Project scheduling with time windows and scarce resources: temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Berlin [u.a.]
Springer
2003
|
Ausgabe: | 2. ed. |
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | Literaturverz. S. 347 - 362 |
Beschreibung: | XIII, 385 S. graph. Darst. |
ISBN: | 3540401253 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV017159510 | ||
003 | DE-604 | ||
005 | 20150401 | ||
007 | t | ||
008 | 030520s2003 gw d||| |||| 00||| eng d | ||
016 | 7 | |a 967572991 |2 DE-101 | |
020 | |a 3540401253 |9 3-540-40125-3 | ||
035 | |a (OCoLC)249470451 | ||
035 | |a (DE-599)BVBBV017159510 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
044 | |a gw |c DE | ||
049 | |a DE-20 |a DE-384 |a DE-91 |a DE-91G | ||
050 | 0 | |a TS157.5 | |
082 | 0 | |a 658.53 | |
084 | |a QH 465 |0 (DE-625)141600: |2 rvk | ||
084 | |a QP 360 |0 (DE-625)141869: |2 rvk | ||
084 | |a WIR 527f |2 stub | ||
084 | |a WIR 760f |2 stub | ||
084 | |a WIR 554f |2 stub | ||
100 | 1 | |a Neumann, Klaus |d 1937- |e Verfasser |0 (DE-588)124187633 |4 aut | |
245 | 1 | 0 | |a Project scheduling with time windows and scarce resources |b temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables |c Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann |
250 | |a 2. ed. | ||
264 | 1 | |a Berlin [u.a.] |b Springer |c 2003 | |
300 | |a XIII, 385 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Literaturverz. S. 347 - 362 | ||
650 | 4 | |a Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie | |
650 | 4 | |a Projektplanung - Optimierung - Nebenbedingung | |
650 | 4 | |a Production scheduling | |
650 | 0 | 7 | |a Optimierung |0 (DE-588)4043664-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Projektplanung |0 (DE-588)4115649-3 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Knappheit |0 (DE-588)4164266-1 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Nebenbedingung |0 (DE-588)4140066-5 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Ressourcen |0 (DE-588)4076675-5 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Mathematisches Modell |0 (DE-588)4114528-8 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Projektplanung |0 (DE-588)4115649-3 |D s |
689 | 0 | 1 | |a Optimierung |0 (DE-588)4043664-0 |D s |
689 | 0 | 2 | |a Nebenbedingung |0 (DE-588)4140066-5 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Ressourcen |0 (DE-588)4076675-5 |D s |
689 | 1 | 1 | |a Knappheit |0 (DE-588)4164266-1 |D s |
689 | 1 | 2 | |a Projektplanung |0 (DE-588)4115649-3 |D s |
689 | 1 | 3 | |a Mathematisches Modell |0 (DE-588)4114528-8 |D s |
689 | 1 | |8 1\p |5 DE-604 | |
700 | 1 | |a Schwindt, Christoph |d 1968- |e Verfasser |0 (DE-588)136166164 |4 aut | |
700 | 1 | |a Zimmermann, Jürgen |d 1962- |e Verfasser |0 (DE-588)122734750 |4 aut | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=010344113&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-010344113 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804130023229095936 |
---|---|
adam_text | Contents
1 Temporal Project Scheduling 1
1.1 Minimum and maximum time lags 1
1.2 Activity on node project networks 6
1.3 Temporal project scheduling computations 9
1.4 Orders in the set of activities 16
2 Resource—Constrained Project Scheduling — Minimization
of Project Duration 21
2.1 Formulation of the problem 24
2.2 Cycle structures in activity on node project networks 27
2.3 Properties of the feasible region 30
2.3.1 Strict orders and order polyhedra 30
2.3.2 Forbidden sets and resolution of resource conflicts ... 34
2.4 Different types of shifts and sets of schedules 38
2.5 Branch and bound and truncated branch and bound methods 45
2.5.1 Enumeration scheme 45
2.5.2 Preprocessing 53
2.5.3 Lower bounds 59
2.5.4 Branch and bound algorithm 62
2.5.5 Truncated branch and bound methods 65
2.5.6 Alternative enumeration schemes 69
2.5.7 Alternative preprocessing and constraint propagation . 71
2.5.8 Alternative lower bounds 74
2.6 Priority rule methods 80
2.6.1 Direct method 81
2.6.2 Decomposition methods 82
2.6.3 Priority rules 83
2.6.4 Serial generation scheme 85
2.6.5 Parallel generation scheme 90
2.7 Schedule improvement procedures 94
2.7.1 Genetic algorithm 95
2.7.2 Tabu search 98
2.8 Experimental performance analysis 101
2.8.1 Random generation of projects 101
2.8.2 Computational experience 105
xii Contents
2.9 Application to make to order production in manufacturing in¬
dustry HI
2.10 Regular objective functions different from project duration . . 117
2.11 Calendarization 120
2.12 Project scheduling with cumulative resources 128
2.12.1 Discrete cumulative resources 129
2.12.2 Continuous cumulative resources 138
2.13 Project scheduling with synchronizing resources 145
2.14 Project scheduling with sequence dependent changeover times 150
2.15 Multi mode project scheduling problems 160
2.15.1 Problem formulation and basic properties 161
2.15.2 Solution methods 167
2.16 Application to batch production in process industries 177
2.16.1 Case study 179
2.16.2 Batching problem 182
2.16.3 Project scheduling model for batch scheduling 186
2.16.4 Solution procedure for batch scheduling 190
3 Resource—Constrained Project Scheduling — Minimization
of General Objective Functions 195
3.1 Different objective functions 197
3.2 Additional types of shifts and sets of schedules 207
3.3 Classification of objective functions 218
3.3.1 Separable and resource utilization dependent
objective functions 219
3.3.2 Class 1 of regular objective functions 221
3.3.3 Class 2 of antiregular objective functions 222
3.3.4. Class 3 of convex objective functions 223
3.3.5 Class 4 of binary monotone objective functions .... 224
3.3.6 Class 5 of quasiconcave objective functions 225
3.3.7 Class 6 of locally regular objective functions 227
3.3.8 Class 7 of locally quasiconcave objective functions . . . 232
3.4 Time complexity of time constrained project scheduling .... 236
3.5 Relaxation based approach for function classes 1 to 5 246
3.5.1 General enumeration scheme 246
3.5.2 Branch and bound algorithm for the net present value
problem 250
3.5.3 Branch and bound algorithm for the
earliness tardiness problem 266
3.6 Tree based approach for function classes 6 and 7 269
3.6.1 General enumeration scheme 270
3.6.2 Branch and bound algorithms for resource investment,
resource levelling, and resource renting problems .... 277
3.6.3 Experimental performance analysis 288
3.6.4 Alternative lower bounds 289
Contents xiii
3.7 Priority rule methods 296
3.7.1 Time constrained project scheduling 296
3.7.2 Resource constrained project scheduling 308
3.7.3 Experimental performance analysis 317
3.8 Schedule improvement procedures 319
3.8.1 Neighborhoods for project scheduling problems .... 319
3.8.2 A tabu search procedure 328
3.9 Application to investment projects 329
3.9.1 Computation of the net present value function 333
3.9.2 Decision support 339
3.10 Hierarchical project planning 342
References 347
List of Symbols 363
Three—Field Classification for Resource Constrained
Project Scheduling 369
Index 373
|
any_adam_object | 1 |
author | Neumann, Klaus 1937- Schwindt, Christoph 1968- Zimmermann, Jürgen 1962- |
author_GND | (DE-588)124187633 (DE-588)136166164 (DE-588)122734750 |
author_facet | Neumann, Klaus 1937- Schwindt, Christoph 1968- Zimmermann, Jürgen 1962- |
author_role | aut aut aut |
author_sort | Neumann, Klaus 1937- |
author_variant | k n kn c s cs j z jz |
building | Verbundindex |
bvnumber | BV017159510 |
callnumber-first | T - Technology |
callnumber-label | TS157 |
callnumber-raw | TS157.5 |
callnumber-search | TS157.5 |
callnumber-sort | TS 3157.5 |
callnumber-subject | TS - Manufactures |
classification_rvk | QH 465 QP 360 |
classification_tum | WIR 527f WIR 760f WIR 554f |
ctrlnum | (OCoLC)249470451 (DE-599)BVBBV017159510 |
dewey-full | 658.53 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.53 |
dewey-search | 658.53 |
dewey-sort | 3658.53 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Arbeitswissenschaften Wirtschaftswissenschaften |
edition | 2. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02815nam a2200649 c 4500</leader><controlfield tag="001">BV017159510</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20150401 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">030520s2003 gw d||| |||| 00||| eng d</controlfield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">967572991</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3540401253</subfield><subfield code="9">3-540-40125-3</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)249470451</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV017159510</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">DE</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-20</subfield><subfield code="a">DE-384</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-91G</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157.5</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.53</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QH 465</subfield><subfield code="0">(DE-625)141600:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 360</subfield><subfield code="0">(DE-625)141869:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">WIR 527f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">WIR 760f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">WIR 554f</subfield><subfield code="2">stub</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Neumann, Klaus</subfield><subfield code="d">1937-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)124187633</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Project scheduling with time windows and scarce resources</subfield><subfield code="b">temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables</subfield><subfield code="c">Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin [u.a.]</subfield><subfield code="b">Springer</subfield><subfield code="c">2003</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XIII, 385 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Literaturverz. S. 347 - 362</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Projektplanung - Optimierung - Nebenbedingung</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektplanung</subfield><subfield code="0">(DE-588)4115649-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Knappheit</subfield><subfield code="0">(DE-588)4164266-1</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Nebenbedingung</subfield><subfield code="0">(DE-588)4140066-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Ressourcen</subfield><subfield code="0">(DE-588)4076675-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Projektplanung</subfield><subfield code="0">(DE-588)4115649-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Optimierung</subfield><subfield code="0">(DE-588)4043664-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Nebenbedingung</subfield><subfield code="0">(DE-588)4140066-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Ressourcen</subfield><subfield code="0">(DE-588)4076675-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Knappheit</subfield><subfield code="0">(DE-588)4164266-1</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="2"><subfield code="a">Projektplanung</subfield><subfield code="0">(DE-588)4115649-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="3"><subfield code="a">Mathematisches Modell</subfield><subfield code="0">(DE-588)4114528-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Schwindt, Christoph</subfield><subfield code="d">1968-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)136166164</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Zimmermann, Jürgen</subfield><subfield code="d">1962-</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)122734750</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=010344113&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-010344113</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
id | DE-604.BV017159510 |
illustrated | Illustrated |
indexdate | 2024-07-09T19:14:26Z |
institution | BVB |
isbn | 3540401253 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-010344113 |
oclc_num | 249470451 |
open_access_boolean | |
owner | DE-20 DE-384 DE-91 DE-BY-TUM DE-91G DE-BY-TUM |
owner_facet | DE-20 DE-384 DE-91 DE-BY-TUM DE-91G DE-BY-TUM |
physical | XIII, 385 S. graph. Darst. |
publishDate | 2003 |
publishDateSearch | 2003 |
publishDateSort | 2003 |
publisher | Springer |
record_format | marc |
spelling | Neumann, Klaus 1937- Verfasser (DE-588)124187633 aut Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann 2. ed. Berlin [u.a.] Springer 2003 XIII, 385 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Literaturverz. S. 347 - 362 Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie Projektplanung - Optimierung - Nebenbedingung Production scheduling Optimierung (DE-588)4043664-0 gnd rswk-swf Projektplanung (DE-588)4115649-3 gnd rswk-swf Knappheit (DE-588)4164266-1 gnd rswk-swf Nebenbedingung (DE-588)4140066-5 gnd rswk-swf Ressourcen (DE-588)4076675-5 gnd rswk-swf Mathematisches Modell (DE-588)4114528-8 gnd rswk-swf Projektplanung (DE-588)4115649-3 s Optimierung (DE-588)4043664-0 s Nebenbedingung (DE-588)4140066-5 s DE-604 Ressourcen (DE-588)4076675-5 s Knappheit (DE-588)4164266-1 s Mathematisches Modell (DE-588)4114528-8 s 1\p DE-604 Schwindt, Christoph 1968- Verfasser (DE-588)136166164 aut Zimmermann, Jürgen 1962- Verfasser (DE-588)122734750 aut HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=010344113&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Neumann, Klaus 1937- Schwindt, Christoph 1968- Zimmermann, Jürgen 1962- Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie Projektplanung - Optimierung - Nebenbedingung Production scheduling Optimierung (DE-588)4043664-0 gnd Projektplanung (DE-588)4115649-3 gnd Knappheit (DE-588)4164266-1 gnd Nebenbedingung (DE-588)4140066-5 gnd Ressourcen (DE-588)4076675-5 gnd Mathematisches Modell (DE-588)4114528-8 gnd |
subject_GND | (DE-588)4043664-0 (DE-588)4115649-3 (DE-588)4164266-1 (DE-588)4140066-5 (DE-588)4076675-5 (DE-588)4114528-8 |
title | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables |
title_auth | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables |
title_exact_search | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables |
title_full | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann |
title_fullStr | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann |
title_full_unstemmed | Project scheduling with time windows and scarce resources temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables Klaus Neumann ; Christoph Schwindt ; Jürgen Zimmermann |
title_short | Project scheduling with time windows and scarce resources |
title_sort | project scheduling with time windows and scarce resources temporal and resource constrained project scheduling with regular and nonregular objective functions with 60 tables |
title_sub | temporal and resource-constrained project scheduling with regular and nonregular objective functions ; with 60 tables |
topic | Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie Projektplanung - Optimierung - Nebenbedingung Production scheduling Optimierung (DE-588)4043664-0 gnd Projektplanung (DE-588)4115649-3 gnd Knappheit (DE-588)4164266-1 gnd Nebenbedingung (DE-588)4140066-5 gnd Ressourcen (DE-588)4076675-5 gnd Mathematisches Modell (DE-588)4114528-8 gnd |
topic_facet | Projektmanagement / Scheduling-Verfahren / Bottleneck / Betriebliche Terminplanung / Multikriteria-Verfahren / Theorie Projektplanung - Optimierung - Nebenbedingung Production scheduling Optimierung Projektplanung Knappheit Nebenbedingung Ressourcen Mathematisches Modell |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=010344113&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT neumannklaus projectschedulingwithtimewindowsandscarceresourcestemporalandresourceconstrainedprojectschedulingwithregularandnonregularobjectivefunctionswith60tables AT schwindtchristoph projectschedulingwithtimewindowsandscarceresourcestemporalandresourceconstrainedprojectschedulingwithregularandnonregularobjectivefunctionswith60tables AT zimmermannjurgen projectschedulingwithtimewindowsandscarceresourcestemporalandresourceconstrainedprojectschedulingwithregularandnonregularobjectivefunctionswith60tables |