How to implement Kanban for American industry:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Cambridge, Mass. u.a.
Productivity Pr.
1992
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | X, 116 S. Ill. |
ISBN: | 0963077406 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV005768688 | ||
003 | DE-604 | ||
005 | 20150413 | ||
007 | t | ||
008 | 921106s1992 a||| |||| 00||| engod | ||
020 | |a 0963077406 |9 0-9630774-0-6 | ||
035 | |a (OCoLC)26033205 | ||
035 | |a (DE-599)BVBBV005768688 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-91 | ||
050 | 0 | |a TS157 | |
082 | 0 | |a 658.5/6 |2 20 | |
084 | |a FER 175f |2 stub | ||
084 | |a WIR 775f |2 stub | ||
100 | 1 | |a Louis, Raymond S. |e Verfasser |4 aut | |
245 | 1 | 0 | |a How to implement Kanban for American industry |c Raymond S. Louis |
264 | 1 | |a Cambridge, Mass. u.a. |b Productivity Pr. |c 1992 | |
300 | |a X, 116 S. |b Ill. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
650 | 4 | |a Juste-à-temps (Système) - États-Unis | |
650 | 4 | |a Production - Contrôle | |
650 | 4 | |a Just-in-time systems |z United States | |
650 | 4 | |a Production control | |
650 | 0 | 7 | |a Kanban-System |0 (DE-588)4202406-7 |2 gnd |9 rswk-swf |
651 | 4 | |a USA | |
689 | 0 | 0 | |a Kanban-System |0 (DE-588)4202406-7 |D s |
689 | 0 | |5 DE-604 | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=003603672&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-003603672 |
Datensatz im Suchindex
_version_ | 1804119952315121664 |
---|---|
adam_text | CONTENTS Foreword ix
Preface x
1 Kanban Implementation in America
Climate For Implementation 1
2 Automated Kanban System Overview
Description of the Automated Kanban System 3
Versatility of System 3
Flexibility of System 3
Japanese Basic Container Methodology 4
M.A.S. Container Options 5
Distinction Between Kanban Lot Size and Kanban
Order Quantity 6
Kanban Lot Size Calculation Factors 6
M.A.S. Kanban Lot Size Calculation Process 7
Kanban Order Policy Code 7
Bar Code Reference Number 8
Download Capability 8
Manufacturing Module Overview Single Container 8
Purchasing Module Overview Triple Container 9
Supplier Overview 13
Departments/Positions No Longer In Daily Loop 13
Benefit of the Kanban System 14
3 Kanban Prerequisites
J.I.T. Education Program 15
Load/Mix Smoothing 16
Quick Setup Program 17
Focused Factory/Group Technology Workcell Layout 18
Backflushing/Deduct Point Capability 20
Method Sheets 22
Stockroom Elimination 22
Total Quality Control Program 26
Preventive Maintenance Program 27
Performance Measurements 27
MAS. Capability 28
Deduct Point Identification/Input 28
Download Capability 28
Container Selection 29
Consolidation of Supplier Base 29
Transportation Considerations 30
Supplier Contract 31
4 Container Options and Applications
Container Options 34
Single Container Application 35
Dual Container Application 35
Triple Container Application 36
Multiple Container Application 38
5 System Integration
Blending the MAS. Into the Current Package 39
Computer Fields and Their Functions 39
Order Policy Interface 47
Manufacturing Bar Code Reference File 49
Information Printed on Traveler 50
Initiating the Manufacturing Traveler 50
Purchasing Bar Code Reference File 50
Supplier Download Information 51
Simplistic Version of Electronic Data Interchange 51
6 Purchasing Kanban Calculation
Formula
Make/Buy Code 53
Gross Requirements 53
Weekly Time Buckets 53
ABC Classification 54
Kanban Lot Size Calculation Process 55
Formula Modifiers 55
Final Kanban Lot Size 58
Simulation 61
7 Purchasing Formula Settings
Formula Modifier Settings 64
Impact of Erratic Demand 64
Elements Coordinated with Modifier Settings 66
Average Lot Size Scan Setting 67
Times Factor Settings 68
Lowest Times Factor Setting By ABC Classification 70
Horizon Scan/Percent Over Setting 70
Simulation Code Settings 72
Safety Stock 72
8 Manufacturing Kanban Calculation
Formula and Settings
Purchasing /Manufacturing Similarity 74
Part Type 75
Elements Coordinated With Modifier Settings 76
I Average Lot Size Scan Setting 77
Lowest Times Factor Setting By Part Type 77
Horizon Scan/Percent Over Setting 79
Simulation Code Settings 79
Safety Stock 79
9 Manufacturing Kanban Implementation
i Kanban Prerequisites Implementation Sequence 81
Gradual Implementation Process 82
O.E.M. Kanban Implementation Sequence 82
Supplier Implementation 83
Minimum System Requirements 83
Component Implementation Sequence 83
Manufacturing Order Policy Application 84
Learning Curve 85
Investigation 86
10 Purchasing Kanban Implementation
Importance of the Supplier base 87
O.E.M. s Misconception of Supplier s Role 87
Short Cuts Do Not Work 88
Fabrication/Machine Shop Suppliers Indoctrination 88
Accumulation Affect 90
Benefits Fabrication/Machine Shop Suppliers 90
Distributors Indoctrination/Benefits 90
Kanban Prerequisites Implementation Sequence 90
Timing of Indoctrination/Implementation 91
One Supplier At A Time 91
Key Items to Monitor 91
11 Kanban System Perpetuation
Purchase Orders One Receipt 93
Modified Weight Scale Use 93
Start with Safety Stock 93
NetM.R.P. Report 93
Simulation Exception Report 94
Kanban Container Due Report 95
Vendor Rating Report All Suppliers 95
Capacity Requirements Planning Report 95
Add/Subtract Container Report 95
12 Conclusion
Questions and Answers 100
Closing Statement 104
Appendix
Kanban Lot Size Calculation/Simulation Examples 106
About The Author 112
Index 113
|
any_adam_object | 1 |
author | Louis, Raymond S. |
author_facet | Louis, Raymond S. |
author_role | aut |
author_sort | Louis, Raymond S. |
author_variant | r s l rs rsl |
building | Verbundindex |
bvnumber | BV005768688 |
callnumber-first | T - Technology |
callnumber-label | TS157 |
callnumber-raw | TS157 |
callnumber-search | TS157 |
callnumber-sort | TS 3157 |
callnumber-subject | TS - Manufactures |
classification_tum | FER 175f WIR 775f |
ctrlnum | (OCoLC)26033205 (DE-599)BVBBV005768688 |
dewey-full | 658.5/6 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5/6 |
dewey-search | 658.5/6 |
dewey-sort | 3658.5 16 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Fertigungstechnik Arbeitswissenschaften Wirtschaftswissenschaften |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01422nam a2200409 c 4500</leader><controlfield tag="001">BV005768688</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20150413 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">921106s1992 a||| |||| 00||| engod</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0963077406</subfield><subfield code="9">0-9630774-0-6</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)26033205</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV005768688</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/6</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">FER 175f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">WIR 775f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Louis, Raymond S.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">How to implement Kanban for American industry</subfield><subfield code="c">Raymond S. Louis</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Cambridge, Mass. u.a.</subfield><subfield code="b">Productivity Pr.</subfield><subfield code="c">1992</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">X, 116 S.</subfield><subfield code="b">Ill.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Juste-à-temps (Système) - États-Unis</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production - Contrôle</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Just-in-time systems</subfield><subfield code="z">United States</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kanban-System</subfield><subfield code="0">(DE-588)4202406-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="651" ind1=" " ind2="4"><subfield code="a">USA</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Kanban-System</subfield><subfield code="0">(DE-588)4202406-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=003603672&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-003603672</subfield></datafield></record></collection> |
geographic | USA |
geographic_facet | USA |
id | DE-604.BV005768688 |
illustrated | Illustrated |
indexdate | 2024-07-09T16:34:22Z |
institution | BVB |
isbn | 0963077406 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-003603672 |
oclc_num | 26033205 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
physical | X, 116 S. Ill. |
publishDate | 1992 |
publishDateSearch | 1992 |
publishDateSort | 1992 |
publisher | Productivity Pr. |
record_format | marc |
spelling | Louis, Raymond S. Verfasser aut How to implement Kanban for American industry Raymond S. Louis Cambridge, Mass. u.a. Productivity Pr. 1992 X, 116 S. Ill. txt rdacontent n rdamedia nc rdacarrier Juste-à-temps (Système) - États-Unis Production - Contrôle Just-in-time systems United States Production control Kanban-System (DE-588)4202406-7 gnd rswk-swf USA Kanban-System (DE-588)4202406-7 s DE-604 HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=003603672&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Louis, Raymond S. How to implement Kanban for American industry Juste-à-temps (Système) - États-Unis Production - Contrôle Just-in-time systems United States Production control Kanban-System (DE-588)4202406-7 gnd |
subject_GND | (DE-588)4202406-7 |
title | How to implement Kanban for American industry |
title_auth | How to implement Kanban for American industry |
title_exact_search | How to implement Kanban for American industry |
title_full | How to implement Kanban for American industry Raymond S. Louis |
title_fullStr | How to implement Kanban for American industry Raymond S. Louis |
title_full_unstemmed | How to implement Kanban for American industry Raymond S. Louis |
title_short | How to implement Kanban for American industry |
title_sort | how to implement kanban for american industry |
topic | Juste-à-temps (Système) - États-Unis Production - Contrôle Just-in-time systems United States Production control Kanban-System (DE-588)4202406-7 gnd |
topic_facet | Juste-à-temps (Système) - États-Unis Production - Contrôle Just-in-time systems United States Production control Kanban-System USA |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=003603672&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT louisraymonds howtoimplementkanbanforamericanindustry |