A study of the Toyota production system from an industrial engineering viewpoint:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | Japanese English |
Veröffentlicht: |
Cambridge, Mass. u.a.
Productivity Press
c 1989
|
Ausgabe: | Rev. ed., 4. [printing] |
Schlagworte: | |
Beschreibung: | Aus dem Japan. übers. - Literaturverz. S. 249 - 250 |
Beschreibung: | XXXIV, 257 S.: Ill., graph. Darst. |
ISBN: | 0915299178 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV005594914 | ||
003 | DE-604 | ||
005 | 19921016 | ||
007 | t | ||
008 | 921016s1989 |||| 00||| jpn d | ||
020 | |a 0915299178 |9 0-915299-17-8 | ||
035 | |a (OCoLC)19740349 | ||
035 | |a (DE-599)BVBBV005594914 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a jpn |a eng | |
049 | |a DE-473 | ||
050 | 0 | |a TS157 | |
082 | 0 | |a 658.5 |2 20 | |
084 | |a QP 543 |0 (DE-625)141901: |2 rvk | ||
100 | 1 | |a Shingō, Shigeo |e Verfasser |4 aut | |
240 | 1 | 0 | |a Toyota seisan hōshiki no IE-teki kōsatsu |
245 | 1 | 0 | |a A study of the Toyota production system from an industrial engineering viewpoint |c Shigeo Shingo |
250 | |a Rev. ed., 4. [printing] | ||
264 | 1 | |a Cambridge, Mass. u.a. |b Productivity Press |c c 1989 | |
300 | |a XXXIV, 257 S.: Ill., graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Aus dem Japan. übers. - Literaturverz. S. 249 - 250 | ||
610 | 2 | 4 | |a Toyota Jidōsha Kōgyō Kabushiki Kaisha |
610 | 2 | 7 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |2 gnd |9 rswk-swf |
650 | 7 | |a Administracao Da Producao |2 larpcal | |
650 | 7 | |a Controle Da Producao (Administracao) |2 larpcal | |
650 | 7 | |a Juste à temps (gestion) |2 ram | |
650 | 7 | |a Production - Contrôle |2 ram | |
650 | 4 | |a Just-in-time systems | |
650 | 4 | |a Production control | |
650 | 0 | 7 | |a Just-in-time-Produktion |0 (DE-588)4140040-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigungskontrolle |0 (DE-588)4016901-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Lean Production |0 (DE-588)4287302-2 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionssystem |0 (DE-588)4138914-1 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigungssystem |0 (DE-588)4154150-9 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |D b |
689 | 0 | 1 | |a Fertigungssystem |0 (DE-588)4154150-9 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Fertigungskontrolle |0 (DE-588)4016901-7 |D s |
689 | 1 | 1 | |a Just-in-time-Produktion |0 (DE-588)4140040-9 |D s |
689 | 1 | |5 DE-604 | |
689 | 2 | 0 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |D b |
689 | 2 | 1 | |a Produktionssystem |0 (DE-588)4138914-1 |D s |
689 | 2 | |8 1\p |5 DE-604 | |
689 | 3 | 0 | |a Lean Production |0 (DE-588)4287302-2 |D s |
689 | 3 | 1 | |a Toyota-Jidōsha-Kōgyō-KK |0 (DE-588)136030-9 |D b |
689 | 3 | |8 2\p |5 DE-604 | |
999 | |a oai:aleph.bib-bvb.de:BVB01-003504703 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
883 | 1 | |8 2\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804119808533331968 |
---|---|
any_adam_object | |
author | Shingō, Shigeo |
author_facet | Shingō, Shigeo |
author_role | aut |
author_sort | Shingō, Shigeo |
author_variant | s s ss |
building | Verbundindex |
bvnumber | BV005594914 |
callnumber-first | T - Technology |
callnumber-label | TS157 |
callnumber-raw | TS157 |
callnumber-search | TS157 |
callnumber-sort | TS 3157 |
callnumber-subject | TS - Manufactures |
classification_rvk | QP 543 |
ctrlnum | (OCoLC)19740349 (DE-599)BVBBV005594914 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | Rev. ed., 4. [printing] |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02552nam a2200649 c 4500</leader><controlfield tag="001">BV005594914</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">19921016 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">921016s1989 |||| 00||| jpn d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0915299178</subfield><subfield code="9">0-915299-17-8</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)19740349</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV005594914</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">jpn</subfield><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-473</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 543</subfield><subfield code="0">(DE-625)141901:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Shingō, Shigeo</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="240" ind1="1" ind2="0"><subfield code="a">Toyota seisan hōshiki no IE-teki kōsatsu</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">A study of the Toyota production system from an industrial engineering viewpoint</subfield><subfield code="c">Shigeo Shingo</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">Rev. ed., 4. [printing]</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Cambridge, Mass. u.a.</subfield><subfield code="b">Productivity Press</subfield><subfield code="c">c 1989</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XXXIV, 257 S.: Ill., graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Aus dem Japan. übers. - Literaturverz. S. 249 - 250</subfield></datafield><datafield tag="610" ind1="2" ind2="4"><subfield code="a">Toyota Jidōsha Kōgyō Kabushiki Kaisha</subfield></datafield><datafield tag="610" ind1="2" ind2="7"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Administracao Da Producao</subfield><subfield code="2">larpcal</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Controle Da Producao (Administracao)</subfield><subfield code="2">larpcal</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Juste à temps (gestion)</subfield><subfield code="2">ram</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Production - Contrôle</subfield><subfield code="2">ram</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Just-in-time systems</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Just-in-time-Produktion</subfield><subfield code="0">(DE-588)4140040-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungskontrolle</subfield><subfield code="0">(DE-588)4016901-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="D">b</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Fertigungskontrolle</subfield><subfield code="0">(DE-588)4016901-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Just-in-time-Produktion</subfield><subfield code="0">(DE-588)4140040-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="D">b</subfield></datafield><datafield tag="689" ind1="2" ind2="1"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="3" ind2="0"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2="1"><subfield code="a">Toyota-Jidōsha-Kōgyō-KK</subfield><subfield code="0">(DE-588)136030-9</subfield><subfield code="D">b</subfield></datafield><datafield tag="689" ind1="3" ind2=" "><subfield code="8">2\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-003504703</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">2\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
id | DE-604.BV005594914 |
illustrated | Not Illustrated |
indexdate | 2024-07-09T16:32:05Z |
institution | BVB |
isbn | 0915299178 |
language | Japanese English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-003504703 |
oclc_num | 19740349 |
open_access_boolean | |
owner | DE-473 DE-BY-UBG |
owner_facet | DE-473 DE-BY-UBG |
physical | XXXIV, 257 S.: Ill., graph. Darst. |
publishDate | 1989 |
publishDateSearch | 1989 |
publishDateSort | 1989 |
publisher | Productivity Press |
record_format | marc |
spelling | Shingō, Shigeo Verfasser aut Toyota seisan hōshiki no IE-teki kōsatsu A study of the Toyota production system from an industrial engineering viewpoint Shigeo Shingo Rev. ed., 4. [printing] Cambridge, Mass. u.a. Productivity Press c 1989 XXXIV, 257 S.: Ill., graph. Darst. txt rdacontent n rdamedia nc rdacarrier Aus dem Japan. übers. - Literaturverz. S. 249 - 250 Toyota Jidōsha Kōgyō Kabushiki Kaisha Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd rswk-swf Administracao Da Producao larpcal Controle Da Producao (Administracao) larpcal Juste à temps (gestion) ram Production - Contrôle ram Just-in-time systems Production control Just-in-time-Produktion (DE-588)4140040-9 gnd rswk-swf Fertigungskontrolle (DE-588)4016901-7 gnd rswk-swf Lean Production (DE-588)4287302-2 gnd rswk-swf Produktionssystem (DE-588)4138914-1 gnd rswk-swf Fertigungssystem (DE-588)4154150-9 gnd rswk-swf Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 b Fertigungssystem (DE-588)4154150-9 s DE-604 Fertigungskontrolle (DE-588)4016901-7 s Just-in-time-Produktion (DE-588)4140040-9 s Produktionssystem (DE-588)4138914-1 s 1\p DE-604 Lean Production (DE-588)4287302-2 s 2\p DE-604 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk 2\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Shingō, Shigeo A study of the Toyota production system from an industrial engineering viewpoint Toyota Jidōsha Kōgyō Kabushiki Kaisha Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd Administracao Da Producao larpcal Controle Da Producao (Administracao) larpcal Juste à temps (gestion) ram Production - Contrôle ram Just-in-time systems Production control Just-in-time-Produktion (DE-588)4140040-9 gnd Fertigungskontrolle (DE-588)4016901-7 gnd Lean Production (DE-588)4287302-2 gnd Produktionssystem (DE-588)4138914-1 gnd Fertigungssystem (DE-588)4154150-9 gnd |
subject_GND | (DE-588)136030-9 (DE-588)4140040-9 (DE-588)4016901-7 (DE-588)4287302-2 (DE-588)4138914-1 (DE-588)4154150-9 |
title | A study of the Toyota production system from an industrial engineering viewpoint |
title_alt | Toyota seisan hōshiki no IE-teki kōsatsu |
title_auth | A study of the Toyota production system from an industrial engineering viewpoint |
title_exact_search | A study of the Toyota production system from an industrial engineering viewpoint |
title_full | A study of the Toyota production system from an industrial engineering viewpoint Shigeo Shingo |
title_fullStr | A study of the Toyota production system from an industrial engineering viewpoint Shigeo Shingo |
title_full_unstemmed | A study of the Toyota production system from an industrial engineering viewpoint Shigeo Shingo |
title_short | A study of the Toyota production system from an industrial engineering viewpoint |
title_sort | a study of the toyota production system from an industrial engineering viewpoint |
topic | Toyota Jidōsha Kōgyō Kabushiki Kaisha Toyota-Jidōsha-Kōgyō-KK (DE-588)136030-9 gnd Administracao Da Producao larpcal Controle Da Producao (Administracao) larpcal Juste à temps (gestion) ram Production - Contrôle ram Just-in-time systems Production control Just-in-time-Produktion (DE-588)4140040-9 gnd Fertigungskontrolle (DE-588)4016901-7 gnd Lean Production (DE-588)4287302-2 gnd Produktionssystem (DE-588)4138914-1 gnd Fertigungssystem (DE-588)4154150-9 gnd |
topic_facet | Toyota Jidōsha Kōgyō Kabushiki Kaisha Toyota-Jidōsha-Kōgyō-KK Administracao Da Producao Controle Da Producao (Administracao) Juste à temps (gestion) Production - Contrôle Just-in-time systems Production control Just-in-time-Produktion Fertigungskontrolle Lean Production Produktionssystem Fertigungssystem |
work_keys_str_mv | AT shingoshigeo toyotaseisanhoshikinoietekikosatsu AT shingoshigeo astudyofthetoyotaproductionsystemfromanindustrialengineeringviewpoint |