Job shop scheduling with stochastic job precedence constraints:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | German |
Veröffentlicht: |
Karlsruhe
Univ.
1995
|
Schriftenreihe: | Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper
448 |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | III, 30 Bl. |
Internformat
MARC
LEADER | 00000nam a2200000 cb4500 | ||
---|---|---|---|
001 | BV010198081 | ||
003 | DE-604 | ||
007 | t | ||
008 | 950526s1995 |||| 00||| gerod | ||
016 | 7 | |a 944424929 |2 DE-101 | |
035 | |a (OCoLC)75567407 | ||
035 | |a (DE-599)BVBBV010198081 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a ger | |
049 | |a DE-12 | ||
084 | |a SK 970 |0 (DE-625)143276: |2 rvk | ||
100 | 1 | |a Schneider, Welf G. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Job shop scheduling with stochastic job precedence constraints |c Welf G. Schneider |
264 | 1 | |a Karlsruhe |b Univ. |c 1995 | |
300 | |a III, 30 Bl. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 1 | |a Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper |v 448 | |
650 | 0 | 7 | |a Scheduling |0 (DE-588)4179449-7 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Scheduling |0 (DE-588)4179449-7 |D s |
689 | 0 | |5 DE-604 | |
830 | 0 | |a Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper |v 448 |w (DE-604)BV002806861 |9 448 | |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006776750&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-006776750 |
Datensatz im Suchindex
_version_ | 1807773976758321152 |
---|---|
adam_text |
CONTENTS
1
CLASSICAL
DETERMINISTIC
JOB
SHOP
SCHEDULING
1
1.1
THE
STATIC
JOB
SHOP
MODEL
.
I
1.2
(A|/?|7)-NOTATION
FOR
SCHEDULING
PROBLEMS
.
2
1.3
SCHEDULES
.
3
1.4
THE
JOB
SHOP
'
S
DISJUNCTIVE
GRAPH
REPRESENTATION
.
4
1.5
WAYS
TO
SOLVE
THE
JOB
SHOP
PROBLEM
EXACTLY
.
5
1.6
COMPLEXITY
REFLECTIONS
.
6
1.7
WAYS
TO
SOLVE
THE
JOB
SHOP
PROBLEM
HEURISTICALLY
.
6
1.7.1
GIFFLER-THOMPSON
'
S
HEURISTIC
.
6
1.7.2
THE
SHIFTING
BOTTLENECK
PROCEDURE
(SBP)
OF
ADAMS,
BALAS,
AND
ZAWACK
.
6
1.7.3
OTHER
HEURISTICS
.
7
1.8
REGULAR
PRECEDENCE
CONSTRAINTS
.
7
2
THE
JOB
SHOP
MODEL
WITH
STOCHASTIC
JOB
PRECEDENCE
CONSTRAINTS
-
(J\GEKI\D
~DEG\)
9
2.1
THE
CONCEPT
OF
GERT
NETWORKS
.
9
2.1.1
NODE
TYPES
IN
GERT
NETWORKS
.
10
2.1.2
STOCHASTICS
IN
GERT
NETWORKS
AND
REGULARITY
ASSUMPTIONS
11
2.1.3
ACYCLIC
EOR
NETWORKS
AND
NODE
ACTIVATION
PROBABILITIES
.
13
2.2
JOB
PRECEDENCE
CONSTRAINTS
GIVEN
BY
GERT
NETWORKS
.
13
2.3
JOB
DURATIONS
.
14
2.4
AN
EXAMPLE
IN
MIXED
MODEL
PRODUCTION
.
14
2.5
REMARKS
TO
THE
MODEL
.
15
3
A
WAY
TO
SOLVE
(J\ACYDEOFL,
D
~
DEG\EC
MAL
)
17
3.1
EXTRACTING
A
STOCHASTIC
DISJUNCTIVE
GRAPH
OUT
OF
THE
STOCHAS
TIC
JOB
PRECEDENCE
CONSTRAINTS
.
17
3.2
APPLYING
SHIFTING
BOTTLENECK
PROCEDURE
.
22
3.3
INTERPRETING
THE
SOLUTION
.
22
4
APPLICATIONS
OF
THE
MODEL
AND
DISCUSSION
26
4.1
GENERALIZATION
AND
FORTHCOMING
PROBLEMS
.
26
4.1.1
.
CONCERNING
THE
OBJECTIVE
.
26
4.1.2
.
TO
/3
=
ACYCLGERT,
D
~
DEG
.
27
4.1.3
.
TO
(I
=
ACYCLEOR.,1)
~
GENERAL
.
27
4.1.4
.
TO
=
GERT,
D
~
DEG
OR
GENERAL
.
27
4.2
OTHER
ATTEMPTS
TO
CRACK
THE
NEW
MODEL
.
27
4.3
APPLICATIONS
TO
MIXED
MODEL
PRODUCTION
.
27 |
any_adam_object | 1 |
author | Schneider, Welf G. |
author_facet | Schneider, Welf G. |
author_role | aut |
author_sort | Schneider, Welf G. |
author_variant | w g s wg wgs |
building | Verbundindex |
bvnumber | BV010198081 |
classification_rvk | SK 970 |
ctrlnum | (OCoLC)75567407 (DE-599)BVBBV010198081 |
discipline | Mathematik |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00000nam a2200000 cb4500</leader><controlfield tag="001">BV010198081</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">950526s1995 |||| 00||| gerod</controlfield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">944424929</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)75567407</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV010198081</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">ger</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">SK 970</subfield><subfield code="0">(DE-625)143276:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Schneider, Welf G.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Job shop scheduling with stochastic job precedence constraints</subfield><subfield code="c">Welf G. Schneider</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Karlsruhe</subfield><subfield code="b">Univ.</subfield><subfield code="c">1995</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">III, 30 Bl.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper</subfield><subfield code="v">448</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Scheduling</subfield><subfield code="0">(DE-588)4179449-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Scheduling</subfield><subfield code="0">(DE-588)4179449-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper</subfield><subfield code="v">448</subfield><subfield code="w">(DE-604)BV002806861</subfield><subfield code="9">448</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006776750&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-006776750</subfield></datafield></record></collection> |
id | DE-604.BV010198081 |
illustrated | Not Illustrated |
indexdate | 2024-08-19T00:33:29Z |
institution | BVB |
language | German |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-006776750 |
oclc_num | 75567407 |
open_access_boolean | |
owner | DE-12 |
owner_facet | DE-12 |
physical | III, 30 Bl. |
publishDate | 1995 |
publishDateSearch | 1995 |
publishDateSort | 1995 |
publisher | Univ. |
record_format | marc |
series | Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper |
series2 | Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper |
spelling | Schneider, Welf G. Verfasser aut Job shop scheduling with stochastic job precedence constraints Welf G. Schneider Karlsruhe Univ. 1995 III, 30 Bl. txt rdacontent n rdamedia nc rdacarrier Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper 448 Scheduling (DE-588)4179449-7 gnd rswk-swf Scheduling (DE-588)4179449-7 s DE-604 Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper 448 (DE-604)BV002806861 448 DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006776750&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Schneider, Welf G. Job shop scheduling with stochastic job precedence constraints Institut für Wirtschaftstheorie und Operations-Research <Karlsruhe>: Discussion paper Scheduling (DE-588)4179449-7 gnd |
subject_GND | (DE-588)4179449-7 |
title | Job shop scheduling with stochastic job precedence constraints |
title_auth | Job shop scheduling with stochastic job precedence constraints |
title_exact_search | Job shop scheduling with stochastic job precedence constraints |
title_full | Job shop scheduling with stochastic job precedence constraints Welf G. Schneider |
title_fullStr | Job shop scheduling with stochastic job precedence constraints Welf G. Schneider |
title_full_unstemmed | Job shop scheduling with stochastic job precedence constraints Welf G. Schneider |
title_short | Job shop scheduling with stochastic job precedence constraints |
title_sort | job shop scheduling with stochastic job precedence constraints |
topic | Scheduling (DE-588)4179449-7 gnd |
topic_facet | Scheduling |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006776750&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
volume_link | (DE-604)BV002806861 |
work_keys_str_mv | AT schneiderwelfg jobshopschedulingwithstochasticjobprecedenceconstraints |