An analytical method for wind farm electricity market participation and electrical network integration:
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Abschlussarbeit Buch |
Sprache: | English |
Veröffentlicht: |
2014
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | XX, 143 S. Ill., graph. Darst. |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV041779246 | ||
003 | DE-604 | ||
005 | 20140520 | ||
007 | t | ||
008 | 140404s2014 ad|| m||| 00||| eng d | ||
035 | |a (OCoLC)878034159 | ||
035 | |a (DE-599)BVBBV041779246 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a eng | |
049 | |a DE-83 |a DE-91 |a DE-634 | ||
082 | 0 | |a 621.312136 |2 22/ger | |
100 | 1 | |a Abbasi, Ehsan |e Verfasser |0 (DE-588)1049607473 |4 aut | |
245 | 1 | 0 | |a An analytical method for wind farm electricity market participation and electrical network integration |c vorgelegt von Ehsan Abbasi |
264 | 1 | |c 2014 | |
300 | |a XX, 143 S. |b Ill., graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
502 | |a Berlin, Techn. Univ., Diss., 2014 | ||
650 | 0 | 7 | |a Windkraftwerk |0 (DE-588)4128839-7 |2 gnd |9 rswk-swf |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
689 | 0 | 0 | |a Windkraftwerk |0 (DE-588)4128839-7 |D s |
689 | 0 | |5 DE-604 | |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027225098&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-027225098 |
Datensatz im Suchindex
_version_ | 1804152090904231937 |
---|---|
adam_text | CONTENTS
CONTENTS
PREFACE I
ZUSAMMENFASSUNG II
ABSTRACT
HI
LIST OF VARIABLES AND PARAMETERS XIII
LIST OF ACRONYMS XVIII
1 INTRODUCTION 1
2 STATE-OF-THE-ART 4
2.1 CHALLENGES OF WIND FARMS ELECTRICITY MARKET PARTICIPATION 4
2.2 WIND FARMS FORECAST UNCERTAINTY AND RELIABILITY MODELS 6
2.3 CONGESTION MANAGEMENT AND SECURITY CONSTRAINT UNIT COMMITMENT . . 6
2.4 COORDINATED OPERATION 7
2.5 MICROGRID OPERATION 7
2.6 CONTRIBUTIONS OF THE RESEARCH 8
2.7 PUBLISHED PAPERS BASED ON RESEARCH IN THE THESIS 9
3 AN ANALYTICAL METHOD FOR LARGE-SCALE WIND FARM INTE
GRATION IN ELECTRICITY MARKETS AND ELECTRICAL NETWORKS 10
3.1 INTRODUCTION 10
3.2 THE PROPOSED METHOD FOR WIND FARMS ENERGY MARKET PARTICIPATION AND
SECURE NETWORK INTEGRATION 12
3.2.1 OUTLINE OF THE ELECTRICITY MARKET PROPOSED FOR WIND FARMS
PARTICIPATION 12
3.3 OPERATION ALGORITHM FOR THE PROPOSED MARKET MODEL 13
3.3.1 DIFFERENT STRATEGIES FOR MARKET PARTICIPATION OF WIND FARMS IN THE
PROPOSED FRAMEWORK 15
3.3.2 COMPARISON OF THE PROPOSED METHOD OF OPERATION OF WIND FARMS
WITH THE FEED-IN TARIFF MODEL 16
3.4 SIMULATION METHOD OF SYSTEM-WIDE WIND FARM OUTPUT POWER DATA . . 16
3.5 UNIT COMMITMENT FORMULATION 19
3.5.1 RELIABILITY CONSTRAINT 21
3.5.2 EMISSION CONSTRAINT 30
3.5.3 SECURITY CONSTRAINT 31
3.5.4 OBJECTIVE FUNCTION OF THE EMISSION, RELIABILITY, AND SECURITY CON
STRAINED UC 33
3.6 NUMERICAL RESULTS 33
3.6.1 UC RESULTS WITHOUT WIND FARMS AND WITHOUT THE EMISSION CONSTRAINT
34
3.6.2 SIMULATION OF WIND FARM OUTPUT POWER FORECAST 36
IV
HTTP://D-NB.INFO/1050861280
CONTENTS
3.6.3 SIMULATION OF THE TWO-STAGE UC FOR ELECTRICITY MARKET CLEARING ...
37
3.6.4 UC FOR DIFFERENT MARKET SCENARIOS FOR WIND FARMS 39
3.6.5 SIMULATION RESULTS OF THE FIRST UC FOR CASES CI TO C6 40
3.6.6 EFFECTS OF EMISSION FACTOR AND EMISSION CAP ON THE UC RESULTS ...
41
3.6.7 EFFECTS OF THE MAXIMUM ALLOWED
EENS
ON THE UC 43
3.6.8 EFFECTS OF WIND ENERGY PENETRATION ON THE UC RESULTS 44
3.6.9 INCLUSION OF SECURITY CONSTRAINT INTO THE UC: CASE STUDIES AND
DIS
CUSSIONS 45
3.7 CONCLUSIONS 50
4 AN INNOVATIVE EMISSION CONSTRAINT AND WIND POWER MODEL
FOR THE PURPOSE OF PRACTICAL ELECTRICITY MARKET
PARTICIPA
TION OF WIND FARMS 52
4.1 INTRODUCTION 52
4.2 ALGORITHM OF THE INNOVATIVE
UC 54
4.3 WIND FARM GENERATION OUTPUT MODEL AND THE RELIABILITY CONSTRAINT . .
55
4.3.1 SYSTEM-WIDE WIND FARM GENERATION OUTPUT FORECAST UNCERTAINTY MODEL
55
4.3.2 WIND FARMS AVAILABILITY MODEL 60
4.4 INCLUSION OF THE PROPOSED WIND FARM GENERATION OUTPUT MODEL IN THE
RELIABILITY CONSTRAINT 64
4.5 THE DEVELOPED EMISSION CONSTRAINT WITH ADAPTIVE EMISSION CAP ... 65
4.6
UNIT COMMITMENT FORMULATION
66
4.7 NUMERICAL ANALYSIS 68
4.7.1 SIMULATION ASSUMPTIONS 68
4.7.2 SIMULATION OF THE WIND FARM GENERATION OUTPUT MODEL 68
4.7.3 THE SIMULATION RESULTS FOR DIFFERENT WIND PENETRATION CONSID
ERING THE DEVELOPED EMISSION AND RELIABILITY-CONSTRAINED UC . 69
4.7.4 UC RESULTS AT DIFFERENT MAXIMUM ALLOWED EXPECTED ENERGY NOT
SUPPLIED 72
4.7.5 UC RESULTS CONSIDERING DIFFERENT EPC 75
4.7.6 CONCLUSION 76
5 INTEGRATION OF WIND FARMS INTO ELECTRICITY MARKETS THROUGH
COORDINATED OPERATION OF THE VIRTUAL POWER PLANT 78
5.1 INTRODUCTION 78
5.2 THE COORDINATED OPERATION DEDICATED FOR ELECTRICITY MARKET
PARTICIPA
TION OF WIND FARMS THROUGH THE VPP 79
5.3 BIDDING METHOD OF THE VPP: INTERNAL RESERVE DETERMINATION AND OPTI
MAL SCHEDULING BY VPP 83
5.3.1 RESERVE ASSESSMENT BY THE VPP 83
5.3.2 OPTIMIZED VPP SCHEDULING 85
5.4 NUMERICAL ANALYSIS: ELECTRICITY MARKET CLEARING PROCESS IN PRESENCE
OF
THE PROPOSED VPP BY THE INTRODUCED UNIT COMMITMENT METHOD .... 88
5.5 CONCLUSIONS 92
V
CONTENTS
6 ELECTRIC VEHICLES CONTRIBUTION IN PRIMARY CONTROL RESERVE
AND THEIR EFFECT ON ENHANCING WIND INTEGRATION INTO ELEC
TRICAL NETWORKS 94
6.1 INTRODUCTION 94
6.2 SYSTEM DESCRIPTION 95
6.3 EVS AGGREGATION IN THE VPP FOR PRIMARY
CONTROL RESERVE 97
6.4 DYNAMIC SIMULATION OF THE REDUCED EASTERN GERMANY NETWORK AND
CONTRIBUTION OF EVS 98
6.4.1 SCENARIO DEFINITION 98
6.4.2 CASE STUDY A) LOSS OF THE GENERATOR CONNECTED TO BUS 8 AT MEDIUM
WIND AND WITH EVS 99
6.4.3 CASE STUDY B) LOSS OF THE MAJOR AGGREGATED LOAD OF THE SYSTEM CON
NECTED TO BUS 6 AT MEDIUM WIND AND WITH EVS 101
6.4.4 CASE STUDY C) ANALYSIS OF THE EVS RESPONSE DELAY ON PROVIDING
PRI
MARY CONTROL RESERVE 103
6.5 CONCLUSIONS 107
7 OPERATION OF AN URBAN INTEGRATED POWER PARK WITH RE
NEWABLE POWER GENERATION AND BATTERY ENERGY STORAGE 109
7.1 INTRODUCTION 110
7.2 OUTLINE OF THE POWER PARK ILL
7.3 OPERATION OF THE POWER PARK 112
7.3.1 DESCRIPTION OF THE OPTIMIZED OPERATION METHOD 112
7.3.2 AGGREGATED MODEL OF RES 112
7.3.3 RESERVE ASSESSMENT 115
7.3.4 OPTIMIZATION FORMULATION 117
7.4 NUMERICAL RESULTS 119
7.4.1 OPTIMIZED SCHEDULING OF THE POWER PARK 119
7.5 CONCLUSIONS 122
8 THESIS CONCLUSIONS AND FUTURE WORKS 124
8.1 CONCLUSIONS 124
8.2 SUGGESTIONS FOR THE FUTURE WORK 127
A
PRINCIPLES OF THE SOLUTION METHOD
128
A.L INTRODUCTION 128
A.2 SIMULATED ANNEALING PRINCIPLE 128
A.3 SIMULATED ANNEALING ALGORITHM 129
A.3.1 GENERATING AN INITIAL SOLUTION [73] 130
A.3.2 LENGTH OF MARKOV CHAINS [73] 131
A.3.3 COOLING SCHEDULE [73] 131
A.3.4 STOPPING CRITERIA [73] 131
VI
CONTENTS
B SYSTEM PARAMETERS OF IEEE 24-BUS RELIABILITY TEST SYS
TEM (RTS)
132
VII
|
any_adam_object | 1 |
author | Abbasi, Ehsan |
author_GND | (DE-588)1049607473 |
author_facet | Abbasi, Ehsan |
author_role | aut |
author_sort | Abbasi, Ehsan |
author_variant | e a ea |
building | Verbundindex |
bvnumber | BV041779246 |
ctrlnum | (OCoLC)878034159 (DE-599)BVBBV041779246 |
dewey-full | 621.312136 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 621 - Applied physics |
dewey-raw | 621.312136 |
dewey-search | 621.312136 |
dewey-sort | 3621.312136 |
dewey-tens | 620 - Engineering and allied operations |
discipline | Elektrotechnik / Elektronik / Nachrichtentechnik |
format | Thesis Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01293nam a2200325 c 4500</leader><controlfield tag="001">BV041779246</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20140520 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">140404s2014 ad|| m||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)878034159</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV041779246</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-83</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-634</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">621.312136</subfield><subfield code="2">22/ger</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Abbasi, Ehsan</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)1049607473</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">An analytical method for wind farm electricity market participation and electrical network integration</subfield><subfield code="c">vorgelegt von Ehsan Abbasi</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XX, 143 S.</subfield><subfield code="b">Ill., graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="502" ind1=" " ind2=" "><subfield code="a">Berlin, Techn. Univ., Diss., 2014</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Windkraftwerk</subfield><subfield code="0">(DE-588)4128839-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Windkraftwerk</subfield><subfield code="0">(DE-588)4128839-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027225098&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-027225098</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV041779246 |
illustrated | Illustrated |
indexdate | 2024-07-10T01:05:11Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-027225098 |
oclc_num | 878034159 |
open_access_boolean | |
owner | DE-83 DE-91 DE-BY-TUM DE-634 |
owner_facet | DE-83 DE-91 DE-BY-TUM DE-634 |
physical | XX, 143 S. Ill., graph. Darst. |
publishDate | 2014 |
publishDateSearch | 2014 |
publishDateSort | 2014 |
record_format | marc |
spelling | Abbasi, Ehsan Verfasser (DE-588)1049607473 aut An analytical method for wind farm electricity market participation and electrical network integration vorgelegt von Ehsan Abbasi 2014 XX, 143 S. Ill., graph. Darst. txt rdacontent n rdamedia nc rdacarrier Berlin, Techn. Univ., Diss., 2014 Windkraftwerk (DE-588)4128839-7 gnd rswk-swf (DE-588)4113937-9 Hochschulschrift gnd-content Windkraftwerk (DE-588)4128839-7 s DE-604 DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027225098&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Abbasi, Ehsan An analytical method for wind farm electricity market participation and electrical network integration Windkraftwerk (DE-588)4128839-7 gnd |
subject_GND | (DE-588)4128839-7 (DE-588)4113937-9 |
title | An analytical method for wind farm electricity market participation and electrical network integration |
title_auth | An analytical method for wind farm electricity market participation and electrical network integration |
title_exact_search | An analytical method for wind farm electricity market participation and electrical network integration |
title_full | An analytical method for wind farm electricity market participation and electrical network integration vorgelegt von Ehsan Abbasi |
title_fullStr | An analytical method for wind farm electricity market participation and electrical network integration vorgelegt von Ehsan Abbasi |
title_full_unstemmed | An analytical method for wind farm electricity market participation and electrical network integration vorgelegt von Ehsan Abbasi |
title_short | An analytical method for wind farm electricity market participation and electrical network integration |
title_sort | an analytical method for wind farm electricity market participation and electrical network integration |
topic | Windkraftwerk (DE-588)4128839-7 gnd |
topic_facet | Windkraftwerk Hochschulschrift |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=027225098&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT abbasiehsan ananalyticalmethodforwindfarmelectricitymarketparticipationandelectricalnetworkintegration |