Shop floor control systems: from design to implementation
Gespeichert in:
Format: | Buch |
---|---|
Sprache: | English |
Veröffentlicht: |
London u.a.
Chapman & Hall
1991
|
Ausgabe: | 1. ed. |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | XX, 344 S. graph. Darst. |
ISBN: | 0412360403 0442313292 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV009634914 | ||
003 | DE-604 | ||
005 | 20110629 | ||
007 | t | ||
008 | 940609s1991 d||| |||| 00||| eng d | ||
020 | |a 0412360403 |9 0-412-36040-3 | ||
020 | |a 0442313292 |9 0-442-31329-2 | ||
035 | |a (OCoLC)23288015 | ||
035 | |a (DE-599)BVBBV009634914 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-N2 |a DE-83 | ||
050 | 0 | |a TS155.8 | |
082 | 0 | |a 670.42 |2 20 | |
084 | |a QP 542 |0 (DE-625)141900: |2 rvk | ||
245 | 1 | 0 | |a Shop floor control systems |b from design to implementation |c A. Bauer ... |
250 | |a 1. ed. | ||
264 | 1 | |a London u.a. |b Chapman & Hall |c 1991 | |
300 | |a XX, 344 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
650 | 7 | |a Productiemanagement |2 gtt | |
650 | 7 | |a Productieplanning |2 gtt | |
650 | 4 | |a Production control | |
650 | 0 | 7 | |a Werkstattsteuerung |0 (DE-588)4140618-7 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Werkstattsteuerung |0 (DE-588)4140618-7 |D s |
689 | 0 | |5 DE-604 | |
700 | 1 | |a Bauer, Alfred |d 1956- |e Sonstige |0 (DE-588)133553507 |4 oth | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006367393&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-006367393 |
Datensatz im Suchindex
_version_ | 1804123974845595648 |
---|---|
adam_text | CONTENTS
Figures viii
About the authors xi
Acknowledgements xiii
Preface xv
Foreword xix
PART ONE: BACKGROUND TO SHOP FLOOR
CONTROL SYSTEMS
Overview 1
1 A background to shop floor control Systems 3
1.1 Introduction 3
1.2 The Just in Time approach to production management 5
1.3 An overview of requirements planning (MRP and MRP II) 12
1.4 MRP/OPT versus JIT 24
1.5 Guidelines for the development and installation of
production planning and control Systems 25
1.6 An architecture for production planning and control 26
1.7 Conclusions 32
PART TWO: A FUNCTIONAL ARCHITECTURE FOR
SHOP FLOOR CONTROL SYSTEMS
Overview 33
2 An architecture for shop floor control Systems 35
2.1 Introduction 35
2.2 Production Activity Control 36
2.3 Factory coordination 46
2.4 Conclusions 62
v
vj Contents
3 A structured functional model for shop floor control 64
3.1 Introduction 4
3.2 Structured Analysis and Design Technique 65
3.3 Overview of SADT™ model for FC and PAC 70
3.4 A0: Coordinate the factory 74
3.5 AI: Design the production environment 75
3.6 A2: Coordinate the product flow 83
3.7 Conclusions 94
PART THREE: AN INFORMATION TECHNOLOGY
ARCHITECTURE FOR SHOP FLOOR CONTROL
Overview 95
4 An information technology architecture for shop floor control 97
4.1 Introduction 97
4.2 The concepts of a layered architecture 98
4.3 The entities and core Services of the reference architecture 101
4.4 A descriptive summary of Petri nets 108
4.5 A sample protocol of the reference architecture 113
4.6 Conclusions 119
5 Implementation technologies for shop floor control Systems 120
5.1 Introduction 120
5.2 An overview of information technology 121
5.3 Communication Systems 123
5.4 Data management Systems 128
5.5 Processing Systems 136
5.6 User interfaces 140
5.7 The object oriented approach 144
5.8 Conclusions 147
PART FOLR: STATE OF THE ART REVIEW
Overview I49
6 A review of scheduling strategies 151
6.1 Introduction jjj
6 Traditional scheduling approaches 152
6 ^ Modern scheduling approaches 164
6 4 Conclusions jyg
7 A review of production environment design strategies 179
7 1 Introduction j™
7 Product based manufacturing jgO
7 3 Process planning ,gf.
74 Manufacturing System analysis 203
7 5 Conclusions 2O7
Contents vii
PART FIVE: THE IMPLEMENTATION OF
SHOP FLOOR CONTROL SYSTEMS
Overview 209
8 An approach to the implcmenlation of factory
coordination and production activity control Systems 211
8.1 Introduction 211
8.2 Sociotechnical design 212
8.3 The contribution of sociotechnical design to the
implementation of PMS 226
8.4 The environment for Factory Coordination and
Production Activity Control 231
8.5 Conclusions 242
9 A design tool for shop floor control Systems 244
9.1 Introduction 244
9.2 The application generator 245
9.3 The manufacturing database 248
9.4 The rulesbase 252
9.5 The PAC Simulation model 255
9.6 Using the AG in the electronics industry 269
9.7 Conclusions 274
PART SIX: AN IMPLEMENTATION OF
A PAC SYSTEM
Overview 277
10 The environment of the case study 279
10.1 Introduction 279
10.2 The business environment 280
10.3 The production management System environment 283
10.4 The technical and social sub systems 288
10.5 The information technology environment 295
10.6 Conclusions 297
11 Implementation of a PAC System 298
11.1 Introduction 298
11.2 Description of the pilot implementation 299
11.3 Architectural mapping and implementation Software 303
11.4 Lessons and guidelines 308
11.5 Conclusions 312
12 References and further reading 314
12.1 References 314
12.2 Further reading 334
Index 336
|
any_adam_object | 1 |
author_GND | (DE-588)133553507 |
building | Verbundindex |
bvnumber | BV009634914 |
callnumber-first | T - Technology |
callnumber-label | TS155 |
callnumber-raw | TS155.8 |
callnumber-search | TS155.8 |
callnumber-sort | TS 3155.8 |
callnumber-subject | TS - Manufactures |
classification_rvk | QP 542 |
ctrlnum | (OCoLC)23288015 (DE-599)BVBBV009634914 |
dewey-full | 670.42 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 670 - Manufacturing |
dewey-raw | 670.42 |
dewey-search | 670.42 |
dewey-sort | 3670.42 |
dewey-tens | 670 - Manufacturing |
discipline | Werkstoffwissenschaften / Fertigungstechnik Wirtschaftswissenschaften |
edition | 1. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01428nam a2200397 c 4500</leader><controlfield tag="001">BV009634914</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20110629 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">940609s1991 d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0412360403</subfield><subfield code="9">0-412-36040-3</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0442313292</subfield><subfield code="9">0-442-31329-2</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)23288015</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV009634914</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-N2</subfield><subfield code="a">DE-83</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS155.8</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">670.42</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Shop floor control systems</subfield><subfield code="b">from design to implementation</subfield><subfield code="c">A. Bauer ...</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">London u.a.</subfield><subfield code="b">Chapman & Hall</subfield><subfield code="c">1991</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XX, 344 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Productiemanagement</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Productieplanning</subfield><subfield code="2">gtt</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Werkstattsteuerung</subfield><subfield code="0">(DE-588)4140618-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Werkstattsteuerung</subfield><subfield code="0">(DE-588)4140618-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Bauer, Alfred</subfield><subfield code="d">1956-</subfield><subfield code="e">Sonstige</subfield><subfield code="0">(DE-588)133553507</subfield><subfield code="4">oth</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006367393&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-006367393</subfield></datafield></record></collection> |
id | DE-604.BV009634914 |
illustrated | Illustrated |
indexdate | 2024-07-09T17:38:18Z |
institution | BVB |
isbn | 0412360403 0442313292 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-006367393 |
oclc_num | 23288015 |
open_access_boolean | |
owner | DE-N2 DE-83 |
owner_facet | DE-N2 DE-83 |
physical | XX, 344 S. graph. Darst. |
publishDate | 1991 |
publishDateSearch | 1991 |
publishDateSort | 1991 |
publisher | Chapman & Hall |
record_format | marc |
spelling | Shop floor control systems from design to implementation A. Bauer ... 1. ed. London u.a. Chapman & Hall 1991 XX, 344 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Productiemanagement gtt Productieplanning gtt Production control Werkstattsteuerung (DE-588)4140618-7 gnd rswk-swf Werkstattsteuerung (DE-588)4140618-7 s DE-604 Bauer, Alfred 1956- Sonstige (DE-588)133553507 oth HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006367393&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Shop floor control systems from design to implementation Productiemanagement gtt Productieplanning gtt Production control Werkstattsteuerung (DE-588)4140618-7 gnd |
subject_GND | (DE-588)4140618-7 |
title | Shop floor control systems from design to implementation |
title_auth | Shop floor control systems from design to implementation |
title_exact_search | Shop floor control systems from design to implementation |
title_full | Shop floor control systems from design to implementation A. Bauer ... |
title_fullStr | Shop floor control systems from design to implementation A. Bauer ... |
title_full_unstemmed | Shop floor control systems from design to implementation A. Bauer ... |
title_short | Shop floor control systems |
title_sort | shop floor control systems from design to implementation |
title_sub | from design to implementation |
topic | Productiemanagement gtt Productieplanning gtt Production control Werkstattsteuerung (DE-588)4140618-7 gnd |
topic_facet | Productiemanagement Productieplanning Production control Werkstattsteuerung |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006367393&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT baueralfred shopfloorcontrolsystemsfromdesigntoimplementation |