Sizewelle B public inquiry: report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | Undetermined |
Veröffentlicht: |
London
HMSO
1987
|
Internformat
MARC
LEADER | 00000nam a2200000 cc4500 | ||
---|---|---|---|
001 | BV002351456 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 891002s1987 |||| 00||| und d | ||
035 | |a (OCoLC)630972563 | ||
035 | |a (DE-599)BVBBV002351456 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | |a und | ||
049 | |a DE-91 | ||
100 | 1 | |a Layfield, Frank |e Verfasser |4 aut | |
245 | 1 | 0 | |a Sizewelle B public inquiry |b report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |n 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung |c Insepctor: Frank Layfield |
264 | 1 | |a London |b HMSO |c 1987 | |
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
773 | 0 | 8 | |w (DE-604)BV002351448 |g 8 |
999 | |a oai:aleph.bib-bvb.de:BVB01-001535997 |
Datensatz im Suchindex
_version_ | 1804116796904570880 |
---|---|
any_adam_object | |
author | Layfield, Frank |
author_facet | Layfield, Frank |
author_role | aut |
author_sort | Layfield, Frank |
author_variant | f l fl |
building | Verbundindex |
bvnumber | BV002351456 |
ctrlnum | (OCoLC)630972563 (DE-599)BVBBV002351456 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00855nam a2200241 cc4500</leader><controlfield tag="001">BV002351456</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">891002s1987 |||| 00||| und d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)630972563</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV002351456</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">und</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Layfield, Frank</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Sizewelle B public inquiry</subfield><subfield code="b">report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985</subfield><subfield code="n">8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung</subfield><subfield code="c">Insepctor: Frank Layfield</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">London</subfield><subfield code="b">HMSO</subfield><subfield code="c">1987</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="w">(DE-604)BV002351448</subfield><subfield code="g">8</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-001535997</subfield></datafield></record></collection> |
id | DE-604.BV002351456 |
illustrated | Not Illustrated |
indexdate | 2024-07-09T15:44:12Z |
institution | BVB |
language | Undetermined |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-001535997 |
oclc_num | 630972563 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
publishDate | 1987 |
publishDateSearch | 1987 |
publishDateSort | 1987 |
publisher | HMSO |
record_format | marc |
spelling | Layfield, Frank Verfasser aut Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung Insepctor: Frank Layfield London HMSO 1987 txt rdacontent n rdamedia nc rdacarrier (DE-604)BV002351448 8 |
spellingShingle | Layfield, Frank Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |
title | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |
title_auth | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |
title_exact_search | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |
title_full | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung Insepctor: Frank Layfield |
title_fullStr | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung Insepctor: Frank Layfield |
title_full_unstemmed | Sizewelle B public inquiry report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 8. Glossary, index and appendices. - 1. publ. - 1987. - Getr. Zählung Insepctor: Frank Layfield |
title_short | Sizewelle B public inquiry |
title_sort | sizewelle b public inquiry report on applications consent for the construction of a pressurised water reactor inquiry 11 jan 1983 7 march 1985 |
title_sub | report on applications ... ; consent for the construction of a pressurised water reactor ... ; inquiry 11 Jan. 1983 - 7 March 1985 |
volume_link | (DE-604)BV002351448 |
work_keys_str_mv | AT layfieldfrank sizewellebpublicinquiryreportonapplicationsconsentfortheconstructionofapressurisedwaterreactorinquiry11jan19837march19858glossaryindexandappendices1publ1987getrzahlung |