Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project: Project Performance Assessment Report
Ratings for the Integrated Irrigation Improvement and Management Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, Bank performance was moderately satisfactory, and Borrow performance was moderately satisfactory. Ratings for the Farm-Level Irrigatio...
Gespeichert in:
Körperschaft: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Washington, D.C
The World Bank
2022
|
Schriftenreihe: | Independent Evaluation Group Studies
|
Schlagworte: | |
Online-Zugang: | Volltext |
Zusammenfassung: | Ratings for the Integrated Irrigation Improvement and Management Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, Bank performance was moderately satisfactory, and Borrow performance was moderately satisfactory. Ratings for the Farm-Level Irrigation Modernization Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, and Bank performance was moderately satisfactory. This assessment offers the following lessons: (i) In irrigation systems, such as the Nile Delta's, that are organized along a hierarchical canal network, irrigation improvement efforts can realize greater impact by applying a systematic approach to rehabilitation, as was done through these two projects, as opposed to addressing different levels of the canal system in isolation. (ii) Efficient implementation of irrigation improvement works requires coordinating and sequencing activities that fall under the mandate of many different entities, which are often beyond the authority of the project implementing agency. (iii) Effecting behavior changes in on-farm water use, agronomic practices, and diversification to higher-value crops requires support beyond improvements to the irrigation water delivery system. (iv) Successfully reforming the institutions that manage irrigation and drainage services, both water users and government agencies, requires greater attention to incentives for collaboration. (v) In a context such as the Nile Delta, where overall efficiency of the irrigation system is already high, there is little scope for addressing water savings at the basin level through infrastructure improvement |
Beschreibung: | 1 Online-Ressource |
DOI: | 10.1596/37906 |
Internformat
MARC
LEADER | 00000nmm a22000001c 4500 | ||
---|---|---|---|
001 | BV049079929 | ||
003 | DE-604 | ||
007 | cr|uuu---uuuuu | ||
008 | 230731s2022 xxu|||| o||u| ||||||eng d | ||
024 | 7 | |a 10.1596/37906 |2 doi | |
035 | |a (ZDB-1-WBA)081885350 | ||
035 | |a (OCoLC)1392144794 | ||
035 | |a (DE-599)KEP081885350 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
044 | |a xxu |c XD-US | ||
049 | |a DE-12 |a DE-521 |a DE-573 |a DE-523 |a DE-Re13 |a DE-19 |a DE-355 |a DE-703 |a DE-91 |a DE-706 |a DE-29 |a DE-M347 |a DE-473 |a DE-824 |a DE-20 |a DE-739 |a DE-1043 |a DE-863 |a DE-862 | ||
110 | 2 | |a World Bank Group |e Verfasser |4 aut | |
245 | 1 | 0 | |a Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project |b Project Performance Assessment Report |
264 | 1 | |a Washington, D.C |b The World Bank |c 2022 | |
300 | |a 1 Online-Ressource | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a Independent Evaluation Group Studies | |
520 | 3 | |a Ratings for the Integrated Irrigation Improvement and Management Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, Bank performance was moderately satisfactory, and Borrow performance was moderately satisfactory. Ratings for the Farm-Level Irrigation Modernization Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, and Bank performance was moderately satisfactory. This assessment offers the following lessons: (i) In irrigation systems, such as the Nile Delta's, that are organized along a hierarchical canal network, irrigation improvement efforts can realize greater impact by applying a systematic approach to rehabilitation, as was done through these two projects, as opposed to addressing different levels of the canal system in isolation. (ii) Efficient implementation of irrigation improvement works requires coordinating and sequencing activities that fall under the mandate of many different entities, which are often beyond the authority of the project implementing agency. (iii) Effecting behavior changes in on-farm water use, agronomic practices, and diversification to higher-value crops requires support beyond improvements to the irrigation water delivery system. (iv) Successfully reforming the institutions that manage irrigation and drainage services, both water users and government agencies, requires greater attention to incentives for collaboration. (v) In a context such as the Nile Delta, where overall efficiency of the irrigation system is already high, there is little scope for addressing water savings at the basin level through infrastructure improvement | |
650 | 4 | |a Agricultural Irrigation and Drainage | |
650 | 4 | |a Agriculture | |
650 | 4 | |a Water Supply | |
856 | 4 | 0 | |u https://doi.org/10.1596/37906 |x Verlag |z kostenfrei |3 Volltext |
912 | |a ZDB-1-WBA | ||
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-034341819 |
Datensatz im Suchindex
_version_ | 1812671838775410688 |
---|---|
adam_text | |
adam_txt | |
any_adam_object | |
any_adam_object_boolean | |
author_corporate | World Bank Group |
author_corporate_role | aut |
author_facet | World Bank Group |
author_sort | World Bank Group |
building | Verbundindex |
bvnumber | BV049079929 |
collection | ZDB-1-WBA |
ctrlnum | (ZDB-1-WBA)081885350 (OCoLC)1392144794 (DE-599)KEP081885350 |
discipline | Wirtschaftswissenschaften |
discipline_str_mv | Wirtschaftswissenschaften |
doi_str_mv | 10.1596/37906 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00000nmm a22000001c 4500</leader><controlfield tag="001">BV049079929</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">230731s2022 xxu|||| o||u| ||||||eng d</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1596/37906</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-1-WBA)081885350</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1392144794</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)KEP081885350</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">xxu</subfield><subfield code="c">XD-US</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-573</subfield><subfield code="a">DE-523</subfield><subfield code="a">DE-Re13</subfield><subfield code="a">DE-19</subfield><subfield code="a">DE-355</subfield><subfield code="a">DE-703</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-706</subfield><subfield code="a">DE-29</subfield><subfield code="a">DE-M347</subfield><subfield code="a">DE-473</subfield><subfield code="a">DE-824</subfield><subfield code="a">DE-20</subfield><subfield code="a">DE-739</subfield><subfield code="a">DE-1043</subfield><subfield code="a">DE-863</subfield><subfield code="a">DE-862</subfield></datafield><datafield tag="110" ind1="2" ind2=" "><subfield code="a">World Bank Group</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project</subfield><subfield code="b">Project Performance Assessment Report</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Washington, D.C</subfield><subfield code="b">The World Bank</subfield><subfield code="c">2022</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Independent Evaluation Group Studies</subfield></datafield><datafield tag="520" ind1="3" ind2=" "><subfield code="a">Ratings for the Integrated Irrigation Improvement and Management Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, Bank performance was moderately satisfactory, and Borrow performance was moderately satisfactory. Ratings for the Farm-Level Irrigation Modernization Project are as follows: Outcome was moderately satisfactory, Risk to development outcome was modest, and Bank performance was moderately satisfactory. This assessment offers the following lessons: (i) In irrigation systems, such as the Nile Delta's, that are organized along a hierarchical canal network, irrigation improvement efforts can realize greater impact by applying a systematic approach to rehabilitation, as was done through these two projects, as opposed to addressing different levels of the canal system in isolation. (ii) Efficient implementation of irrigation improvement works requires coordinating and sequencing activities that fall under the mandate of many different entities, which are often beyond the authority of the project implementing agency. (iii) Effecting behavior changes in on-farm water use, agronomic practices, and diversification to higher-value crops requires support beyond improvements to the irrigation water delivery system. (iv) Successfully reforming the institutions that manage irrigation and drainage services, both water users and government agencies, requires greater attention to incentives for collaboration. (v) In a context such as the Nile Delta, where overall efficiency of the irrigation system is already high, there is little scope for addressing water savings at the basin level through infrastructure improvement</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Agricultural Irrigation and Drainage</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Agriculture</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Water Supply</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1596/37906</subfield><subfield code="x">Verlag</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-WBA</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-034341819</subfield></datafield></record></collection> |
id | DE-604.BV049079929 |
illustrated | Not Illustrated |
index_date | 2024-07-03T22:27:56Z |
indexdate | 2024-10-12T04:02:56Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-034341819 |
oclc_num | 1392144794 |
open_access_boolean | 1 |
owner | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
owner_facet | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
physical | 1 Online-Ressource |
psigel | ZDB-1-WBA |
publishDate | 2022 |
publishDateSearch | 2022 |
publishDateSort | 2022 |
publisher | The World Bank |
record_format | marc |
series2 | Independent Evaluation Group Studies |
spellingShingle | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report Agricultural Irrigation and Drainage Agriculture Water Supply |
title | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_auth | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_exact_search | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_exact_search_txtP | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_full | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_fullStr | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_full_unstemmed | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project Project Performance Assessment Report |
title_short | Arab Republic of Egypt - Integrated Irrigation Improvement and Management Project and Farm-Level Irrigation Modernization Project |
title_sort | arab republic of egypt integrated irrigation improvement and management project and farm level irrigation modernization project project performance assessment report |
title_sub | Project Performance Assessment Report |
topic | Agricultural Irrigation and Drainage Agriculture Water Supply |
topic_facet | Agricultural Irrigation and Drainage Agriculture Water Supply |
url | https://doi.org/10.1596/37906 |
work_keys_str_mv | AT worldbankgroup arabrepublicofegyptintegratedirrigationimprovementandmanagementprojectandfarmlevelirrigationmodernizationprojectprojectperformanceassessmentreport |