Period batch control:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Oxford
Clarendon Press
1996
|
Schriftenreihe: | Oxford series on advanced manufacturing
12 |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | XIV, 262 S. graph. Darst. |
ISBN: | 0198564007 |
Internformat
MARC
LEADER | 00000nam a2200000 cb4500 | ||
---|---|---|---|
001 | BV011749193 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 980204s1996 d||| |||| 00||| eng d | ||
020 | |a 0198564007 |9 0-19-856400-7 | ||
035 | |a (OCoLC)31519926 | ||
035 | |a (DE-599)BVBBV011749193 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-703 | ||
050 | 0 | |a TS157.4 | |
082 | 0 | |a 658.5/6 |2 20 | |
084 | |a ZM 9500 |0 (DE-625)157224: |2 rvk | ||
100 | 1 | |a Burbidge, John L. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Period batch control |c John L. Burbidge |
264 | 1 | |a Oxford |b Clarendon Press |c 1996 | |
300 | |a XIV, 262 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 1 | |a Oxford series on advanced manufacturing |v 12 | |
650 | 4 | |a Just-in-time systems | |
650 | 4 | |a Production control | |
650 | 0 | 7 | |a Produktionskontrolle |0 (DE-588)4175800-6 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Produktionskontrolle |0 (DE-588)4175800-6 |D s |
689 | 0 | |5 DE-604 | |
830 | 0 | |a Oxford series on advanced manufacturing |v 12 |w (DE-604)BV002806301 |9 12 | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007927776&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-007927776 |
Datensatz im Suchindex
_version_ | 1804126292026589184 |
---|---|
adam_text | CONTENTS
PART 1 INTRODUCTION
1 An outline of production control 3
1.1 Introduction 3
1.2 Programming 3
1.3 Flow control or stock base ordering systems 6
1.4 Ordering systems single cycle and multicycle 11
7.5 Just in time or just in case ordering systems 12
1.6 The economic batch quantity 14
1.7 Dispatching 18
1.8 Summary 21
2 The materials flow system and Group Technology 22
2.1 Introduction 22
2.2 Elements of GT 24
2.3 GT stages 25
2.4 The advantages of GT 29
2.5 Planning the division into groups and families 29
2.6 FFA and GA 31
2.7 Assembly groups 34
2.8 Materials transfer between GT component processing and
assembly groups 36
2.9 Total Group Technology 41
2.10 Summary 41
3 The production control feedback controls 42
3.1 Introduction 42
3.2 Systems theory 43
3.3 Connectance 44
3.4 The design of the system 46
5.5 Progressing 47
3.6 Loading 53
3.7 Summary 55
4 Stocks 57
4.1 Introduction 57
4.2 Stocks 57
4.3 Cycle stocks and related variables 60
4.4 Reducing cycle stocks 61
4.5 Buffer stocks 65
4.6 Excess stock 71
4.7 Dynamic changes in stocks 73
4.8 Inventory control 74
4.9 Summary 77
xii CONTENTS
PART 2 PROGRAMMING, ORDERING
AND DISPATCHING WITH PBC
5 The database for PBC 81
5.1 Introduction 81
5.2 The plant list 81
5.3 The list of employees 84
5.4 Process routes 86
5.5 Parts lists 88
5.6 Operation sheets 89
5.7 Lists of suppliers 90
5.8 Lists of customers 90
5.9 Maintaining the accuracy of the database 91
5.10 Summary 93
6 The annual programme for PBC 94
6.1 Introduction 94
6.2 Planning the annual sales programme 97
6.3 The method of statistical forecasting 98
5.4 7 e« fr 98
6.5 Seasonal variations 102
6.6 Product life cycle 104
6.7 Cyclical variations 104
5.# Programme reconciliation 106
6.9 77*e annual production programme 106
6.10 The finished product stock programme 106
6./7 Summary 107
7 Short term or flexible programming for PBC 108
7.1 Introduction 108
7.2 Selecting the programming period 109
7.3 Selecting the programming schedule 109
7.4 Standard assembled products and their programming schedule 111
7.5 Products sold as piece parts 119
7.6 Jobbing products 121
7.7 Short term programming for process industries 122
7.8 The programme meeting 123
7.9 Summary 124
8 Ordering and purchasing with PBC 125
8.1 Introduction 125
8.2 Purchasing 125
8.3 Ordering materials for process and implosive industries 127
8.4 Ordering standards for assembled products 129
#.5 The ordering schedule 129
8.6 Summary 133
9 The time constraints and PBC 135
9.1 Introduction 135
9.2 Capacity and load 136
9.3 Throughput time 139
CONTENTS xiii
9.4 Set up time 143
9.5 The sequence constraint problem 149
9.6 Purchase lead times 151
9.7 Summary 151
10 Dispatching with PBC 152
10.1 Introduction 152
10.2 Setting 153
10.3 Tooling storage and maintenance 156
10.4 Inspection 159
70.5 Materials handling 160
10.6 Plant maintenance 160
10.7 Swarf removal 160
10.8 Good housekeeping 162
70.9 Records 162
70.70 Summary 162
11 Operation scheduling with GT and PBC 163
77.7 Introduction 163
77.2 The scheduling problem 163
77.5 Factors in planning the launch sequence 164
77.4 Factors affecting the reliability of LSS 170
77.5 Planning the component launch sequence for a group 173
11.6 Flexibility with LSS 174
77.7 Summary 175
PART 3 PBC IN PRACTICE
12 PBC for implosive industries 179
72.7 Introduction 179
72.2 The product 179
72.5 The method of manufacture 180
12.4 The annual programme 180
72.5 The short term programmes 180
12.6 Ordering materials 183
12.7 Ordering in other implosive industries 186
12.8 Summary 188
13 PBC in explosive industries 189
75.7 Introduction 189
75.2 The range of products produced 189
75.5 The materials flow system 190
13.4 Planning PBC for the factory 191
75.5 PBC in a machine tool factory 197
75.6 The advantages of PBC 198
75.7 The problems with PBC 198
75.* Summary 199
14 PBC in process and square industries 200
14.1 Introduction 200
74.2 Fixing the capacity and Output levels 200
xiv CONTENTS
14.3 Process industries, seasonal products 202
14.4 A process industry with an even demand 203
14.5 PBC in industries making products with a short shelf life 204
14.6 PBC in square industries 208
14.7 Summary 209
15 PBC in jobbing factories 210
15.1 Introduction 210
15.2 Make ready 210
15.3 Planning PBC for jobbing 211
15.4 Programming 213
15.5 Ordering 214
75.6 Examples from practice 214
15.7 PBC with large one of a kind projects 217
15.8 Summary 217
PART 4 INTRODUCING PBC
16 Introducing PBC 221
16.1 Introduction 221
16.2 Objectives 222
16.3 Preliminary changes 223
16.4 Planning the series of change projects in explosive industries 227
16.5 Planning the change projects in other industries 230
16.6 Summary 231
17 Controlling PBC introduction and operation 232
17.1 Introduction 232
17.2 Control/ing the introduction of PBC 232
17.3 The schedule for introduction 233
17.4 The investment in the change to PBC 235
17.5 Savings and benefits 239
17.6 Control during operation 241
17.7 Summary 241
18 Conclusion 243
18.1 Introduction 243
18.2 The materials flow system 243
18.3 Simplifying production control 245
18.4 Period Batch Control 247
18.5 Economic savings with GT plus PBC 248
18.6 The social benefits of GT and PBC 249
18.7 Conclusion 252
GLOSSARY 253
INDEX 260
|
any_adam_object | 1 |
author | Burbidge, John L. |
author_facet | Burbidge, John L. |
author_role | aut |
author_sort | Burbidge, John L. |
author_variant | j l b jl jlb |
building | Verbundindex |
bvnumber | BV011749193 |
callnumber-first | T - Technology |
callnumber-label | TS157 |
callnumber-raw | TS157.4 |
callnumber-search | TS157.4 |
callnumber-sort | TS 3157.4 |
callnumber-subject | TS - Manufactures |
classification_rvk | ZM 9500 |
ctrlnum | (OCoLC)31519926 (DE-599)BVBBV011749193 |
dewey-full | 658.5/6 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5/6 |
dewey-search | 658.5/6 |
dewey-sort | 3658.5 16 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Werkstoffwissenschaften / Fertigungstechnik Wirtschaftswissenschaften |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01408nam a2200385 cb4500</leader><controlfield tag="001">BV011749193</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">980204s1996 d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0198564007</subfield><subfield code="9">0-19-856400-7</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)31519926</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV011749193</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157.4</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/6</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">ZM 9500</subfield><subfield code="0">(DE-625)157224:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Burbidge, John L.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Period batch control</subfield><subfield code="c">John L. Burbidge</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Oxford</subfield><subfield code="b">Clarendon Press</subfield><subfield code="c">1996</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XIV, 262 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Oxford series on advanced manufacturing</subfield><subfield code="v">12</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Just-in-time systems</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionskontrolle</subfield><subfield code="0">(DE-588)4175800-6</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Produktionskontrolle</subfield><subfield code="0">(DE-588)4175800-6</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">Oxford series on advanced manufacturing</subfield><subfield code="v">12</subfield><subfield code="w">(DE-604)BV002806301</subfield><subfield code="9">12</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007927776&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-007927776</subfield></datafield></record></collection> |
id | DE-604.BV011749193 |
illustrated | Illustrated |
indexdate | 2024-07-09T18:15:08Z |
institution | BVB |
isbn | 0198564007 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-007927776 |
oclc_num | 31519926 |
open_access_boolean | |
owner | DE-703 |
owner_facet | DE-703 |
physical | XIV, 262 S. graph. Darst. |
publishDate | 1996 |
publishDateSearch | 1996 |
publishDateSort | 1996 |
publisher | Clarendon Press |
record_format | marc |
series | Oxford series on advanced manufacturing |
series2 | Oxford series on advanced manufacturing |
spelling | Burbidge, John L. Verfasser aut Period batch control John L. Burbidge Oxford Clarendon Press 1996 XIV, 262 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Oxford series on advanced manufacturing 12 Just-in-time systems Production control Produktionskontrolle (DE-588)4175800-6 gnd rswk-swf Produktionskontrolle (DE-588)4175800-6 s DE-604 Oxford series on advanced manufacturing 12 (DE-604)BV002806301 12 HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007927776&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Burbidge, John L. Period batch control Oxford series on advanced manufacturing Just-in-time systems Production control Produktionskontrolle (DE-588)4175800-6 gnd |
subject_GND | (DE-588)4175800-6 |
title | Period batch control |
title_auth | Period batch control |
title_exact_search | Period batch control |
title_full | Period batch control John L. Burbidge |
title_fullStr | Period batch control John L. Burbidge |
title_full_unstemmed | Period batch control John L. Burbidge |
title_short | Period batch control |
title_sort | period batch control |
topic | Just-in-time systems Production control Produktionskontrolle (DE-588)4175800-6 gnd |
topic_facet | Just-in-time systems Production control Produktionskontrolle |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007927776&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
volume_link | (DE-604)BV002806301 |
work_keys_str_mv | AT burbidgejohnl periodbatchcontrol |