Gaining control: capacity management and scheduling
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
New York, NY [u.a.]
Wiley
1999
|
Ausgabe: | 2. ed. |
Schriftenreihe: | Oliver Wight manufacturing series
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | XIV, 270 S. graph. Darst. |
ISBN: | 0471291676 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV014009978 | ||
003 | DE-604 | ||
005 | 20011116 | ||
007 | t | ||
008 | 011116s1999 d||| |||| 00||| eng d | ||
020 | |a 0471291676 |9 0-471-29167-6 | ||
035 | |a (OCoLC)39360803 | ||
035 | |a (DE-599)BVBBV014009978 | ||
040 | |a DE-604 |b ger |e rakwb | ||
041 | 0 | |a eng | |
049 | |a DE-N2 |a DE-634 |a DE-83 | ||
050 | 0 | |a TS157.5 | |
082 | 0 | |a 658.5/3 |2 21 | |
084 | |a QP 542 |0 (DE-625)141900: |2 rvk | ||
100 | 1 | |a Correll, James G. |e Verfasser |4 aut | |
245 | 1 | 0 | |a Gaining control |b capacity management and scheduling |c James G. Correll ; Norris W. Edson |
250 | |a 2. ed. | ||
264 | 1 | |a New York, NY [u.a.] |b Wiley |c 1999 | |
300 | |a XIV, 270 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 0 | |a Oliver Wight manufacturing series | |
650 | 4 | |a Industrial capacity |x Management | |
650 | 4 | |a Just-in-time systems | |
650 | 4 | |a Manufacturing resource planning | |
650 | 4 | |a Production scheduling | |
650 | 0 | 7 | |a Fertigungsplanung |0 (DE-588)4113545-3 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Fertigungsplanung |0 (DE-588)4113545-3 |D s |
689 | 0 | |5 DE-604 | |
700 | 1 | |a Edson, Norris W. |e Verfasser |4 aut | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-009592010 |
Datensatz im Suchindex
_version_ | 1804128866806005760 |
---|---|
adam_text | Contents
Acknowledgments vii
Introduction ix
Cast of Characters xiii
Chapter One
Out of Control 1
Chapter Two
Constructing Routings and Work Centers 13
Chapter Three
Mastering Dispatching and Scheduling 41
Chapter Four
Understanding Capacity Planning 91
Chapter Five
Controlling the Flow of Work 139
Chapter Six
Scheduling to Capacity Constraints 163
Chapter Seven
Applying Rough Cut Capacity Planning 189
Chapter Eight
Joining Forces 213
vi Contents
Chapter Nine
Continuous Improvement 223
Chapter Ten
Moving Ahead 249
Notes 263
Index 265
|
any_adam_object | 1 |
author | Correll, James G. Edson, Norris W. |
author_facet | Correll, James G. Edson, Norris W. |
author_role | aut aut |
author_sort | Correll, James G. |
author_variant | j g c jg jgc n w e nw nwe |
building | Verbundindex |
bvnumber | BV014009978 |
callnumber-first | T - Technology |
callnumber-label | TS157 |
callnumber-raw | TS157.5 |
callnumber-search | TS157.5 |
callnumber-sort | TS 3157.5 |
callnumber-subject | TS - Manufactures |
classification_rvk | QP 542 |
ctrlnum | (OCoLC)39360803 (DE-599)BVBBV014009978 |
dewey-full | 658.5/3 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5/3 |
dewey-search | 658.5/3 |
dewey-sort | 3658.5 13 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | 2. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01542nam a2200421 c 4500</leader><controlfield tag="001">BV014009978</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20011116 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">011116s1999 d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0471291676</subfield><subfield code="9">0-471-29167-6</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)39360803</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV014009978</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-N2</subfield><subfield code="a">DE-634</subfield><subfield code="a">DE-83</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157.5</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/3</subfield><subfield code="2">21</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Correll, James G.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Gaining control</subfield><subfield code="b">capacity management and scheduling</subfield><subfield code="c">James G. Correll ; Norris W. Edson</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">New York, NY [u.a.]</subfield><subfield code="b">Wiley</subfield><subfield code="c">1999</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XIV, 270 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Oliver Wight manufacturing series</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial capacity</subfield><subfield code="x">Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Just-in-time systems</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Manufacturing resource planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungsplanung</subfield><subfield code="0">(DE-588)4113545-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Fertigungsplanung</subfield><subfield code="0">(DE-588)4113545-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Edson, Norris W.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-009592010</subfield></datafield></record></collection> |
id | DE-604.BV014009978 |
illustrated | Illustrated |
indexdate | 2024-07-09T18:56:03Z |
institution | BVB |
isbn | 0471291676 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-009592010 |
oclc_num | 39360803 |
open_access_boolean | |
owner | DE-N2 DE-634 DE-83 |
owner_facet | DE-N2 DE-634 DE-83 |
physical | XIV, 270 S. graph. Darst. |
publishDate | 1999 |
publishDateSearch | 1999 |
publishDateSort | 1999 |
publisher | Wiley |
record_format | marc |
series2 | Oliver Wight manufacturing series |
spelling | Correll, James G. Verfasser aut Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson 2. ed. New York, NY [u.a.] Wiley 1999 XIV, 270 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Oliver Wight manufacturing series Industrial capacity Management Just-in-time systems Manufacturing resource planning Production scheduling Fertigungsplanung (DE-588)4113545-3 gnd rswk-swf Fertigungsplanung (DE-588)4113545-3 s DE-604 Edson, Norris W. Verfasser aut HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Correll, James G. Edson, Norris W. Gaining control capacity management and scheduling Industrial capacity Management Just-in-time systems Manufacturing resource planning Production scheduling Fertigungsplanung (DE-588)4113545-3 gnd |
subject_GND | (DE-588)4113545-3 |
title | Gaining control capacity management and scheduling |
title_auth | Gaining control capacity management and scheduling |
title_exact_search | Gaining control capacity management and scheduling |
title_full | Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson |
title_fullStr | Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson |
title_full_unstemmed | Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson |
title_short | Gaining control |
title_sort | gaining control capacity management and scheduling |
title_sub | capacity management and scheduling |
topic | Industrial capacity Management Just-in-time systems Manufacturing resource planning Production scheduling Fertigungsplanung (DE-588)4113545-3 gnd |
topic_facet | Industrial capacity Management Just-in-time systems Manufacturing resource planning Production scheduling Fertigungsplanung |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT correlljamesg gainingcontrolcapacitymanagementandscheduling AT edsonnorrisw gainingcontrolcapacitymanagementandscheduling |