Construction project management research compendium.: Volume 7 /
Gespeichert in:
Weitere Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
New York :
Nova Science Publishers, Inc.,
[2016]
|
Schlagworte: | |
Online-Zugang: | Volltext |
Beschreibung: | Print version cataloged as a continuing resource by the Library of Congress. |
Beschreibung: | 1 online resource (188 pages) |
ISBN: | 9781634856737 1634856732 |
Internformat
MARC
LEADER | 00000cam a2200000 i 4500 | ||
---|---|---|---|
001 | ZDB-4-EBA-ocn965350173 | ||
003 | OCoLC | ||
005 | 20241004212047.0 | ||
006 | m o d | ||
007 | cr cnu|||unuuu | ||
008 | 161205s2016 nyu o 000 0 eng d | ||
040 | |a YDX |b eng |e rda |e pn |c YDX |d N$T |d EBLCP |d OCLCF |d OCLCO |d OCL |d SNK |d DKU |d IGB |d D6H |d VTS |d AGLDB |d G3B |d S8J |d S9I |d STF |d OCLCQ |d K6U |d OCLCQ |d YDX |d OCLCO |d OCLCQ |d OCLCO |d OCLCL | ||
019 | |a 959980506 | ||
020 | |a 9781634856737 |q (electronic book) | ||
020 | |a 1634856732 |q (electronic book) | ||
020 | |z 9781634856478 | ||
035 | |a (OCoLC)965350173 |z (OCoLC)959980506 | ||
050 | 4 | |a TH438 |b .C66 vol. 7 | |
072 | 7 | |a TEC |x 005000 |2 bisacsh | |
082 | 7 | |a 690.068 |2 23 | |
049 | |a MAIN | ||
245 | 0 | 0 | |a Construction project management research compendium. |n Volume 7 / |c Faisal M. Arain, editor. |
264 | 1 | |a New York : |b Nova Science Publishers, Inc., |c [2016] | |
300 | |a 1 online resource (188 pages) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
347 | |a data file | ||
500 | |a Print version cataloged as a continuing resource by the Library of Congress. | ||
505 | 0 | |a Preface; Fifteen Years of Theory in Project Management: A Review; Abstract; Introduction; Method; Review of Top Five Cited Theories in the PM Literature, 1999-2013; Fuzzy Sets Theory; Theory of Constraints; Actor-Network Theory; Stakeholder Theory; Utility Theory; Discussion; Limitations; Conclusion; References; Impacts of Placement and Work Experience on Construction Education; Abstract; Introduction; Value of Placement in Construction Education; Placement and Academic Performance; Some Methodological Issues; Research Hypotheses; Research Method; Data Source and Description | |
505 | 8 | |a Result and DiscussionConclusion; References; Knowledge Management Practices in Small-Medium Sized Building Firms; Abstract; 1. Introduction; 2. Knowledge Management in the Construction Industry; 3. Research Method; 4. Research Results; 4.1. Understanding of Knowledge Management and Implemented Practices; 4.2. Factors affecting Knowledge Management Practices; 4.3. Knowledge Management Tools; 4.4. Discussion of Findings; Conclusion; About the Authors; References; Knowledge, Attitude and Training; on Preventing Work-Related Musculoskeletal Symptoms; in the Construction Industry; Abstract | |
505 | 8 | |a IntroductionRisk Factors Associated with Musculoskeletal Disorders; Research Methodology; Result and Discussion; Respondents' Background; Knowledge and Attitude on Occupational Health; Employees' Compensation Ordinance; Prevention and Improvement Methods for WMSDs; Conclusion; References; Just-In-Time (JIT) Management in the Ready Mixed Concrete Industry in Singapore; Abstract; Introduction; Explanation of JIT Elements; Field Study; Production Capacities of RMC Suppliers; JIT Implementation Status; Further Study; Conclusion; References; Integration of Quality Measure | |
505 | 8 | |a In Project Control SystemsAbstract; Introduction; Purpose and Objective of Research; Literature Review; Review of Existing Project Control System; Weakness of Existing Project Control System; Existing Measurement on Quality Performance; Summary on Literature Review; Methodology; Validation on Quality Measure; Validation on Integration of Quality Measure; Findings; Findings on Quality Measure; Findings on Integration of Quality Measure; Analysis on Mean Performance; Effectiveness of Proposed Control System; Discussion; Impact of Quality Measure on Existing Project Control System | |
505 | 8 | |a Impact of Quality measure on Project StakeholdersLimitation of MQI Measure; Limitation of PQI; Error in Data Collection; Wastage Allocation Factor; Issuance of Non-conformance Reports (NCRs'); Effect of Improvement among Variables; Conclusion; References; Integrated Interpretive Structural Modeling and Fuzzy Approach for Project Risk Management of Ports; Abstract; Introduction; Literature Survey; Conceptual Framework and Methodology; Case Study and Analysis; Reachability Matrix; Diagraph Showing Interdependency of Various Risks; Integration of ISM and Fuzzy Micmac | |
588 | 0 | |a Online resource; title from digital title page (viewed on December 05, 2016). | |
650 | 0 | |a Construction industry |x Management. |0 http://id.loc.gov/authorities/subjects/sh85031411 | |
650 | 0 | |a Construction projects. |0 http://id.loc.gov/authorities/subjects/sh2006009037 | |
650 | 0 | |a Project management. |0 http://id.loc.gov/authorities/subjects/sh85065919 | |
650 | 0 | |a Engineering. |0 http://id.loc.gov/authorities/subjects/sh85043176 | |
650 | 6 | |a Construction |x Industrie |x Gestion. | |
650 | 6 | |a Projets de construction. | |
650 | 6 | |a Gestion de projet. | |
650 | 6 | |a Ingénierie. | |
650 | 7 | |a engineering. |2 aat | |
650 | 7 | |a TECHNOLOGY & ENGINEERING |x Construction |x General. |2 bisacsh | |
650 | 7 | |a Construction industry |x Management |2 fast | |
650 | 7 | |a Construction projects |2 fast | |
650 | 7 | |a Engineering |2 fast | |
650 | 7 | |a Project management |2 fast | |
700 | 1 | |a Arain, Fazal M., |e editor. | |
758 | |i has work: |a Construction project management research compendium Volume 7 (Work) |1 https://id.oclc.org/worldcat/entity/E39PCYC9fYHT78drwj44Kk8RVd |4 https://id.oclc.org/worldcat/ontology/hasWork | ||
856 | 4 | 0 | |l FWS01 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1365766 |3 Volltext |
936 | |a BATCHLOAD | ||
938 | |a ProQuest Ebook Central |b EBLB |n EBL4713621 | ||
938 | |a EBSCOhost |b EBSC |n 1365766 | ||
938 | |a YBP Library Services |b YANK |n 13052489 | ||
994 | |a 92 |b GEBAY | ||
912 | |a ZDB-4-EBA | ||
049 | |a DE-863 |
Datensatz im Suchindex
DE-BY-FWS_katkey | ZDB-4-EBA-ocn965350173 |
---|---|
_version_ | 1816882371389030400 |
adam_text | |
any_adam_object | |
author2 | Arain, Fazal M. |
author2_role | edt |
author2_variant | f m a fm fma |
author_facet | Arain, Fazal M. |
building | Verbundindex |
bvnumber | localFWS |
callnumber-first | T - Technology |
callnumber-label | TH438 |
callnumber-raw | TH438 .C66 vol. 7 |
callnumber-search | TH438 .C66 vol. 7 |
callnumber-sort | TH 3438 C66 VOL 17 |
callnumber-subject | TH - Building Construction |
collection | ZDB-4-EBA |
contents | Preface; Fifteen Years of Theory in Project Management: A Review; Abstract; Introduction; Method; Review of Top Five Cited Theories in the PM Literature, 1999-2013; Fuzzy Sets Theory; Theory of Constraints; Actor-Network Theory; Stakeholder Theory; Utility Theory; Discussion; Limitations; Conclusion; References; Impacts of Placement and Work Experience on Construction Education; Abstract; Introduction; Value of Placement in Construction Education; Placement and Academic Performance; Some Methodological Issues; Research Hypotheses; Research Method; Data Source and Description Result and DiscussionConclusion; References; Knowledge Management Practices in Small-Medium Sized Building Firms; Abstract; 1. Introduction; 2. Knowledge Management in the Construction Industry; 3. Research Method; 4. Research Results; 4.1. Understanding of Knowledge Management and Implemented Practices; 4.2. Factors affecting Knowledge Management Practices; 4.3. Knowledge Management Tools; 4.4. Discussion of Findings; Conclusion; About the Authors; References; Knowledge, Attitude and Training; on Preventing Work-Related Musculoskeletal Symptoms; in the Construction Industry; Abstract IntroductionRisk Factors Associated with Musculoskeletal Disorders; Research Methodology; Result and Discussion; Respondents' Background; Knowledge and Attitude on Occupational Health; Employees' Compensation Ordinance; Prevention and Improvement Methods for WMSDs; Conclusion; References; Just-In-Time (JIT) Management in the Ready Mixed Concrete Industry in Singapore; Abstract; Introduction; Explanation of JIT Elements; Field Study; Production Capacities of RMC Suppliers; JIT Implementation Status; Further Study; Conclusion; References; Integration of Quality Measure In Project Control SystemsAbstract; Introduction; Purpose and Objective of Research; Literature Review; Review of Existing Project Control System; Weakness of Existing Project Control System; Existing Measurement on Quality Performance; Summary on Literature Review; Methodology; Validation on Quality Measure; Validation on Integration of Quality Measure; Findings; Findings on Quality Measure; Findings on Integration of Quality Measure; Analysis on Mean Performance; Effectiveness of Proposed Control System; Discussion; Impact of Quality Measure on Existing Project Control System Impact of Quality measure on Project StakeholdersLimitation of MQI Measure; Limitation of PQI; Error in Data Collection; Wastage Allocation Factor; Issuance of Non-conformance Reports (NCRs'); Effect of Improvement among Variables; Conclusion; References; Integrated Interpretive Structural Modeling and Fuzzy Approach for Project Risk Management of Ports; Abstract; Introduction; Literature Survey; Conceptual Framework and Methodology; Case Study and Analysis; Reachability Matrix; Diagraph Showing Interdependency of Various Risks; Integration of ISM and Fuzzy Micmac |
ctrlnum | (OCoLC)965350173 |
dewey-full | 690.068 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 690 - Construction of buildings |
dewey-raw | 690.068 |
dewey-search | 690.068 |
dewey-sort | 3690.068 |
dewey-tens | 690 - Construction of buildings |
discipline | Bauingenieurwesen |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>05597cam a2200649 i 4500</leader><controlfield tag="001">ZDB-4-EBA-ocn965350173</controlfield><controlfield tag="003">OCoLC</controlfield><controlfield tag="005">20241004212047.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr cnu|||unuuu</controlfield><controlfield tag="008">161205s2016 nyu o 000 0 eng d</controlfield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">YDX</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">YDX</subfield><subfield code="d">N$T</subfield><subfield code="d">EBLCP</subfield><subfield code="d">OCLCF</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCL</subfield><subfield code="d">SNK</subfield><subfield code="d">DKU</subfield><subfield code="d">IGB</subfield><subfield code="d">D6H</subfield><subfield code="d">VTS</subfield><subfield code="d">AGLDB</subfield><subfield code="d">G3B</subfield><subfield code="d">S8J</subfield><subfield code="d">S9I</subfield><subfield code="d">STF</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">K6U</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">YDX</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCL</subfield></datafield><datafield tag="019" ind1=" " ind2=" "><subfield code="a">959980506</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781634856737</subfield><subfield code="q">(electronic book)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1634856732</subfield><subfield code="q">(electronic book)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9781634856478</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)965350173</subfield><subfield code="z">(OCoLC)959980506</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH438</subfield><subfield code="b">.C66 vol. 7</subfield></datafield><datafield tag="072" ind1=" " ind2="7"><subfield code="a">TEC</subfield><subfield code="x">005000</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="082" ind1="7" ind2=" "><subfield code="a">690.068</subfield><subfield code="2">23</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">MAIN</subfield></datafield><datafield tag="245" ind1="0" ind2="0"><subfield code="a">Construction project management research compendium.</subfield><subfield code="n">Volume 7 /</subfield><subfield code="c">Faisal M. Arain, editor.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">New York :</subfield><subfield code="b">Nova Science Publishers, Inc.,</subfield><subfield code="c">[2016]</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (188 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="347" ind1=" " ind2=" "><subfield code="a">data file</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Print version cataloged as a continuing resource by the Library of Congress.</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Preface; Fifteen Years of Theory in Project Management: A Review; Abstract; Introduction; Method; Review of Top Five Cited Theories in the PM Literature, 1999-2013; Fuzzy Sets Theory; Theory of Constraints; Actor-Network Theory; Stakeholder Theory; Utility Theory; Discussion; Limitations; Conclusion; References; Impacts of Placement and Work Experience on Construction Education; Abstract; Introduction; Value of Placement in Construction Education; Placement and Academic Performance; Some Methodological Issues; Research Hypotheses; Research Method; Data Source and Description</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Result and DiscussionConclusion; References; Knowledge Management Practices in Small-Medium Sized Building Firms; Abstract; 1. Introduction; 2. Knowledge Management in the Construction Industry; 3. Research Method; 4. Research Results; 4.1. Understanding of Knowledge Management and Implemented Practices; 4.2. Factors affecting Knowledge Management Practices; 4.3. Knowledge Management Tools; 4.4. Discussion of Findings; Conclusion; About the Authors; References; Knowledge, Attitude and Training; on Preventing Work-Related Musculoskeletal Symptoms; in the Construction Industry; Abstract</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">IntroductionRisk Factors Associated with Musculoskeletal Disorders; Research Methodology; Result and Discussion; Respondents' Background; Knowledge and Attitude on Occupational Health; Employees' Compensation Ordinance; Prevention and Improvement Methods for WMSDs; Conclusion; References; Just-In-Time (JIT) Management in the Ready Mixed Concrete Industry in Singapore; Abstract; Introduction; Explanation of JIT Elements; Field Study; Production Capacities of RMC Suppliers; JIT Implementation Status; Further Study; Conclusion; References; Integration of Quality Measure</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">In Project Control SystemsAbstract; Introduction; Purpose and Objective of Research; Literature Review; Review of Existing Project Control System; Weakness of Existing Project Control System; Existing Measurement on Quality Performance; Summary on Literature Review; Methodology; Validation on Quality Measure; Validation on Integration of Quality Measure; Findings; Findings on Quality Measure; Findings on Integration of Quality Measure; Analysis on Mean Performance; Effectiveness of Proposed Control System; Discussion; Impact of Quality Measure on Existing Project Control System</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Impact of Quality measure on Project StakeholdersLimitation of MQI Measure; Limitation of PQI; Error in Data Collection; Wastage Allocation Factor; Issuance of Non-conformance Reports (NCRs'); Effect of Improvement among Variables; Conclusion; References; Integrated Interpretive Structural Modeling and Fuzzy Approach for Project Risk Management of Ports; Abstract; Introduction; Literature Survey; Conceptual Framework and Methodology; Case Study and Analysis; Reachability Matrix; Diagraph Showing Interdependency of Various Risks; Integration of ISM and Fuzzy Micmac</subfield></datafield><datafield tag="588" ind1="0" ind2=" "><subfield code="a">Online resource; title from digital title page (viewed on December 05, 2016).</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Construction industry</subfield><subfield code="x">Management.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh85031411</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Construction projects.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh2006009037</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Project management.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh85065919</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Engineering.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh85043176</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Construction</subfield><subfield code="x">Industrie</subfield><subfield code="x">Gestion.</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Projets de construction.</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Gestion de projet.</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Ingénierie.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">engineering.</subfield><subfield code="2">aat</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING</subfield><subfield code="x">Construction</subfield><subfield code="x">General.</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Construction industry</subfield><subfield code="x">Management</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Construction projects</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Engineering</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Project management</subfield><subfield code="2">fast</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Arain, Fazal M.,</subfield><subfield code="e">editor.</subfield></datafield><datafield tag="758" ind1=" " ind2=" "><subfield code="i">has work:</subfield><subfield code="a">Construction project management research compendium Volume 7 (Work)</subfield><subfield code="1">https://id.oclc.org/worldcat/entity/E39PCYC9fYHT78drwj44Kk8RVd</subfield><subfield code="4">https://id.oclc.org/worldcat/ontology/hasWork</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="l">FWS01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1365766</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="936" ind1=" " ind2=" "><subfield code="a">BATCHLOAD</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">ProQuest Ebook Central</subfield><subfield code="b">EBLB</subfield><subfield code="n">EBL4713621</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">EBSCOhost</subfield><subfield code="b">EBSC</subfield><subfield code="n">1365766</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">13052489</subfield></datafield><datafield tag="994" ind1=" " ind2=" "><subfield code="a">92</subfield><subfield code="b">GEBAY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-863</subfield></datafield></record></collection> |
id | ZDB-4-EBA-ocn965350173 |
illustrated | Not Illustrated |
indexdate | 2024-11-27T13:27:33Z |
institution | BVB |
isbn | 9781634856737 1634856732 |
language | English |
oclc_num | 965350173 |
open_access_boolean | |
owner | MAIN DE-863 DE-BY-FWS |
owner_facet | MAIN DE-863 DE-BY-FWS |
physical | 1 online resource (188 pages) |
psigel | ZDB-4-EBA |
publishDate | 2016 |
publishDateSearch | 2016 |
publishDateSort | 2016 |
publisher | Nova Science Publishers, Inc., |
record_format | marc |
spelling | Construction project management research compendium. Volume 7 / Faisal M. Arain, editor. New York : Nova Science Publishers, Inc., [2016] 1 online resource (188 pages) text txt rdacontent computer c rdamedia online resource cr rdacarrier data file Print version cataloged as a continuing resource by the Library of Congress. Preface; Fifteen Years of Theory in Project Management: A Review; Abstract; Introduction; Method; Review of Top Five Cited Theories in the PM Literature, 1999-2013; Fuzzy Sets Theory; Theory of Constraints; Actor-Network Theory; Stakeholder Theory; Utility Theory; Discussion; Limitations; Conclusion; References; Impacts of Placement and Work Experience on Construction Education; Abstract; Introduction; Value of Placement in Construction Education; Placement and Academic Performance; Some Methodological Issues; Research Hypotheses; Research Method; Data Source and Description Result and DiscussionConclusion; References; Knowledge Management Practices in Small-Medium Sized Building Firms; Abstract; 1. Introduction; 2. Knowledge Management in the Construction Industry; 3. Research Method; 4. Research Results; 4.1. Understanding of Knowledge Management and Implemented Practices; 4.2. Factors affecting Knowledge Management Practices; 4.3. Knowledge Management Tools; 4.4. Discussion of Findings; Conclusion; About the Authors; References; Knowledge, Attitude and Training; on Preventing Work-Related Musculoskeletal Symptoms; in the Construction Industry; Abstract IntroductionRisk Factors Associated with Musculoskeletal Disorders; Research Methodology; Result and Discussion; Respondents' Background; Knowledge and Attitude on Occupational Health; Employees' Compensation Ordinance; Prevention and Improvement Methods for WMSDs; Conclusion; References; Just-In-Time (JIT) Management in the Ready Mixed Concrete Industry in Singapore; Abstract; Introduction; Explanation of JIT Elements; Field Study; Production Capacities of RMC Suppliers; JIT Implementation Status; Further Study; Conclusion; References; Integration of Quality Measure In Project Control SystemsAbstract; Introduction; Purpose and Objective of Research; Literature Review; Review of Existing Project Control System; Weakness of Existing Project Control System; Existing Measurement on Quality Performance; Summary on Literature Review; Methodology; Validation on Quality Measure; Validation on Integration of Quality Measure; Findings; Findings on Quality Measure; Findings on Integration of Quality Measure; Analysis on Mean Performance; Effectiveness of Proposed Control System; Discussion; Impact of Quality Measure on Existing Project Control System Impact of Quality measure on Project StakeholdersLimitation of MQI Measure; Limitation of PQI; Error in Data Collection; Wastage Allocation Factor; Issuance of Non-conformance Reports (NCRs'); Effect of Improvement among Variables; Conclusion; References; Integrated Interpretive Structural Modeling and Fuzzy Approach for Project Risk Management of Ports; Abstract; Introduction; Literature Survey; Conceptual Framework and Methodology; Case Study and Analysis; Reachability Matrix; Diagraph Showing Interdependency of Various Risks; Integration of ISM and Fuzzy Micmac Online resource; title from digital title page (viewed on December 05, 2016). Construction industry Management. http://id.loc.gov/authorities/subjects/sh85031411 Construction projects. http://id.loc.gov/authorities/subjects/sh2006009037 Project management. http://id.loc.gov/authorities/subjects/sh85065919 Engineering. http://id.loc.gov/authorities/subjects/sh85043176 Construction Industrie Gestion. Projets de construction. Gestion de projet. Ingénierie. engineering. aat TECHNOLOGY & ENGINEERING Construction General. bisacsh Construction industry Management fast Construction projects fast Engineering fast Project management fast Arain, Fazal M., editor. has work: Construction project management research compendium Volume 7 (Work) https://id.oclc.org/worldcat/entity/E39PCYC9fYHT78drwj44Kk8RVd https://id.oclc.org/worldcat/ontology/hasWork FWS01 ZDB-4-EBA FWS_PDA_EBA https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1365766 Volltext |
spellingShingle | Construction project management research compendium. Preface; Fifteen Years of Theory in Project Management: A Review; Abstract; Introduction; Method; Review of Top Five Cited Theories in the PM Literature, 1999-2013; Fuzzy Sets Theory; Theory of Constraints; Actor-Network Theory; Stakeholder Theory; Utility Theory; Discussion; Limitations; Conclusion; References; Impacts of Placement and Work Experience on Construction Education; Abstract; Introduction; Value of Placement in Construction Education; Placement and Academic Performance; Some Methodological Issues; Research Hypotheses; Research Method; Data Source and Description Result and DiscussionConclusion; References; Knowledge Management Practices in Small-Medium Sized Building Firms; Abstract; 1. Introduction; 2. Knowledge Management in the Construction Industry; 3. Research Method; 4. Research Results; 4.1. Understanding of Knowledge Management and Implemented Practices; 4.2. Factors affecting Knowledge Management Practices; 4.3. Knowledge Management Tools; 4.4. Discussion of Findings; Conclusion; About the Authors; References; Knowledge, Attitude and Training; on Preventing Work-Related Musculoskeletal Symptoms; in the Construction Industry; Abstract IntroductionRisk Factors Associated with Musculoskeletal Disorders; Research Methodology; Result and Discussion; Respondents' Background; Knowledge and Attitude on Occupational Health; Employees' Compensation Ordinance; Prevention and Improvement Methods for WMSDs; Conclusion; References; Just-In-Time (JIT) Management in the Ready Mixed Concrete Industry in Singapore; Abstract; Introduction; Explanation of JIT Elements; Field Study; Production Capacities of RMC Suppliers; JIT Implementation Status; Further Study; Conclusion; References; Integration of Quality Measure In Project Control SystemsAbstract; Introduction; Purpose and Objective of Research; Literature Review; Review of Existing Project Control System; Weakness of Existing Project Control System; Existing Measurement on Quality Performance; Summary on Literature Review; Methodology; Validation on Quality Measure; Validation on Integration of Quality Measure; Findings; Findings on Quality Measure; Findings on Integration of Quality Measure; Analysis on Mean Performance; Effectiveness of Proposed Control System; Discussion; Impact of Quality Measure on Existing Project Control System Impact of Quality measure on Project StakeholdersLimitation of MQI Measure; Limitation of PQI; Error in Data Collection; Wastage Allocation Factor; Issuance of Non-conformance Reports (NCRs'); Effect of Improvement among Variables; Conclusion; References; Integrated Interpretive Structural Modeling and Fuzzy Approach for Project Risk Management of Ports; Abstract; Introduction; Literature Survey; Conceptual Framework and Methodology; Case Study and Analysis; Reachability Matrix; Diagraph Showing Interdependency of Various Risks; Integration of ISM and Fuzzy Micmac Construction industry Management. http://id.loc.gov/authorities/subjects/sh85031411 Construction projects. http://id.loc.gov/authorities/subjects/sh2006009037 Project management. http://id.loc.gov/authorities/subjects/sh85065919 Engineering. http://id.loc.gov/authorities/subjects/sh85043176 Construction Industrie Gestion. Projets de construction. Gestion de projet. Ingénierie. engineering. aat TECHNOLOGY & ENGINEERING Construction General. bisacsh Construction industry Management fast Construction projects fast Engineering fast Project management fast |
subject_GND | http://id.loc.gov/authorities/subjects/sh85031411 http://id.loc.gov/authorities/subjects/sh2006009037 http://id.loc.gov/authorities/subjects/sh85065919 http://id.loc.gov/authorities/subjects/sh85043176 |
title | Construction project management research compendium. |
title_auth | Construction project management research compendium. |
title_exact_search | Construction project management research compendium. |
title_full | Construction project management research compendium. Volume 7 / Faisal M. Arain, editor. |
title_fullStr | Construction project management research compendium. Volume 7 / Faisal M. Arain, editor. |
title_full_unstemmed | Construction project management research compendium. Volume 7 / Faisal M. Arain, editor. |
title_short | Construction project management research compendium. |
title_sort | construction project management research compendium |
topic | Construction industry Management. http://id.loc.gov/authorities/subjects/sh85031411 Construction projects. http://id.loc.gov/authorities/subjects/sh2006009037 Project management. http://id.loc.gov/authorities/subjects/sh85065919 Engineering. http://id.loc.gov/authorities/subjects/sh85043176 Construction Industrie Gestion. Projets de construction. Gestion de projet. Ingénierie. engineering. aat TECHNOLOGY & ENGINEERING Construction General. bisacsh Construction industry Management fast Construction projects fast Engineering fast Project management fast |
topic_facet | Construction industry Management. Construction projects. Project management. Engineering. Construction Industrie Gestion. Projets de construction. Gestion de projet. Ingénierie. engineering. TECHNOLOGY & ENGINEERING Construction General. Construction industry Management Construction projects Engineering Project management |
url | https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1365766 |
work_keys_str_mv | AT arainfazalm constructionprojectmanagementresearchcompendiumvolume7 |