Production planning in automated manufacturing:
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Buch |
Sprache: | German |
Veröffentlicht: |
Berlin [u.a.]
Springer
1996
|
Ausgabe: | 2., rev. and enl. ed. |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | Literaturverz. S. 225 - 239 |
Beschreibung: | X, 239 S. graph. Darst. |
ISBN: | 3540613595 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV010885445 | ||
003 | DE-604 | ||
005 | 20020214 | ||
007 | t | ||
008 | 960729s1996 gw d||| |||| 00||| ger d | ||
016 | 7 | |a 947808612 |2 DE-101 | |
020 | |a 3540613595 |9 3-540-61359-5 | ||
035 | |a (OCoLC)35008198 | ||
035 | |a (DE-599)BVBBV010885445 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a ger | |
044 | |a gw |c DE | ||
049 | |a DE-384 |a DE-19 |a DE-12 |a DE-91G |a DE-703 |a DE-521 |a DE-83 |a DE-634 |a DE-188 | ||
050 | 0 | |a TS176.C73 1996 | |
082 | 0 | |a 670.42/7 20 | |
082 | 0 | |a 670.42/7 |2 20 | |
084 | |a QP 505 |0 (DE-625)141895: |2 rvk | ||
084 | |a ZM 9200 |0 (DE-625)159848: |2 rvk | ||
084 | |a 36 |2 sdnb | ||
084 | |a 28 |2 sdnb | ||
084 | |a FER 070f |2 stub | ||
084 | |a 17 |2 sdnb | ||
084 | |a FER 040f |2 stub | ||
100 | 1 | |a Crama, Yves |d 1958- |e Verfasser |0 (DE-588)112187854 |4 aut | |
245 | 1 | 0 | |a Production planning in automated manufacturing |c Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma |
250 | |a 2., rev. and enl. ed. | ||
264 | 1 | |a Berlin [u.a.] |b Springer |c 1996 | |
300 | |a X, 239 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Literaturverz. S. 225 - 239 | ||
650 | 7 | |a Automatisation |2 ram | |
650 | 7 | |a Productieplanning |2 gtt | |
650 | 7 | |a Production - Planification |2 ram | |
650 | 7 | |a Wachttijdproblemen |2 gtt | |
650 | 4 | |a Production planning | |
650 | 4 | |a Automation | |
650 | 0 | 7 | |a PPS |0 (DE-588)4115606-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a CIM |0 (DE-588)4113228-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsplanung |0 (DE-588)4047360-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Mathematische Methode |0 (DE-588)4155620-3 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Automation |0 (DE-588)4003957-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktion |0 (DE-588)4047347-8 |2 gnd |9 rswk-swf |
655 | 7 | |8 1\p |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a CIM |0 (DE-588)4113228-2 |D s |
689 | 0 | 1 | |a PPS |0 (DE-588)4115606-7 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Produktion |0 (DE-588)4047347-8 |D s |
689 | 1 | 1 | |a Automation |0 (DE-588)4003957-2 |D s |
689 | 1 | 2 | |a Produktionsplanung |0 (DE-588)4047360-0 |D s |
689 | 1 | |5 DE-604 | |
689 | 2 | 0 | |a Mathematische Methode |0 (DE-588)4155620-3 |D s |
689 | 2 | |8 2\p |5 DE-604 | |
700 | 1 | |a Oerlemans, Alwin G. |e Verfasser |4 aut | |
700 | 1 | |a Spieksma, Frits C. |e Verfasser |4 aut | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007278994&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-007278994 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
883 | 1 | |8 2\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804125375261835264 |
---|---|
adam_text | Contents
Preface v
Contents vii
1 Automated manufacturing 1
1.1 Introduction 3
1.2 Production planning for FMSs 4
1.2.1 What is an FMS? 4
1.2.2 The hierarchical approach 5
1.2.3 Tactical Planning 7
1.2.4 Operational planning 10
1.3 Overview of the monograph 10
2 Throughput rate optimization in the automated assembly of
printed circuit boards 17
2.1 Introduction 19
2.2 Technological environment 20
2.3 The throughput rate optimization problem 23
2.4 Workload balancing 25
2.4.1 Subproblem (A) 25
2.4.2 Subproblem (B) 29
2.5 Scheduling of individual machines 31
2.5.1 Subproblem (C) 32
2.5.2 Subproblem (D) 34
2.5.3 Subproblem (E) 37
2.5.4 Subproblem (F) 39
2.6 An example 42
viii Contents
3 Approximation algorithms for three dimensional assignment
problems with triangle inequalities 47
3.1 Introduction 49
3.2 Complexity of TA and SA 50
3.3 Approximation algorithms 52
3.4 Computational results 59
4 Scheduling jobs of equal length: complexity, facets and
computational results 63
4.1 Introduction 65
4.2 Complexity of SEL 67
4.3 The LP relaxation of SEL 69
4.4 More facet defining and valid inequalities for SEL 79
4.5 A cutting plane algorithm for SEL 86
5 The tool loading problem: an overview 91
5.1 Introduction 93
5.2 Machine flexibility and tool management 93
5.3 Modeling the magazine capacity constraint 95
5.3.1 A linear model 95
5.3.2 Nonlinear models 97
5.4 Solving the batch selection problem 98
5.5 Grouping of parts and tools 100
5.6 Tool switching 102
6 A column generation approach to job grouping 107
6.1 Introduction 109
6.2 Lower bounds 110
6.2.1 The job grouping problem 110
6.2.2 Column generation 112
6.2.3 The generation subproblem 114
6.2.4 Computation of lower bounds via column generation . 116
6.2.5 Lagrangian relaxation 118
6.2.6 Other lower bounds 120
6.3 Upper bounds 121
6.3.1 Sequential heuristics for grouping 122
6.3.2 Set covering heuristics 123
6.4 Implementation 124
6.5 Computational experiments 127
ix
6.5.1 Generation of problem instances 127
6.5.2 Computational results 129
6.6 Summary and conclusions 137
7 The job grouping problem for flexible manufacturing
systems: some extensions 139
7.1 Introduction 141
7.2 Multiple slots 141
7.2.1 The job grouping problem 141
7.2.2 Lower bounds via column generation 143
7.2.3 Other lower bounds 144
7.2.4 Upper bounds 145
7.2.5 Adjusting the column generation procedure 146
7.2.6 Computational experiments 148
7.2.7 Computational results 149
7.3 Multiple machines 158
7.3.1 The job grouping problem 158
7.3.2 Lower bounds via column generation 158
7.3.3 Other lower bounds 159
7.3.4 Upper bounds 160
7.3.5 Adjusting the column generation procedure 160
7.3.6 Computational experiments 161
7.3.7 Computational results 162
7.4 Other extensions 168
7.5 Summary and conclusions 169
8 A local search approach to job grouping 171
8.1 Introduction 173
8.2 Local search environment 174
8.2.1 Starting solution 175
8.2.2 Objective function 176
8.2.3 Neighbourhood structure 177
8.2.4 Stopping criteria 177
8.3 Local search approaches 178
8.3.1 Simple improvement approach 178
8.3.2 Tabu search approach 178
8.3.3 Simulated annealing approach 179
8.3.4 Variable depth approach 180
8.4 Computational experiments 181
x Contents
8.4.1 The dataset 181
8.4.2 Computational results 183
8.5 Summary and conclusions 188
9 Minimizing the number of tool switches on a flexible
machine 191
9.1 Introduction 193
9.2 Basic results 196
9.2.1 jVP hardness results 196
9.2.2 Finding the minimum number of setups for a fixed job
sequence 198
9.3 Heuristics 202
9.3.1 Traveling salesman heuristics 202
9.3.2 Block minimization heuristics 204
9.3.3 Greedy heuristics 205
9.3.4 Interval heuristic 206
9.3.5 2 Opt strategies 207
9.3.6 Load and Optimize strategy 208
9.4 Computational experiments 209
9.4.1 Generation of problem instances 209
9.4.2 Computational results 210
9.5 Lower bounds 216
9.5.1 Traveling salesman paths 216
9.5.2 Structures implying extra setups 217
9.5.3 Valid inequalities 219
9.5.4 Lagrangian relaxation 220
Appendix: Graph theoretic definitions 222
References 225
|
any_adam_object | 1 |
author | Crama, Yves 1958- Oerlemans, Alwin G. Spieksma, Frits C. |
author_GND | (DE-588)112187854 |
author_facet | Crama, Yves 1958- Oerlemans, Alwin G. Spieksma, Frits C. |
author_role | aut aut aut |
author_sort | Crama, Yves 1958- |
author_variant | y c yc a g o ag ago f c s fc fcs |
building | Verbundindex |
bvnumber | BV010885445 |
callnumber-first | T - Technology |
callnumber-label | TS176 |
callnumber-raw | TS176.C73 1996 |
callnumber-search | TS176.C73 1996 |
callnumber-sort | TS 3176 C73 41996 |
callnumber-subject | TS - Manufactures |
classification_rvk | QP 505 ZM 9200 |
classification_tum | FER 070f FER 040f |
ctrlnum | (OCoLC)35008198 (DE-599)BVBBV010885445 |
dewey-full | 670.42/720 670.42/7 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 670 - Manufacturing |
dewey-raw | 670.42/7 20 670.42/7 |
dewey-search | 670.42/7 20 670.42/7 |
dewey-sort | 3670.42 17 220 |
dewey-tens | 670 - Manufacturing |
discipline | Fertigungstechnik Werkstoffwissenschaften / Fertigungstechnik Wirtschaftswissenschaften |
edition | 2., rev. and enl. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02852nam a2200745 c 4500</leader><controlfield tag="001">BV010885445</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20020214 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">960729s1996 gw d||| |||| 00||| ger d</controlfield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">947808612</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3540613595</subfield><subfield code="9">3-540-61359-5</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)35008198</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV010885445</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">ger</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">DE</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-384</subfield><subfield code="a">DE-19</subfield><subfield code="a">DE-12</subfield><subfield code="a">DE-91G</subfield><subfield code="a">DE-703</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-83</subfield><subfield code="a">DE-634</subfield><subfield code="a">DE-188</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS176.C73 1996</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">670.42/7 20</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">670.42/7</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 505</subfield><subfield code="0">(DE-625)141895:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">ZM 9200</subfield><subfield code="0">(DE-625)159848:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">36</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">28</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">FER 070f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">17</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">FER 040f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Crama, Yves</subfield><subfield code="d">1958-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)112187854</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Production planning in automated manufacturing</subfield><subfield code="c">Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2., rev. and enl. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin [u.a.]</subfield><subfield code="b">Springer</subfield><subfield code="c">1996</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">X, 239 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Literaturverz. S. 225 - 239</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Automatisation</subfield><subfield code="2">ram</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Productieplanning</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Production - Planification</subfield><subfield code="2">ram</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Wachttijdproblemen</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Automation</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">PPS</subfield><subfield code="0">(DE-588)4115606-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">CIM</subfield><subfield code="0">(DE-588)4113228-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Mathematische Methode</subfield><subfield code="0">(DE-588)4155620-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Automation</subfield><subfield code="0">(DE-588)4003957-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktion</subfield><subfield code="0">(DE-588)4047347-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="8">1\p</subfield><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">CIM</subfield><subfield code="0">(DE-588)4113228-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">PPS</subfield><subfield code="0">(DE-588)4115606-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Produktion</subfield><subfield code="0">(DE-588)4047347-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Automation</subfield><subfield code="0">(DE-588)4003957-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="2"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Mathematische Methode</subfield><subfield code="0">(DE-588)4155620-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="8">2\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Oerlemans, Alwin G.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Spieksma, Frits C.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007278994&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-007278994</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">2\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
genre | 1\p (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV010885445 |
illustrated | Illustrated |
indexdate | 2024-07-09T18:00:33Z |
institution | BVB |
isbn | 3540613595 |
language | German |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-007278994 |
oclc_num | 35008198 |
open_access_boolean | |
owner | DE-384 DE-19 DE-BY-UBM DE-12 DE-91G DE-BY-TUM DE-703 DE-521 DE-83 DE-634 DE-188 |
owner_facet | DE-384 DE-19 DE-BY-UBM DE-12 DE-91G DE-BY-TUM DE-703 DE-521 DE-83 DE-634 DE-188 |
physical | X, 239 S. graph. Darst. |
publishDate | 1996 |
publishDateSearch | 1996 |
publishDateSort | 1996 |
publisher | Springer |
record_format | marc |
spelling | Crama, Yves 1958- Verfasser (DE-588)112187854 aut Production planning in automated manufacturing Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma 2., rev. and enl. ed. Berlin [u.a.] Springer 1996 X, 239 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Literaturverz. S. 225 - 239 Automatisation ram Productieplanning gtt Production - Planification ram Wachttijdproblemen gtt Production planning Automation PPS (DE-588)4115606-7 gnd rswk-swf CIM (DE-588)4113228-2 gnd rswk-swf Produktionsplanung (DE-588)4047360-0 gnd rswk-swf Mathematische Methode (DE-588)4155620-3 gnd rswk-swf Automation (DE-588)4003957-2 gnd rswk-swf Produktion (DE-588)4047347-8 gnd rswk-swf 1\p (DE-588)4113937-9 Hochschulschrift gnd-content CIM (DE-588)4113228-2 s PPS (DE-588)4115606-7 s DE-604 Produktion (DE-588)4047347-8 s Automation (DE-588)4003957-2 s Produktionsplanung (DE-588)4047360-0 s Mathematische Methode (DE-588)4155620-3 s 2\p DE-604 Oerlemans, Alwin G. Verfasser aut Spieksma, Frits C. Verfasser aut HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007278994&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk 2\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Crama, Yves 1958- Oerlemans, Alwin G. Spieksma, Frits C. Production planning in automated manufacturing Automatisation ram Productieplanning gtt Production - Planification ram Wachttijdproblemen gtt Production planning Automation PPS (DE-588)4115606-7 gnd CIM (DE-588)4113228-2 gnd Produktionsplanung (DE-588)4047360-0 gnd Mathematische Methode (DE-588)4155620-3 gnd Automation (DE-588)4003957-2 gnd Produktion (DE-588)4047347-8 gnd |
subject_GND | (DE-588)4115606-7 (DE-588)4113228-2 (DE-588)4047360-0 (DE-588)4155620-3 (DE-588)4003957-2 (DE-588)4047347-8 (DE-588)4113937-9 |
title | Production planning in automated manufacturing |
title_auth | Production planning in automated manufacturing |
title_exact_search | Production planning in automated manufacturing |
title_full | Production planning in automated manufacturing Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma |
title_fullStr | Production planning in automated manufacturing Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma |
title_full_unstemmed | Production planning in automated manufacturing Yves Crama ; Alwin G. Oerlemans ; Frits C. R. Spieksma |
title_short | Production planning in automated manufacturing |
title_sort | production planning in automated manufacturing |
topic | Automatisation ram Productieplanning gtt Production - Planification ram Wachttijdproblemen gtt Production planning Automation PPS (DE-588)4115606-7 gnd CIM (DE-588)4113228-2 gnd Produktionsplanung (DE-588)4047360-0 gnd Mathematische Methode (DE-588)4155620-3 gnd Automation (DE-588)4003957-2 gnd Produktion (DE-588)4047347-8 gnd |
topic_facet | Automatisation Productieplanning Production - Planification Wachttijdproblemen Production planning Automation PPS CIM Produktionsplanung Mathematische Methode Produktion Hochschulschrift |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=007278994&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT cramayves productionplanninginautomatedmanufacturing AT oerlemansalwing productionplanninginautomatedmanufacturing AT spieksmafritsc productionplanninginautomatedmanufacturing |