Construction process planning and management :: an owner's guide to successful projects /
By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary t...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Amsterdam ; Boston :
Butterworth-Heinemann,
©2010.
|
Schlagworte: | |
Online-Zugang: | Volltext Volltext |
Zusammenfassung: | By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary tools to save time and money on your construction project. In this book, Sid Levy provides valuable advice for avoiding or working through the common problems that are a result of the long-term nature of construction projects, failure to select a?project delivery system? appropriate to the project, incomplete drawing and specifications, unrealistic scheduling, poor communication and coordination among participants, and inadequate contract administration. From project genesis, through design development to contractor and contract selection, on to construction oversight, punch list and successful project close-out, this book will point out those pitfalls to avoid and offer practical advice at every step along the way. Administer the general construction process including solicitation of contractor's qualifications (pre-qualify bidders), comparative analysis of bid packages, recommendation for contract award, contract document negotiation and documentation of job change orders. Provide Project Planning and on-site management and coordination of all construction projects. Ensure compliance of building construction rules and regulations and collaborate with chief engineers to monitor quality of construction. Conduct technical/plan review of construction documents and submit written responses identifying required corrections or changes. Design, implement and oversee Company standards for construction policies, practices and processes. |
Beschreibung: | 1 online resource (x, 381 pages) : illustrations |
ISBN: | 9781856175487 1856175480 9780080949802 0080949800 |
Internformat
MARC
LEADER | 00000cam a2200000 a 4500 | ||
---|---|---|---|
001 | ZDB-4-EBA-ocn610001446 | ||
003 | OCoLC | ||
005 | 20241004212047.0 | ||
006 | m o d | ||
007 | cr cn||||||||| | ||
008 | 100429s2010 ne a o 001 0 eng d | ||
010 | |a 2009281660 | ||
040 | |a OPELS |b eng |e pn |c OPELS |d OCLCQ |d OCLCF |d KNOVL |d EBLCP |d IDEBK |d CEF |d N$T |d YDXCP |d COO |d UBY |d DKU |d OCLCO |d FUG |d DEBSZ |d OCLCO |d E7B |d CNNAI |d NNO |d OCLCQ |d OCLCO |d OCLCQ |d ICA |d ZCU |d MERUC |d OCLCQ |d U3W |d D6H |d VTS |d RRP |d ICG |d VT2 |d AU@ |d OCLCQ |d NLE |d WYU |d STF |d LEAUB |d DKC |d OCLCQ |d M8D |d OL$ |d OCLCQ |d AJS |d UKAHL |d OCLCO |d OCLCQ |d OCLCO |d OCLCQ |d SXB |d OCLCQ |d OCLCO |d VLB | ||
019 | |a 476298522 |a 527387534 |a 541901647 |a 646827385 |a 712985845 |a 858440855 |a 860586678 |a 1055366810 |a 1057993236 |a 1065699896 |a 1081257022 |a 1102532812 |a 1228579462 |a 1264868935 | ||
020 | |a 9781856175487 | ||
020 | |a 1856175480 | ||
020 | |a 9780080949802 |q (electronic bk.) | ||
020 | |a 0080949800 |q (electronic bk.) | ||
024 | 8 | |a 9786612289057 | |
035 | |a (OCoLC)610001446 |z (OCoLC)476298522 |z (OCoLC)527387534 |z (OCoLC)541901647 |z (OCoLC)646827385 |z (OCoLC)712985845 |z (OCoLC)858440855 |z (OCoLC)860586678 |z (OCoLC)1055366810 |z (OCoLC)1057993236 |z (OCoLC)1065699896 |z (OCoLC)1081257022 |z (OCoLC)1102532812 |z (OCoLC)1228579462 |z (OCoLC)1264868935 | ||
037 | |a 158652:158823 |b Elsevier Science & Technology |n http://www.sciencedirect.com | ||
050 | 4 | |a TH438 |b .L48 2010 | |
072 | 7 | |a TEC |x 005000 |2 bisacsh | |
082 | 7 | |a 690 |2 22 | |
049 | |a MAIN | ||
100 | 1 | |a Levy, Sidney M. |1 https://id.oclc.org/worldcat/entity/E39PCjGB8kX4mghcjWwRG6xp4C |0 http://id.loc.gov/authorities/names/n85374455 | |
245 | 1 | 0 | |a Construction process planning and management : |b an owner's guide to successful projects / |c Sidney M. Levy. |
260 | |a Amsterdam ; |a Boston : |b Butterworth-Heinemann, |c ©2010. | ||
300 | |a 1 online resource (x, 381 pages) : |b illustrations | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
520 | |a By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary tools to save time and money on your construction project. In this book, Sid Levy provides valuable advice for avoiding or working through the common problems that are a result of the long-term nature of construction projects, failure to select a?project delivery system? appropriate to the project, incomplete drawing and specifications, unrealistic scheduling, poor communication and coordination among participants, and inadequate contract administration. From project genesis, through design development to contractor and contract selection, on to construction oversight, punch list and successful project close-out, this book will point out those pitfalls to avoid and offer practical advice at every step along the way. Administer the general construction process including solicitation of contractor's qualifications (pre-qualify bidders), comparative analysis of bid packages, recommendation for contract award, contract document negotiation and documentation of job change orders. Provide Project Planning and on-site management and coordination of all construction projects. Ensure compliance of building construction rules and regulations and collaborate with chief engineers to monitor quality of construction. Conduct technical/plan review of construction documents and submit written responses identifying required corrections or changes. Design, implement and oversee Company standards for construction policies, practices and processes. | ||
505 | 0 | |a Chapter 1- An Introduction to the Design and Construction industry -- The construction. architectural and engineering business -- Hiring an architect and defining the Owner's Program -- General Contracting- full service, broker- how they operate -- Subcontracting -- 2nd, 3rd tier subs. -- Chapter 2- Project Genesis -- The Fast Track process- pluses and minuses -- To CM or not to CM? -- Considering Design-Build at this early stage -- Chapter 3?Selecting and Working with Architects -- The Right Questions to Ask -- Checking up via References -- The process of extracting the owner's program -- The full field of services architects can supply -- -- Chapter 4- Construction Contracts-Types, Pros and Cons of Each -- Getting Started with a Letter of Intent -- Cost Plus -- Cost Plus a Fee with a Guaranteed Maximum Price (GMP) -- Lump or Stipulated sum -- Construction Manager (CM) -- Design-Build -- The Value of Alternates and Allowances -- Chapter 5- Preparing Meaningful Bid Documents -- The Request for Qualifications (RFQ) -- The Request for Proposal (RFP) -- Sample forms -- The Value of a Pre-Bid Conference -- Evaluating Bids -- Contractor Selection -- Chapter 6- Preparing the Construction Contract -- Some Helpful Tips -- Contract Language to Protect the Owner -- The Value of Exhibits to the Contract -- When Tenant Work is Involved in a Commercial Lease -- The Need for a Contingency -- The role of Bonds and Insurance -- Chapter 7- Organizing for Construction -- The role of the Architect During Construction -- The role of the Owner's Representative -- Establishing Effective communications between all parties -- Dealing With Difficult Issues That Can Cause Disputes & Claims -- Chapter 8- The Construction Schedule -- The CMP Schedule- the Bar Chart Schedule -- The Importance of the Base Line Schedule -- The Double Edged Sword -- -- Chapter 9- The Change Order Process -- How to Eliminate Many problems Up Front -- Effective Monitoring of Contractor's cost proposals -- The Owner's rights and obligations -- Chapter 10-Participating in the Construction Process -- The Weekly Progress Meetings -- Project Documentation to Protect One's Position -- Lien Waivers- What They Do and what They don't Do -- The Art of Compromise -- Chapter 11- Successfully Closing out the Project -- Successful Close-Out Starts at the Project's Beginning -- Punch List Tips -- Warranties/Guarantees- Read the Fine Print -- Before Issuing that Final Payment -- -- Appendix? Samples of Design and Construction Contracts -- American Institute of Architects (AIA). | |
505 | 0 | |a ch. 1. The genesis of a construction project -- ch. 2. Selecting and working with architects -- ch. 3. The architectural, engineering, and contracting industries -- ch. 4. Construction contracts pros and cons -- ch. 5. Preparing the bib documents -- ch. 6. The construction contract -- ch. 7. Organizing for the construction process -- ch. 8. Change orders -- ch. 9. Green and sustainable buildings -- ch. 10. Disputes and claims -- ch. 11. Basic construction components. | |
588 | 0 | |a Print version record. | |
650 | 0 | |a Building |x Planning. | |
650 | 0 | |a Building |x Superintendence. |0 http://id.loc.gov/authorities/subjects/sh85017702 | |
650 | 6 | |a Construction |x Planification. | |
650 | 6 | |a Construction |x Direction des travaux. | |
650 | 7 | |a TECHNOLOGY & ENGINEERING |x Construction |x General. |2 bisacsh | |
650 | 7 | |a Building |x Planning |2 fast | |
650 | 7 | |a Building |x Superintendence |2 fast | |
776 | 0 | 8 | |i Print version: |a Levy, Sidney M. |t Construction process planning and management. |d Amsterdam ; Boston : Butterworth-Heinemann, ©2010 |z 9781856175487 |z 1856175480 |w (OCoLC)229031553 |
856 | 4 | 0 | |l FWS01 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://www.sciencedirect.com/science/book/9781856175487 |3 Volltext |
856 | 4 | 0 | |l FWS01 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=297201 |3 Volltext |
938 | |a Askews and Holts Library Services |b ASKH |n AH23091914 | ||
938 | |a EBL - Ebook Library |b EBLB |n EBL453061 | ||
938 | |a ebrary |b EBRY |n ebr10329372 | ||
938 | |a EBSCOhost |b EBSC |n 297201 | ||
938 | |a YBP Library Services |b YANK |n 3101737 | ||
994 | |a 92 |b GEBAY | ||
912 | |a ZDB-4-EBA | ||
049 | |a DE-863 |
Datensatz im Suchindex
DE-BY-FWS_katkey | ZDB-4-EBA-ocn610001446 |
---|---|
_version_ | 1816881718383083521 |
adam_text | |
any_adam_object | |
author | Levy, Sidney M. |
author_GND | http://id.loc.gov/authorities/names/n85374455 |
author_facet | Levy, Sidney M. |
author_role | |
author_sort | Levy, Sidney M. |
author_variant | s m l sm sml |
building | Verbundindex |
bvnumber | localFWS |
callnumber-first | T - Technology |
callnumber-label | TH438 |
callnumber-raw | TH438 .L48 2010 |
callnumber-search | TH438 .L48 2010 |
callnumber-sort | TH 3438 L48 42010 |
callnumber-subject | TH - Building Construction |
collection | ZDB-4-EBA |
contents | Chapter 1- An Introduction to the Design and Construction industry -- The construction. architectural and engineering business -- Hiring an architect and defining the Owner's Program -- General Contracting- full service, broker- how they operate -- Subcontracting -- 2nd, 3rd tier subs. -- Chapter 2- Project Genesis -- The Fast Track process- pluses and minuses -- To CM or not to CM? -- Considering Design-Build at this early stage -- Chapter 3?Selecting and Working with Architects -- The Right Questions to Ask -- Checking up via References -- The process of extracting the owner's program -- The full field of services architects can supply -- -- Chapter 4- Construction Contracts-Types, Pros and Cons of Each -- Getting Started with a Letter of Intent -- Cost Plus -- Cost Plus a Fee with a Guaranteed Maximum Price (GMP) -- Lump or Stipulated sum -- Construction Manager (CM) -- Design-Build -- The Value of Alternates and Allowances -- Chapter 5- Preparing Meaningful Bid Documents -- The Request for Qualifications (RFQ) -- The Request for Proposal (RFP) -- Sample forms -- The Value of a Pre-Bid Conference -- Evaluating Bids -- Contractor Selection -- Chapter 6- Preparing the Construction Contract -- Some Helpful Tips -- Contract Language to Protect the Owner -- The Value of Exhibits to the Contract -- When Tenant Work is Involved in a Commercial Lease -- The Need for a Contingency -- The role of Bonds and Insurance -- Chapter 7- Organizing for Construction -- The role of the Architect During Construction -- The role of the Owner's Representative -- Establishing Effective communications between all parties -- Dealing With Difficult Issues That Can Cause Disputes & Claims -- Chapter 8- The Construction Schedule -- The CMP Schedule- the Bar Chart Schedule -- The Importance of the Base Line Schedule -- The Double Edged Sword -- -- Chapter 9- The Change Order Process -- How to Eliminate Many problems Up Front -- Effective Monitoring of Contractor's cost proposals -- The Owner's rights and obligations -- Chapter 10-Participating in the Construction Process -- The Weekly Progress Meetings -- Project Documentation to Protect One's Position -- Lien Waivers- What They Do and what They don't Do -- The Art of Compromise -- Chapter 11- Successfully Closing out the Project -- Successful Close-Out Starts at the Project's Beginning -- Punch List Tips -- Warranties/Guarantees- Read the Fine Print -- Before Issuing that Final Payment -- -- Appendix? Samples of Design and Construction Contracts -- American Institute of Architects (AIA). ch. 1. The genesis of a construction project -- ch. 2. Selecting and working with architects -- ch. 3. The architectural, engineering, and contracting industries -- ch. 4. Construction contracts pros and cons -- ch. 5. Preparing the bib documents -- ch. 6. The construction contract -- ch. 7. Organizing for the construction process -- ch. 8. Change orders -- ch. 9. Green and sustainable buildings -- ch. 10. Disputes and claims -- ch. 11. Basic construction components. |
ctrlnum | (OCoLC)610001446 |
dewey-full | 690 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 690 - Construction of buildings |
dewey-raw | 690 |
dewey-search | 690 |
dewey-sort | 3690 |
dewey-tens | 690 - Construction of buildings |
discipline | Bauingenieurwesen |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>07872cam a2200589 a 4500</leader><controlfield tag="001">ZDB-4-EBA-ocn610001446</controlfield><controlfield tag="003">OCoLC</controlfield><controlfield tag="005">20241004212047.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr cn|||||||||</controlfield><controlfield tag="008">100429s2010 ne a o 001 0 eng d</controlfield><datafield tag="010" ind1=" " ind2=" "><subfield code="a"> 2009281660</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">OPELS</subfield><subfield code="b">eng</subfield><subfield code="e">pn</subfield><subfield code="c">OPELS</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCF</subfield><subfield code="d">KNOVL</subfield><subfield code="d">EBLCP</subfield><subfield code="d">IDEBK</subfield><subfield code="d">CEF</subfield><subfield code="d">N$T</subfield><subfield code="d">YDXCP</subfield><subfield code="d">COO</subfield><subfield code="d">UBY</subfield><subfield code="d">DKU</subfield><subfield code="d">OCLCO</subfield><subfield code="d">FUG</subfield><subfield code="d">DEBSZ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">E7B</subfield><subfield code="d">CNNAI</subfield><subfield code="d">NNO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">ICA</subfield><subfield code="d">ZCU</subfield><subfield code="d">MERUC</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">U3W</subfield><subfield code="d">D6H</subfield><subfield code="d">VTS</subfield><subfield code="d">RRP</subfield><subfield code="d">ICG</subfield><subfield code="d">VT2</subfield><subfield code="d">AU@</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">NLE</subfield><subfield code="d">WYU</subfield><subfield code="d">STF</subfield><subfield code="d">LEAUB</subfield><subfield code="d">DKC</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">M8D</subfield><subfield code="d">OL$</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">AJS</subfield><subfield code="d">UKAHL</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">SXB</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">VLB</subfield></datafield><datafield tag="019" ind1=" " ind2=" "><subfield code="a">476298522</subfield><subfield code="a">527387534</subfield><subfield code="a">541901647</subfield><subfield code="a">646827385</subfield><subfield code="a">712985845</subfield><subfield code="a">858440855</subfield><subfield code="a">860586678</subfield><subfield code="a">1055366810</subfield><subfield code="a">1057993236</subfield><subfield code="a">1065699896</subfield><subfield code="a">1081257022</subfield><subfield code="a">1102532812</subfield><subfield code="a">1228579462</subfield><subfield code="a">1264868935</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781856175487</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1856175480</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780080949802</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0080949800</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="024" ind1="8" ind2=" "><subfield code="a">9786612289057</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)610001446</subfield><subfield code="z">(OCoLC)476298522</subfield><subfield code="z">(OCoLC)527387534</subfield><subfield code="z">(OCoLC)541901647</subfield><subfield code="z">(OCoLC)646827385</subfield><subfield code="z">(OCoLC)712985845</subfield><subfield code="z">(OCoLC)858440855</subfield><subfield code="z">(OCoLC)860586678</subfield><subfield code="z">(OCoLC)1055366810</subfield><subfield code="z">(OCoLC)1057993236</subfield><subfield code="z">(OCoLC)1065699896</subfield><subfield code="z">(OCoLC)1081257022</subfield><subfield code="z">(OCoLC)1102532812</subfield><subfield code="z">(OCoLC)1228579462</subfield><subfield code="z">(OCoLC)1264868935</subfield></datafield><datafield tag="037" ind1=" " ind2=" "><subfield code="a">158652:158823</subfield><subfield code="b">Elsevier Science & Technology</subfield><subfield code="n">http://www.sciencedirect.com</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH438</subfield><subfield code="b">.L48 2010</subfield></datafield><datafield tag="072" ind1=" " ind2="7"><subfield code="a">TEC</subfield><subfield code="x">005000</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="082" ind1="7" ind2=" "><subfield code="a">690</subfield><subfield code="2">22</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">MAIN</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Levy, Sidney M.</subfield><subfield code="1">https://id.oclc.org/worldcat/entity/E39PCjGB8kX4mghcjWwRG6xp4C</subfield><subfield code="0">http://id.loc.gov/authorities/names/n85374455</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Construction process planning and management :</subfield><subfield code="b">an owner's guide to successful projects /</subfield><subfield code="c">Sidney M. Levy.</subfield></datafield><datafield tag="260" ind1=" " ind2=" "><subfield code="a">Amsterdam ;</subfield><subfield code="a">Boston :</subfield><subfield code="b">Butterworth-Heinemann,</subfield><subfield code="c">©2010.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (x, 381 pages) :</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary tools to save time and money on your construction project. In this book, Sid Levy provides valuable advice for avoiding or working through the common problems that are a result of the long-term nature of construction projects, failure to select a?project delivery system? appropriate to the project, incomplete drawing and specifications, unrealistic scheduling, poor communication and coordination among participants, and inadequate contract administration. From project genesis, through design development to contractor and contract selection, on to construction oversight, punch list and successful project close-out, this book will point out those pitfalls to avoid and offer practical advice at every step along the way. Administer the general construction process including solicitation of contractor's qualifications (pre-qualify bidders), comparative analysis of bid packages, recommendation for contract award, contract document negotiation and documentation of job change orders. Provide Project Planning and on-site management and coordination of all construction projects. Ensure compliance of building construction rules and regulations and collaborate with chief engineers to monitor quality of construction. Conduct technical/plan review of construction documents and submit written responses identifying required corrections or changes. Design, implement and oversee Company standards for construction policies, practices and processes.</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Chapter 1- An Introduction to the Design and Construction industry -- The construction. architectural and engineering business -- Hiring an architect and defining the Owner's Program -- General Contracting- full service, broker- how they operate -- Subcontracting -- 2nd, 3rd tier subs. -- Chapter 2- Project Genesis -- The Fast Track process- pluses and minuses -- To CM or not to CM? -- Considering Design-Build at this early stage -- Chapter 3?Selecting and Working with Architects -- The Right Questions to Ask -- Checking up via References -- The process of extracting the owner's program -- The full field of services architects can supply -- -- Chapter 4- Construction Contracts-Types, Pros and Cons of Each -- Getting Started with a Letter of Intent -- Cost Plus -- Cost Plus a Fee with a Guaranteed Maximum Price (GMP) -- Lump or Stipulated sum -- Construction Manager (CM) -- Design-Build -- The Value of Alternates and Allowances -- Chapter 5- Preparing Meaningful Bid Documents -- The Request for Qualifications (RFQ) -- The Request for Proposal (RFP) -- Sample forms -- The Value of a Pre-Bid Conference -- Evaluating Bids -- Contractor Selection -- Chapter 6- Preparing the Construction Contract -- Some Helpful Tips -- Contract Language to Protect the Owner -- The Value of Exhibits to the Contract -- When Tenant Work is Involved in a Commercial Lease -- The Need for a Contingency -- The role of Bonds and Insurance -- Chapter 7- Organizing for Construction -- The role of the Architect During Construction -- The role of the Owner's Representative -- Establishing Effective communications between all parties -- Dealing With Difficult Issues That Can Cause Disputes & Claims -- Chapter 8- The Construction Schedule -- The CMP Schedule- the Bar Chart Schedule -- The Importance of the Base Line Schedule -- The Double Edged Sword -- -- Chapter 9- The Change Order Process -- How to Eliminate Many problems Up Front -- Effective Monitoring of Contractor's cost proposals -- The Owner's rights and obligations -- Chapter 10-Participating in the Construction Process -- The Weekly Progress Meetings -- Project Documentation to Protect One's Position -- Lien Waivers- What They Do and what They don't Do -- The Art of Compromise -- Chapter 11- Successfully Closing out the Project -- Successful Close-Out Starts at the Project's Beginning -- Punch List Tips -- Warranties/Guarantees- Read the Fine Print -- Before Issuing that Final Payment -- -- Appendix? Samples of Design and Construction Contracts -- American Institute of Architects (AIA).</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">ch. 1. The genesis of a construction project -- ch. 2. Selecting and working with architects -- ch. 3. The architectural, engineering, and contracting industries -- ch. 4. Construction contracts pros and cons -- ch. 5. Preparing the bib documents -- ch. 6. The construction contract -- ch. 7. Organizing for the construction process -- ch. 8. Change orders -- ch. 9. Green and sustainable buildings -- ch. 10. Disputes and claims -- ch. 11. Basic construction components.</subfield></datafield><datafield tag="588" ind1="0" ind2=" "><subfield code="a">Print version record.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Building</subfield><subfield code="x">Planning.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Building</subfield><subfield code="x">Superintendence.</subfield><subfield code="0">http://id.loc.gov/authorities/subjects/sh85017702</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Construction</subfield><subfield code="x">Planification.</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Construction</subfield><subfield code="x">Direction des travaux.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING</subfield><subfield code="x">Construction</subfield><subfield code="x">General.</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Building</subfield><subfield code="x">Planning</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Building</subfield><subfield code="x">Superintendence</subfield><subfield code="2">fast</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Levy, Sidney M.</subfield><subfield code="t">Construction process planning and management.</subfield><subfield code="d">Amsterdam ; Boston : Butterworth-Heinemann, ©2010</subfield><subfield code="z">9781856175487</subfield><subfield code="z">1856175480</subfield><subfield code="w">(OCoLC)229031553</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="l">FWS01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://www.sciencedirect.com/science/book/9781856175487</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="l">FWS01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=297201</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">Askews and Holts Library Services</subfield><subfield code="b">ASKH</subfield><subfield code="n">AH23091914</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">EBL - Ebook Library</subfield><subfield code="b">EBLB</subfield><subfield code="n">EBL453061</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">ebrary</subfield><subfield code="b">EBRY</subfield><subfield code="n">ebr10329372</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">EBSCOhost</subfield><subfield code="b">EBSC</subfield><subfield code="n">297201</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">3101737</subfield></datafield><datafield tag="994" ind1=" " ind2=" "><subfield code="a">92</subfield><subfield code="b">GEBAY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-863</subfield></datafield></record></collection> |
id | ZDB-4-EBA-ocn610001446 |
illustrated | Illustrated |
indexdate | 2024-11-27T13:17:10Z |
institution | BVB |
isbn | 9781856175487 1856175480 9780080949802 0080949800 |
language | English |
lccn | 2009281660 |
oclc_num | 610001446 |
open_access_boolean | |
owner | MAIN DE-863 DE-BY-FWS |
owner_facet | MAIN DE-863 DE-BY-FWS |
physical | 1 online resource (x, 381 pages) : illustrations |
psigel | ZDB-4-EBA |
publishDate | 2010 |
publishDateSearch | 2010 |
publishDateSort | 2010 |
publisher | Butterworth-Heinemann, |
record_format | marc |
spelling | Levy, Sidney M. https://id.oclc.org/worldcat/entity/E39PCjGB8kX4mghcjWwRG6xp4C http://id.loc.gov/authorities/names/n85374455 Construction process planning and management : an owner's guide to successful projects / Sidney M. Levy. Amsterdam ; Boston : Butterworth-Heinemann, ©2010. 1 online resource (x, 381 pages) : illustrations text txt rdacontent computer c rdamedia online resource cr rdacarrier By their very nature, construction projects can create seemingly endless opportunities for conflict. Written by a best selling author with over 40 years of experiences in the construction and general contracting business, Construction Process Planning and Management provides you with the necessary tools to save time and money on your construction project. In this book, Sid Levy provides valuable advice for avoiding or working through the common problems that are a result of the long-term nature of construction projects, failure to select a?project delivery system? appropriate to the project, incomplete drawing and specifications, unrealistic scheduling, poor communication and coordination among participants, and inadequate contract administration. From project genesis, through design development to contractor and contract selection, on to construction oversight, punch list and successful project close-out, this book will point out those pitfalls to avoid and offer practical advice at every step along the way. Administer the general construction process including solicitation of contractor's qualifications (pre-qualify bidders), comparative analysis of bid packages, recommendation for contract award, contract document negotiation and documentation of job change orders. Provide Project Planning and on-site management and coordination of all construction projects. Ensure compliance of building construction rules and regulations and collaborate with chief engineers to monitor quality of construction. Conduct technical/plan review of construction documents and submit written responses identifying required corrections or changes. Design, implement and oversee Company standards for construction policies, practices and processes. Chapter 1- An Introduction to the Design and Construction industry -- The construction. architectural and engineering business -- Hiring an architect and defining the Owner's Program -- General Contracting- full service, broker- how they operate -- Subcontracting -- 2nd, 3rd tier subs. -- Chapter 2- Project Genesis -- The Fast Track process- pluses and minuses -- To CM or not to CM? -- Considering Design-Build at this early stage -- Chapter 3?Selecting and Working with Architects -- The Right Questions to Ask -- Checking up via References -- The process of extracting the owner's program -- The full field of services architects can supply -- -- Chapter 4- Construction Contracts-Types, Pros and Cons of Each -- Getting Started with a Letter of Intent -- Cost Plus -- Cost Plus a Fee with a Guaranteed Maximum Price (GMP) -- Lump or Stipulated sum -- Construction Manager (CM) -- Design-Build -- The Value of Alternates and Allowances -- Chapter 5- Preparing Meaningful Bid Documents -- The Request for Qualifications (RFQ) -- The Request for Proposal (RFP) -- Sample forms -- The Value of a Pre-Bid Conference -- Evaluating Bids -- Contractor Selection -- Chapter 6- Preparing the Construction Contract -- Some Helpful Tips -- Contract Language to Protect the Owner -- The Value of Exhibits to the Contract -- When Tenant Work is Involved in a Commercial Lease -- The Need for a Contingency -- The role of Bonds and Insurance -- Chapter 7- Organizing for Construction -- The role of the Architect During Construction -- The role of the Owner's Representative -- Establishing Effective communications between all parties -- Dealing With Difficult Issues That Can Cause Disputes & Claims -- Chapter 8- The Construction Schedule -- The CMP Schedule- the Bar Chart Schedule -- The Importance of the Base Line Schedule -- The Double Edged Sword -- -- Chapter 9- The Change Order Process -- How to Eliminate Many problems Up Front -- Effective Monitoring of Contractor's cost proposals -- The Owner's rights and obligations -- Chapter 10-Participating in the Construction Process -- The Weekly Progress Meetings -- Project Documentation to Protect One's Position -- Lien Waivers- What They Do and what They don't Do -- The Art of Compromise -- Chapter 11- Successfully Closing out the Project -- Successful Close-Out Starts at the Project's Beginning -- Punch List Tips -- Warranties/Guarantees- Read the Fine Print -- Before Issuing that Final Payment -- -- Appendix? Samples of Design and Construction Contracts -- American Institute of Architects (AIA). ch. 1. The genesis of a construction project -- ch. 2. Selecting and working with architects -- ch. 3. The architectural, engineering, and contracting industries -- ch. 4. Construction contracts pros and cons -- ch. 5. Preparing the bib documents -- ch. 6. The construction contract -- ch. 7. Organizing for the construction process -- ch. 8. Change orders -- ch. 9. Green and sustainable buildings -- ch. 10. Disputes and claims -- ch. 11. Basic construction components. Print version record. Building Planning. Building Superintendence. http://id.loc.gov/authorities/subjects/sh85017702 Construction Planification. Construction Direction des travaux. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Planning fast Building Superintendence fast Print version: Levy, Sidney M. Construction process planning and management. Amsterdam ; Boston : Butterworth-Heinemann, ©2010 9781856175487 1856175480 (OCoLC)229031553 FWS01 ZDB-4-EBA FWS_PDA_EBA https://www.sciencedirect.com/science/book/9781856175487 Volltext FWS01 ZDB-4-EBA FWS_PDA_EBA https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=297201 Volltext |
spellingShingle | Levy, Sidney M. Construction process planning and management : an owner's guide to successful projects / Chapter 1- An Introduction to the Design and Construction industry -- The construction. architectural and engineering business -- Hiring an architect and defining the Owner's Program -- General Contracting- full service, broker- how they operate -- Subcontracting -- 2nd, 3rd tier subs. -- Chapter 2- Project Genesis -- The Fast Track process- pluses and minuses -- To CM or not to CM? -- Considering Design-Build at this early stage -- Chapter 3?Selecting and Working with Architects -- The Right Questions to Ask -- Checking up via References -- The process of extracting the owner's program -- The full field of services architects can supply -- -- Chapter 4- Construction Contracts-Types, Pros and Cons of Each -- Getting Started with a Letter of Intent -- Cost Plus -- Cost Plus a Fee with a Guaranteed Maximum Price (GMP) -- Lump or Stipulated sum -- Construction Manager (CM) -- Design-Build -- The Value of Alternates and Allowances -- Chapter 5- Preparing Meaningful Bid Documents -- The Request for Qualifications (RFQ) -- The Request for Proposal (RFP) -- Sample forms -- The Value of a Pre-Bid Conference -- Evaluating Bids -- Contractor Selection -- Chapter 6- Preparing the Construction Contract -- Some Helpful Tips -- Contract Language to Protect the Owner -- The Value of Exhibits to the Contract -- When Tenant Work is Involved in a Commercial Lease -- The Need for a Contingency -- The role of Bonds and Insurance -- Chapter 7- Organizing for Construction -- The role of the Architect During Construction -- The role of the Owner's Representative -- Establishing Effective communications between all parties -- Dealing With Difficult Issues That Can Cause Disputes & Claims -- Chapter 8- The Construction Schedule -- The CMP Schedule- the Bar Chart Schedule -- The Importance of the Base Line Schedule -- The Double Edged Sword -- -- Chapter 9- The Change Order Process -- How to Eliminate Many problems Up Front -- Effective Monitoring of Contractor's cost proposals -- The Owner's rights and obligations -- Chapter 10-Participating in the Construction Process -- The Weekly Progress Meetings -- Project Documentation to Protect One's Position -- Lien Waivers- What They Do and what They don't Do -- The Art of Compromise -- Chapter 11- Successfully Closing out the Project -- Successful Close-Out Starts at the Project's Beginning -- Punch List Tips -- Warranties/Guarantees- Read the Fine Print -- Before Issuing that Final Payment -- -- Appendix? Samples of Design and Construction Contracts -- American Institute of Architects (AIA). ch. 1. The genesis of a construction project -- ch. 2. Selecting and working with architects -- ch. 3. The architectural, engineering, and contracting industries -- ch. 4. Construction contracts pros and cons -- ch. 5. Preparing the bib documents -- ch. 6. The construction contract -- ch. 7. Organizing for the construction process -- ch. 8. Change orders -- ch. 9. Green and sustainable buildings -- ch. 10. Disputes and claims -- ch. 11. Basic construction components. Building Planning. Building Superintendence. http://id.loc.gov/authorities/subjects/sh85017702 Construction Planification. Construction Direction des travaux. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Planning fast Building Superintendence fast |
subject_GND | http://id.loc.gov/authorities/subjects/sh85017702 |
title | Construction process planning and management : an owner's guide to successful projects / |
title_auth | Construction process planning and management : an owner's guide to successful projects / |
title_exact_search | Construction process planning and management : an owner's guide to successful projects / |
title_full | Construction process planning and management : an owner's guide to successful projects / Sidney M. Levy. |
title_fullStr | Construction process planning and management : an owner's guide to successful projects / Sidney M. Levy. |
title_full_unstemmed | Construction process planning and management : an owner's guide to successful projects / Sidney M. Levy. |
title_short | Construction process planning and management : |
title_sort | construction process planning and management an owner s guide to successful projects |
title_sub | an owner's guide to successful projects / |
topic | Building Planning. Building Superintendence. http://id.loc.gov/authorities/subjects/sh85017702 Construction Planification. Construction Direction des travaux. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Planning fast Building Superintendence fast |
topic_facet | Building Planning. Building Superintendence. Construction Planification. Construction Direction des travaux. TECHNOLOGY & ENGINEERING Construction General. Building Planning Building Superintendence |
url | https://www.sciencedirect.com/science/book/9781856175487 https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=297201 |
work_keys_str_mv | AT levysidneym constructionprocessplanningandmanagementanownersguidetosuccessfulprojects |