The "hub" and "wheel" scheduling problems:
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | |
Sprache: | Undetermined |
Veröffentlicht: |
Brussels
1975
|
Schriftenreihe: | Economics working paper. 1976.
... |
Beschreibung: | European Inst. for Advanced Studies in Management, working paper. 75-18. - Mikrofilm 35 mm |
Internformat
MARC
LEADER | 00000ngm a2200000 ca4500 | ||
---|---|---|---|
001 | BV006854684 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
008 | 930405m1975uuuu ||| 0| znund d | ||
035 | |a (DE-599)BVBBV006854684 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | |a und | ||
100 | 1 | |a Arisawa, Sanji |e Verfasser |4 aut | |
245 | 1 | 0 | |a The "hub" and "wheel" scheduling problems |c Sanji Arisawa ; Salah E. Elmaghraby* |
264 | 1 | |a Brussels |c 1975 | |
490 | 0 | |a Economics working paper. 1976. |v ... | |
500 | |a European Inst. for Advanced Studies in Management, working paper. 75-18. - Mikrofilm 35 mm | ||
700 | 1 | |a Elmaghraby, Salah E. |e Verfasser |4 aut | |
999 | |a oai:aleph.bib-bvb.de:BVB01-012400735 |
Datensatz im Suchindex
_version_ | 1804132279810785280 |
---|---|
any_adam_object | |
author | Arisawa, Sanji Elmaghraby, Salah E. |
author_facet | Arisawa, Sanji Elmaghraby, Salah E. |
author_role | aut aut |
author_sort | Arisawa, Sanji |
author_variant | s a sa s e e se see |
building | Verbundindex |
bvnumber | BV006854684 |
ctrlnum | (DE-599)BVBBV006854684 |
format | Slide |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00689ngm a2200193 ca4500</leader><controlfield tag="001">BV006854684</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="008">930405m1975uuuu ||| 0| znund d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV006854684</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">und</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Arisawa, Sanji</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">The "hub" and "wheel" scheduling problems</subfield><subfield code="c">Sanji Arisawa ; Salah E. Elmaghraby*</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Brussels</subfield><subfield code="c">1975</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Economics working paper. 1976.</subfield><subfield code="v">...</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">European Inst. for Advanced Studies in Management, working paper. 75-18. - Mikrofilm 35 mm</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Elmaghraby, Salah E.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-012400735</subfield></datafield></record></collection> |
id | DE-604.BV006854684 |
illustrated | Not Illustrated |
indexdate | 2024-07-09T19:50:18Z |
institution | BVB |
language | Undetermined |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-012400735 |
open_access_boolean | |
publishDate | 1975 |
publishDateSearch | 1975 |
publishDateSort | 1975 |
record_format | marc |
series2 | Economics working paper. 1976. |
spelling | Arisawa, Sanji Verfasser aut The "hub" and "wheel" scheduling problems Sanji Arisawa ; Salah E. Elmaghraby* Brussels 1975 Economics working paper. 1976. ... European Inst. for Advanced Studies in Management, working paper. 75-18. - Mikrofilm 35 mm Elmaghraby, Salah E. Verfasser aut |
spellingShingle | Arisawa, Sanji Elmaghraby, Salah E. The "hub" and "wheel" scheduling problems |
title | The "hub" and "wheel" scheduling problems |
title_auth | The "hub" and "wheel" scheduling problems |
title_exact_search | The "hub" and "wheel" scheduling problems |
title_full | The "hub" and "wheel" scheduling problems Sanji Arisawa ; Salah E. Elmaghraby* |
title_fullStr | The "hub" and "wheel" scheduling problems Sanji Arisawa ; Salah E. Elmaghraby* |
title_full_unstemmed | The "hub" and "wheel" scheduling problems Sanji Arisawa ; Salah E. Elmaghraby* |
title_short | The "hub" and "wheel" scheduling problems |
title_sort | the hub and wheel scheduling problems |
work_keys_str_mv | AT arisawasanji thehubandwheelschedulingproblems AT elmaghrabysalahe thehubandwheelschedulingproblems |