14.4 How things go wrong report of the National Audit Office
on the construction of the Southampton Oceanography Centre,
4 February 1998 244
14.5 Value management workshops during the project life cycle 245
14.6 Generic outputs for a value management workshop 245
14.7 Value tree for a community health care centre 247
14.8 The need for creative thinking 249
15.1 The configuration management process 253
15.2 The four steps of configuration management 254
15.3 Configuration identification of this book 255
15.4 Example of a change control form 258
15.5 The use of the forms in Goal Directed Project Management 261
15.6 Milestone plan for the warehouse project 262
15.7 Project responsibility chart for the warehouse project 263
15.8 Activity responsibility chart for the warehouse project 264
16.1 Five element model for project quality 269
16.2 The four quadrants of project quality 271
16.3 Cause and effect diagram 274
17.1 Isomorphic team structure 284
17.2 Speciality team structure 286
17.3 Egoless team structure 287
17.4 Surgical team structure 289
17.5 Appropriate team structures at different stages of the project
life cycle 290
17.6 The responsibility chart 290
18.1 A general purpose cost estimating form for manufacturing projects 302
18.2 Cost estimating form for purchased materials where international
transport is invoked 303
XX
LIST OK FIGURES
18.3 Comparison of actual costs against budget using simple
graphs 311
18.4 Comparison of actual costs against budget using milestones 314
18.5 Milestone data measured at Week 28 of the example 315
18.6 Project cost report summary based on earned values 317
19.1 Task list for the furniture project 325
19.2 Bar chart for the furniture project 328
19.3 Linked bar chart for the furniture project 329
19.4 Notation for activity on arrow networks 330
19.5 Arrow diagram for the furniture project 336
19.6 Time analysis data from the furniture project network 337
19.7 Basic notation for precedence networks 338
19.8 Precedence diagram for the furniture project 340
19.9 Complex constraints 341
20.1 Resource aggregation example 352
20.2 The workload of Figure 20.1 after smoothing 353
20.3 Scheduling data for a complex activity 356
20.4 Conflict between project time and resource limits 358
20.5 Time analysis and work to lists compared 365
20.6 Resource usage pattern typical of residual scheduling 370
20.7 Multiproject scheduling: framework for communication and
secure control 372
21.1 A generic risk management process structure (client perspective/
sanction stage initiation) 377
21.2 An example of RMP focus over time (client perspective/
sanction stage initiation) 378
21.3 Risk Management Process (RMP) phase structure flow chart 379
21.4 Risk management process (RMP) phase structure comparisons 380
21.5 The six Ws 381
22.1 A risk assessment technique 400
22.2 The Management Of Health And Safety At Work Regulations 417
22.3 Sections of the Health and Safety at Work Act dealing with
personal responsibility 419
23.1 The melorist model interpretation of the project process 432
23.2 The product life cycle 435
23.3 Projects as part of the product life cycle 437
23.4 Project management processes 438
23.5 Overlapping representation of project management processes in
the life cycle 441
23.6 Level of activity of project management processes 441
XXJ
GOWER HANDBOOK OF PROJECT MANAGEMENT
23.7 Level of activity on product development processes during the
course of a project 442
23.8 An example of a software development process model 444
23.9 Activity network representations 445
23.10 Ordinary activity network presentation of example software
process 447
23.11 GAN representation of example software process 448
24.1 The project management process 452
24.2 Start and end of the project start process 457
24.3 Project start responsibility matrix 459
24.4 Communication forms for the project start process 460
24.5 Agenda for a project start workshop 460
24.6 Agenda and timings for a project start workshop 461
24.7 list of contents of a standard project handbook 463
24.8 Differentiation of project types 464
24.9 Start up and the goals and methods matrix 464
24.10 Results of benchmarking the project start process (example) 467
25.1 A typical four stage project life cycle 469
25.2 A flow chart for early definition of a project 470
26.1 Milestone tracker diagram 487
27.1 Budget proposal for a mini computer investment 510
27.2 Mini computer investment, the reality 511
27.3 Elements of net cash flow scheduling 514
27.4 Cash inflows and outflows for the toll road project 515
27.5 Payback graph for the toll road project 516
27.6 Discount factors for calculating net present values 517
27.7 Net present value calculation for the toll road project 519
27.8 Internal rate of return calculation for the toll road project 521
27.9 Rate of return on investment for the toll road project 521
28.1 Summary parameters as a function of the real discount rate D 533
28.2 Plotting V as a function of D from Figure 28.1 534
29.1 Forms of long term financial instruments 550
30.1 Roles and responsibilities in the project supply chain 573
30.2 Capital expenditure through the project life cycle 579
30.3 Organization structure of a management contract 581
30.4 Dispute resolution steps 584
33.1 Incentives in a cost reimbursable contract for early completion 637
34.1 APM standard terms for the appointment of a project manager 645
34.2 Standard forms of contract produced by the construction and
engineering industries in the UK 646
xxii
LIST OF FIGURES
35.1 Sample job description of a project purchasing manager on a very
large project 651
35.2 Subcontracting procedure for a large project 655
35.3 Example of a bid analysis form 656
36.1 Main activities in the bid process 664
36.2 Typical questions considered in decision to tender at the
pre qualification stage 666
37.1 Factors affecting the cost of a variation 675
39.1 Strategy, structure and culture of the project oriented organization 710
39.2 Role description Project Manager 713
39.3 Maturity levels of the SEI Capability Maturity Model 715
39.4 Spider s web presentation of the organizational pm competence 716
39.5 Maturity scale for the pm subprocesses 717
39.6 Sample question of the pm competence questionnaire 717
39.7 PM benchmarking results regarding the design of project
organizations 718
39.8 Relationships between individual, team and organizational learning 720
40.1 Balance card for project team selection 727
40.2 Focusing on team basics 728
40.3 Goal matrix 729
40.4 SMART(IES) goals 729
40.5 Audit of team effectiveness 733
40.6 Project information board 738
42.1 Stakeholder satisfaction 759
42.2 Stakeholder identification grid 760
42.3 The stakeholder management process 762
42.4 Stakeholder resources 762
42.5 Stakeholders as change agents 763
42.6 An example of a stakeholder register 765
42.7 Stakeholder commitment matrix 767
42.8 Plotting stakeholder knowledge base 769
42.9 Tasks involved in gaining commitment 770
42.10 What affects the stakeholders position? 773
44.1 The iceberg model of inter cultural business analysis 795
44.2 The cultural onion 797
44.3 Role fluency 801
44.4 International mergers, acquisitions and alliances: the failure factor 802
44.5 Audit process for cultural due diligence 803
44.6 The cultural triangle test 804
44.7 Global alliances: managing cultural integration 805
xxiii
44.8 Stakeholder mapping for projects 806
44.9 The Hofstede and Trompenaars cultural dimensions 807
44.10 Country ranking for project management 807
44.11 Conflict handling on international projects 808
44.12 Managing multicultural projects 809
44.13 Mono cultural belief cycle 810
44.14 Cross cultural behaviour/belief cycle 811
44.15 Cultural training and development planning 813
44.16 Transcultural projects training and development strategy
formulation 814
|
any_adam_object | 1 |
building | Verbundindex |
bvnumber | BV013918412 |
callnumber-first | T - Technology |
callnumber-label | T56 |
callnumber-raw | T56.8 |
callnumber-search | T56.8 |
callnumber-sort | T 256.8 |
callnumber-subject | T - General Technology |
classification_rvk | QP 360 |
ctrlnum | (OCoLC)42786367 (DE-599)BVBBV013918412 |
dewey-full | 658.4/04 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.4/04 |
dewey-search | 658.4/04 |
dewey-sort | 3658.4 14 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | 3. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01880nam a2200505 c 4500</leader><controlfield tag="001">BV013918412</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20010918 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">010918s2000 d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0566081385</subfield><subfield code="9">0-566-08138-5</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)42786367</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV013918412</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-573</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">T56.8</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.4/04</subfield><subfield code="2">21</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 360</subfield><subfield code="0">(DE-625)141869:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Gower handbook of project management</subfield><subfield code="c">ed. by Dennis Lock...</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Handbook of project management</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">3. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Aldershot u.a.</subfield><subfield code="b">Gower</subfield><subfield code="c">2000</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XXXVI, 847 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Previous ed. ed. by Dennis Lock</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Gestion de projet</subfield><subfield code="2">rasuqam</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Gestion de projets</subfield><subfield code="2">ram</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Planification de projets</subfield><subfield code="2">rasuqam</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Project management</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Projet de développement</subfield><subfield code="2">rasuqam</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Project management</subfield><subfield code="v">Handbooks, manuals, etc</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Vertrag</subfield><subfield code="0">(DE-588)4063270-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4143413-4</subfield><subfield code="a">Aufsatzsammlung</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Vertrag</subfield><subfield code="0">(DE-588)4063270-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Turner, Rodney J.</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009523004&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-009523004</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
genre | (DE-588)4143413-4 Aufsatzsammlung gnd-content |
genre_facet | Aufsatzsammlung |
id | DE-604.BV013918412 |
illustrated | Illustrated |
indexdate | 2024-07-09T18:54:23Z |
institution | BVB |
isbn | 0566081385 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-009523004 |
oclc_num | 42786367 |
open_access_boolean | |
owner | DE-573 |
owner_facet | DE-573 |
physical | XXXVI, 847 S. graph. Darst. |
publishDate | 2000 |
publishDateSearch | 2000 |
publishDateSort | 2000 |
publisher | Gower |
record_format | marc |
spelling | Gower handbook of project management ed. by Dennis Lock... Handbook of project management 3. ed. Aldershot u.a. Gower 2000 XXXVI, 847 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Previous ed. ed. by Dennis Lock Gestion de projet rasuqam Gestion de projets ram Planification de projets rasuqam Project management Projet de développement rasuqam Project management Handbooks, manuals, etc Projektmanagement (DE-588)4047441-0 gnd rswk-swf Vertrag (DE-588)4063270-2 gnd rswk-swf (DE-588)4143413-4 Aufsatzsammlung gnd-content Projektmanagement (DE-588)4047441-0 s DE-604 Vertrag (DE-588)4063270-2 s 1\p DE-604 Turner, Rodney J. Sonstige oth HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009523004&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Gower handbook of project management Gestion de projet rasuqam Gestion de projets ram Planification de projets rasuqam Project management Projet de développement rasuqam Project management Handbooks, manuals, etc Projektmanagement (DE-588)4047441-0 gnd Vertrag (DE-588)4063270-2 gnd |
subject_GND | (DE-588)4047441-0 (DE-588)4063270-2 (DE-588)4143413-4 |
title | Gower handbook of project management |
title_alt | Handbook of project management |
title_auth | Gower handbook of project management |
title_exact_search | Gower handbook of project management |
title_full | Gower handbook of project management ed. by Dennis Lock... |
title_fullStr | Gower handbook of project management ed. by Dennis Lock... |
title_full_unstemmed | Gower handbook of project management ed. by Dennis Lock... |
title_short | Gower handbook of project management |
title_sort | gower handbook of project management |
topic | Gestion de projet rasuqam Gestion de projets ram Planification de projets rasuqam Project management Projet de développement rasuqam Project management Handbooks, manuals, etc Projektmanagement (DE-588)4047441-0 gnd Vertrag (DE-588)4063270-2 gnd |
topic_facet | Gestion de projet Gestion de projets Planification de projets Project management Projet de développement Project management Handbooks, manuals, etc Projektmanagement Vertrag Aufsatzsammlung |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009523004&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT turnerrodneyj gowerhandbookofprojectmanagement AT turnerrodneyj handbookofprojectmanagement |