TPM: a route to world-class performance
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Oxford
Butterworth-Heinemann
2001
|
Schlagworte: | |
Online-Zugang: | FHI01 Volltext |
Beschreibung: | Includes index Total productive maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. Through TPM, more companies accept the concept of Zero Breakdowns as achievable. From the foundation of zero breakdowns, world class plants are able to run for complete shifts without the need for intervention. TPM is still pushing back the boundaries of what was thought possible. Driven by the proven principles of TPM, the book emphasises the need to build on existing good practices and to win commitment by delivering results. The book provides a practical guide to delivering TPM benefits and is based on the authors' first hand experience of seeing TPM in Japan. It adapts these benefits to suit the strategic needs of companies across four continents. "TPM A Route to World Class Performance" builds on Peter Willmott's earlier book, "TPM the Western Way", updating the scope of applications and tools. The TPM route map is updated to include the journey to zero breakdowns and beyond. It also provides a systematic structure to evolve from the classic Total Productive Maintenance towards Total Productive Manufacturing and deliver a Totally Productive Operation capable of world leading performance |
Beschreibung: | 1 Online-Ressource (xvi, 248 pages) |
ISBN: | 9780080519487 0080519482 9780750644471 0750644478 |
DOI: | 10.1016/B978-0-7506-4447-1.X5000-0 |
Internformat
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV042316074 | ||
003 | DE-604 | ||
005 | 20220728 | ||
007 | cr|uuu---uuuuu | ||
008 | 150129s2001 |||| o||u| ||||||eng d | ||
020 | |a 9780080519487 |c electronic bk. |9 978-0-08-051948-7 | ||
020 | |a 0080519482 |c electronic bk. |9 0-08-051948-2 | ||
020 | |a 9780750644471 |9 978-0-7506-4447-1 | ||
020 | |a 0750644478 |9 0-7506-4447-8 | ||
024 | 7 | |a 10.1016/B978-0-7506-4447-1.X5000-0 |2 doi | |
035 | |a (ZDB-33-EBS)ocn173517813 | ||
035 | |a (OCoLC)173517813 | ||
035 | |a (DE-599)BVBBV042316074 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-1046 |a DE-573 | ||
082 | 0 | |a 658.2/02 |2 22 | |
100 | 1 | |a Willmott, Peter |e Verfasser |4 aut | |
245 | 1 | 0 | |a TPM |b a route to world-class performance |c Peter Willmott and Dennis McCarthy |
264 | 1 | |a Oxford |b Butterworth-Heinemann |c 2001 | |
300 | |a 1 Online-Ressource (xvi, 248 pages) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
500 | |a Includes index | ||
500 | |a Total productive maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. Through TPM, more companies accept the concept of Zero Breakdowns as achievable. From the foundation of zero breakdowns, world class plants are able to run for complete shifts without the need for intervention. TPM is still pushing back the boundaries of what was thought possible. Driven by the proven principles of TPM, the book emphasises the need to build on existing good practices and to win commitment by delivering results. The book provides a practical guide to delivering TPM benefits and is based on the authors' first hand experience of seeing TPM in Japan. It adapts these benefits to suit the strategic needs of companies across four continents. "TPM A Route to World Class Performance" builds on Peter Willmott's earlier book, "TPM the Western Way", updating the scope of applications and tools. The TPM route map is updated to include the journey to zero breakdowns and beyond. It also provides a systematic structure to evolve from the classic Total Productive Maintenance towards Total Productive Manufacturing and deliver a Totally Productive Operation capable of world leading performance | ||
650 | 4 | |a Total productive maintenance. Plant maintenance / Quality control | |
650 | 7 | |a BUSINESS & ECONOMICS / Facility Management |2 bisacsh | |
650 | 7 | |a Plant maintenance / Quality control |2 fast | |
650 | 7 | |a Total productive maintenance |2 fast | |
650 | 4 | |a Wirtschaft | |
650 | 4 | |a Total productive maintenance | |
650 | 4 | |a Plant maintenance |x Quality control | |
650 | 0 | 7 | |a Instandhaltungsplanung |0 (DE-588)4200074-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Lean Production |0 (DE-588)4287302-2 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Lean Production |0 (DE-588)4287302-2 |D s |
689 | 0 | 1 | |a Instandhaltungsplanung |0 (DE-588)4200074-9 |D s |
689 | 0 | |8 1\p |5 DE-604 | |
700 | 1 | |a McCarthy, Dennis |e Sonstige |4 oth | |
856 | 4 | 0 | |u https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0 |x Verlag |3 Volltext |
912 | |a ZDB-33-ESD |a ZDB-33-EBS |a ZDB-33-RER | ||
940 | 1 | |q FAW_PDA_ESD | |
940 | 1 | |q FLA_PDA_ESD | |
999 | |a oai:aleph.bib-bvb.de:BVB01-027753065 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
966 | e | |u https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0 |l FHI01 |p ZDB-33-RER |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804152910988181504 |
---|---|
any_adam_object | |
author | Willmott, Peter |
author_facet | Willmott, Peter |
author_role | aut |
author_sort | Willmott, Peter |
author_variant | p w pw |
building | Verbundindex |
bvnumber | BV042316074 |
collection | ZDB-33-ESD ZDB-33-EBS ZDB-33-RER |
ctrlnum | (ZDB-33-EBS)ocn173517813 (OCoLC)173517813 (DE-599)BVBBV042316074 |
dewey-full | 658.2/02 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.2/02 |
dewey-search | 658.2/02 |
dewey-sort | 3658.2 12 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
doi_str_mv | 10.1016/B978-0-7506-4447-1.X5000-0 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03465nmm a2200577zc 4500</leader><controlfield tag="001">BV042316074</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20220728 </controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">150129s2001 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780080519487</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">978-0-08-051948-7</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0080519482</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">0-08-051948-2</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780750644471</subfield><subfield code="9">978-0-7506-4447-1</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0750644478</subfield><subfield code="9">0-7506-4447-8</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/B978-0-7506-4447-1.X5000-0</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-33-EBS)ocn173517813</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)173517813</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV042316074</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-1046</subfield><subfield code="a">DE-573</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.2/02</subfield><subfield code="2">22</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Willmott, Peter</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">TPM</subfield><subfield code="b">a route to world-class performance</subfield><subfield code="c">Peter Willmott and Dennis McCarthy</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Oxford</subfield><subfield code="b">Butterworth-Heinemann</subfield><subfield code="c">2001</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (xvi, 248 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes index</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Total productive maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. Through TPM, more companies accept the concept of Zero Breakdowns as achievable. From the foundation of zero breakdowns, world class plants are able to run for complete shifts without the need for intervention. TPM is still pushing back the boundaries of what was thought possible. Driven by the proven principles of TPM, the book emphasises the need to build on existing good practices and to win commitment by delivering results. The book provides a practical guide to delivering TPM benefits and is based on the authors' first hand experience of seeing TPM in Japan. It adapts these benefits to suit the strategic needs of companies across four continents. "TPM A Route to World Class Performance" builds on Peter Willmott's earlier book, "TPM the Western Way", updating the scope of applications and tools. The TPM route map is updated to include the journey to zero breakdowns and beyond. It also provides a systematic structure to evolve from the classic Total Productive Maintenance towards Total Productive Manufacturing and deliver a Totally Productive Operation capable of world leading performance</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Total productive maintenance. Plant maintenance / Quality control</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">BUSINESS & ECONOMICS / Facility Management</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Plant maintenance / Quality control</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Total productive maintenance</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Wirtschaft</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Total productive maintenance</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Plant maintenance</subfield><subfield code="x">Quality control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Instandhaltungsplanung</subfield><subfield code="0">(DE-588)4200074-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Lean Production</subfield><subfield code="0">(DE-588)4287302-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Instandhaltungsplanung</subfield><subfield code="0">(DE-588)4200074-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">McCarthy, Dennis</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-33-ESD</subfield><subfield code="a">ZDB-33-EBS</subfield><subfield code="a">ZDB-33-RER</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">FAW_PDA_ESD</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">FLA_PDA_ESD</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-027753065</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0</subfield><subfield code="l">FHI01</subfield><subfield code="p">ZDB-33-RER</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV042316074 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T01:18:14Z |
institution | BVB |
isbn | 9780080519487 0080519482 9780750644471 0750644478 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-027753065 |
oclc_num | 173517813 |
open_access_boolean | |
owner | DE-1046 DE-573 |
owner_facet | DE-1046 DE-573 |
physical | 1 Online-Ressource (xvi, 248 pages) |
psigel | ZDB-33-ESD ZDB-33-EBS ZDB-33-RER FAW_PDA_ESD FLA_PDA_ESD |
publishDate | 2001 |
publishDateSearch | 2001 |
publishDateSort | 2001 |
publisher | Butterworth-Heinemann |
record_format | marc |
spelling | Willmott, Peter Verfasser aut TPM a route to world-class performance Peter Willmott and Dennis McCarthy Oxford Butterworth-Heinemann 2001 1 Online-Ressource (xvi, 248 pages) txt rdacontent c rdamedia cr rdacarrier Includes index Total productive maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. Through TPM, more companies accept the concept of Zero Breakdowns as achievable. From the foundation of zero breakdowns, world class plants are able to run for complete shifts without the need for intervention. TPM is still pushing back the boundaries of what was thought possible. Driven by the proven principles of TPM, the book emphasises the need to build on existing good practices and to win commitment by delivering results. The book provides a practical guide to delivering TPM benefits and is based on the authors' first hand experience of seeing TPM in Japan. It adapts these benefits to suit the strategic needs of companies across four continents. "TPM A Route to World Class Performance" builds on Peter Willmott's earlier book, "TPM the Western Way", updating the scope of applications and tools. The TPM route map is updated to include the journey to zero breakdowns and beyond. It also provides a systematic structure to evolve from the classic Total Productive Maintenance towards Total Productive Manufacturing and deliver a Totally Productive Operation capable of world leading performance Total productive maintenance. Plant maintenance / Quality control BUSINESS & ECONOMICS / Facility Management bisacsh Plant maintenance / Quality control fast Total productive maintenance fast Wirtschaft Total productive maintenance Plant maintenance Quality control Instandhaltungsplanung (DE-588)4200074-9 gnd rswk-swf Lean Production (DE-588)4287302-2 gnd rswk-swf Lean Production (DE-588)4287302-2 s Instandhaltungsplanung (DE-588)4200074-9 s 1\p DE-604 McCarthy, Dennis Sonstige oth https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0 Verlag Volltext 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Willmott, Peter TPM a route to world-class performance Total productive maintenance. Plant maintenance / Quality control BUSINESS & ECONOMICS / Facility Management bisacsh Plant maintenance / Quality control fast Total productive maintenance fast Wirtschaft Total productive maintenance Plant maintenance Quality control Instandhaltungsplanung (DE-588)4200074-9 gnd Lean Production (DE-588)4287302-2 gnd |
subject_GND | (DE-588)4200074-9 (DE-588)4287302-2 |
title | TPM a route to world-class performance |
title_auth | TPM a route to world-class performance |
title_exact_search | TPM a route to world-class performance |
title_full | TPM a route to world-class performance Peter Willmott and Dennis McCarthy |
title_fullStr | TPM a route to world-class performance Peter Willmott and Dennis McCarthy |
title_full_unstemmed | TPM a route to world-class performance Peter Willmott and Dennis McCarthy |
title_short | TPM |
title_sort | tpm a route to world class performance |
title_sub | a route to world-class performance |
topic | Total productive maintenance. Plant maintenance / Quality control BUSINESS & ECONOMICS / Facility Management bisacsh Plant maintenance / Quality control fast Total productive maintenance fast Wirtschaft Total productive maintenance Plant maintenance Quality control Instandhaltungsplanung (DE-588)4200074-9 gnd Lean Production (DE-588)4287302-2 gnd |
topic_facet | Total productive maintenance. Plant maintenance / Quality control BUSINESS & ECONOMICS / Facility Management Plant maintenance / Quality control Total productive maintenance Wirtschaft Plant maintenance Quality control Instandhaltungsplanung Lean Production |
url | https://doi.org/10.1016/B978-0-7506-4447-1.X5000-0 |
work_keys_str_mv | AT willmottpeter tpmaroutetoworldclassperformance AT mccarthydennis tpmaroutetoworldclassperformance |