Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems: final report
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Springfield, Va.
1981
|
Schlagworte: | |
Beschreibung: | XX, 204 S. Ill., graph. Darst. |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV002035987 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 890928s1981 ad|| |||| 00||| eng d | ||
035 | |a (OCoLC)7783447 | ||
035 | |a (DE-599)BVBBV002035987 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-91 | ||
050 | 0 | |a TF241 | |
100 | 1 | |a Hanna, Amir Naoum |e Verfasser |4 aut | |
245 | 1 | 0 | |a Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems |b final report |
246 | 1 | 3 | |a Reportnr. UMTA MA 06,0100 81 4 |
264 | 1 | |a Springfield, Va. |c 1981 | |
300 | |a XX, 204 S. |b Ill., graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
650 | 4 | |a Concrete railroad ties |x Evaluation | |
650 | 4 | |a Railroad tracks |x Evaluation | |
999 | |a oai:aleph.bib-bvb.de:BVB01-001331160 |
Datensatz im Suchindex
_version_ | 1804116486123421696 |
---|---|
any_adam_object | |
author | Hanna, Amir Naoum |
author_facet | Hanna, Amir Naoum |
author_role | aut |
author_sort | Hanna, Amir Naoum |
author_variant | a n h an anh |
building | Verbundindex |
bvnumber | BV002035987 |
callnumber-first | T - Technology |
callnumber-label | TF241 |
callnumber-raw | TF241 |
callnumber-search | TF241 |
callnumber-sort | TF 3241 |
callnumber-subject | TF - Railroad Engineering and Operation |
ctrlnum | (OCoLC)7783447 (DE-599)BVBBV002035987 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00897nam a2200289 c 4500</leader><controlfield tag="001">BV002035987</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">890928s1981 ad|| |||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)7783447</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV002035987</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TF241</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Hanna, Amir Naoum</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems</subfield><subfield code="b">final report</subfield></datafield><datafield tag="246" ind1="1" ind2="3"><subfield code="a">Reportnr. UMTA MA 06,0100 81 4</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Springfield, Va.</subfield><subfield code="c">1981</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XX, 204 S.</subfield><subfield code="b">Ill., graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Concrete railroad ties</subfield><subfield code="x">Evaluation</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Railroad tracks</subfield><subfield code="x">Evaluation</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-001331160</subfield></datafield></record></collection> |
id | DE-604.BV002035987 |
illustrated | Illustrated |
indexdate | 2024-07-09T15:39:16Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-001331160 |
oclc_num | 7783447 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
physical | XX, 204 S. Ill., graph. Darst. |
publishDate | 1981 |
publishDateSearch | 1981 |
publishDateSort | 1981 |
record_format | marc |
spelling | Hanna, Amir Naoum Verfasser aut Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report Reportnr. UMTA MA 06,0100 81 4 Springfield, Va. 1981 XX, 204 S. Ill., graph. Darst. txt rdacontent n rdamedia nc rdacarrier Concrete railroad ties Evaluation Railroad tracks Evaluation |
spellingShingle | Hanna, Amir Naoum Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report Concrete railroad ties Evaluation Railroad tracks Evaluation |
title | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_alt | Reportnr. UMTA MA 06,0100 81 4 |
title_auth | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_exact_search | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_full | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_fullStr | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_full_unstemmed | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems final report |
title_short | Technical and economic feasibility study of at- grade concrete slab track for urban rail transit systems |
title_sort | technical and economic feasibility study of at grade concrete slab track for urban rail transit systems final report |
title_sub | final report |
topic | Concrete railroad ties Evaluation Railroad tracks Evaluation |
topic_facet | Concrete railroad ties Evaluation Railroad tracks Evaluation |
work_keys_str_mv | AT hannaamirnaoum technicalandeconomicfeasibilitystudyofatgradeconcreteslabtrackforurbanrailtransitsystemsfinalreport AT hannaamirnaoum reportnrumtama060100814 |