Analysis and control of production systems:
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
Englewood Cliffs, NJ
Prentice Hall
1994
|
Ausgabe: | 2. ed. |
Schriftenreihe: | Prentice Hall international series in industrial and systems engineering
|
Schlagworte: | |
Online-Zugang: | Inhaltsverzeichnis |
Beschreibung: | XIV, 450 S. graph. Darst. |
ISBN: | 0130787590 |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV010041696 | ||
003 | DE-604 | ||
005 | 20150128 | ||
007 | t | ||
008 | 950214s1994 d||| |||| 00||| eng d | ||
020 | |a 0130787590 |9 0-13-078759-0 | ||
035 | |a (OCoLC)28586599 | ||
035 | |a (DE-599)BVBBV010041696 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-703 |a DE-473 |a DE-634 | ||
050 | 0 | |a T56 | |
082 | 0 | |a 658.5 |2 20 | |
084 | |a QP 500 |0 (DE-625)141894: |2 rvk | ||
084 | |a QP 540 |0 (DE-625)141899: |2 rvk | ||
100 | 1 | |a Elsayed, Elsayed A. |e Verfasser |0 (DE-588)170074153 |4 aut | |
245 | 1 | 0 | |a Analysis and control of production systems |c Elsayed A. Elsayed ; Thomas O. Boucher |
250 | |a 2. ed. | ||
264 | 1 | |a Englewood Cliffs, NJ |b Prentice Hall |c 1994 | |
300 | |a XIV, 450 S. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
490 | 0 | |a Prentice Hall international series in industrial and systems engineering | |
650 | 4 | |a Industrial engineering | |
650 | 4 | |a Production control | |
650 | 0 | 7 | |a Fertigungskontrolle |0 (DE-588)4016901-7 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigungssystem |0 (DE-588)4154150-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionssystem |0 (DE-588)4138914-1 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Management |0 (DE-588)4037278-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktion |0 (DE-588)4047347-8 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Produktion |0 (DE-588)4047347-8 |D s |
689 | 0 | 1 | |a Management |0 (DE-588)4037278-9 |D s |
689 | 0 | |5 DE-604 | |
689 | 1 | 0 | |a Produktionssystem |0 (DE-588)4138914-1 |D s |
689 | 1 | |5 DE-604 | |
689 | 2 | 0 | |a Fertigungssystem |0 (DE-588)4154150-9 |D s |
689 | 2 | |8 1\p |5 DE-604 | |
689 | 3 | 0 | |a Fertigungskontrolle |0 (DE-588)4016901-7 |D s |
689 | 3 | |8 2\p |5 DE-604 | |
700 | 1 | |a Boucher, Thomas O. |e Verfasser |4 aut | |
856 | 4 | 2 | |m HBZ Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006659509&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
999 | |a oai:aleph.bib-bvb.de:BVB01-006659509 | ||
883 | 1 | |8 1\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk | |
883 | 1 | |8 2\p |a cgwrk |d 20201028 |q DE-101 |u https://d-nb.info/provenance/plan#cgwrk |
Datensatz im Suchindex
_version_ | 1804124423972716544 |
---|---|
adam_text | CONTENTS
Preface xiii
1 Introduction 1
1.1 The Production System, 1
1.2 Production System Analysis, 2
1.3 The Information Base, 3
1.4 Organization of this Book, 4
References, 6
2 Forecasting and Time series Analysis 7
2.1 Introduction, 7
2.2 Forecasting, 8
2.3 Forecasting Procedures Versus Curve Fitting, 9
2.3.1 Gregory Newton Interpolation Formulas, 9
2.4 Regression Methods, 12
2.4.1 Simple Linear Regression, 12
2.4.2 Multiple Linear Regression, 17
2.4.3 Linear Regression and Nonlinear Functions, 19
2.4.4 Correlation, 22
2.5 Moving average Method, 26
2.5.1 Simple Moving Average, 26
2.5.2 Choosing the Best Model, 29
2.5.3 Moving Average with Trend, 30
2.6 Exponential Smoothing, 33
2.6.1 Simple Exponential Smoothing, 33
2.6.2 Double Exponential Smoothing, 36
2.6.3 Choice of a, 39
2.7 Winters s Method for Seasonal Variation, 39
2.8 Box Jenkins Methods, 44
2.8.1 Autoregressive Model, 44
2.8.2 Moving average Model, 47
vii
viii / Contents
2.8.3 Mixed Autoregressive Moving average Model, 49
2.8.4 Forecasting Using the Box Jenkins Models, 50
2.9 Forecasting Errors and Tracking Signals, 50
2.10 Summary, 53
Problems, 53
References, 61
3 Inventory Systems 63
3.1 Introduction, 63
3.2 Inventory Costs, 64
3.2.1 Inventory Carrying Costs, 64
3.2.2 Shortage Costs, 64
3.2.3 Ordering Costs, 64
3.3 Terminology of Inventory Systems, 64
3.3.1 Demand, 64
3.3.2 Lead Time and Replenishment Rate, 65
3.3.3 Reorder Level, 65
3.3.4 Safety Stock, 66
3.4 Inventory Policies, 66
3.4.1 Periodic review Policy, 67
3.4.2 Order up to R Policy, 67
3.4.3 Continuous review Policy, 68
3.4.4 Fixed reorder Quantity Policy, 68
3.4.5 Base stock Policy, 68
3.5 Demand Characteristics and Inventory Models, 69
3.6 Analysis of Static Deterministic Inventory Models, 69
3.6.1 Single product Model, 70
3.6.2 Sensitivity Analysis, 76
3.6.3 Quantity Discount, 77
3.6.4 Multiitem Inventory Systems with Constraints, 79
3.7 Analysis of Probabilistic Inventory Models, 86
3.7.1 Continuous review Model: Backorder Case, 87
3.7.2 Continuous review Model: Lost Sales Case, 93
3.7.3 Periodic review Model, 95
3.7.4 Safety Stocks and Service Levels, 100
3.7.5 Approximate Solutions for High Service Levels, 107
3.7.6 Variability in Lead time Demand, 109
3.7.7 Single period Models, 110
3.8 Inventory System Control Practices, 115
3.8.1 ABC Classification System, 116
3.8.2 Exchange Curves, 119
3.9 Extensions of Inventory Models, 123
3.10 Summary, 124
Problems, 124
References, 132
Contents I ix
4 Aggregate Production Planning 134
4.1 Purpose of Aggregate Production Planning, 134
4.2 Simple Network Model with Linear Production and
Inventory Cost, 135
4.2.1 Production Plan Disaggregation, 139
4.3 Linear Production Planning Models: Changing Work force
Levels and Backlogging, 141
4.4 Disaggregation of an Aggregate Plan, 145
4.4.1 Constant Production and Demand Rates, 146
4.4.2 Time varying Production and Demand Rates, 153
4.5 Quadratic Cost Model, 159
4.6 Dynamic Programming Production Planning Models, 163
4.6.1 Backlogging Prohibited, 163
4.6.2 Backlogging Allowed, 167
4.7 Summary, 170
Problems, 171
References, 177
5 Material Requirements Planning 179
5.1 Introduction, 179
5.2 Parts Explosion Requirements, 181
5.3 Computing Direct Dependent Demand, 183
5.4 Computing Total Requirements, 185
5.5 Computing Requirements Using Submatrix Structure, 188
5.6 Engineering Changes, 190
5.7 Material Requirements Planning System, 191
5.8 Lot Sizing, 197
5.9 MRP Versus MRP II, 202
5.9.1 Rough cut Capacity Planning, 202
5.9.2 Capacity Requirements Planning, 203
5.9.3 Shop Floor Control, 203
5.10 Software Structure of MRP, 203
5.10.1 MRP II Capacity Requirements Planning Illustrated, 206
5.10.2 Database Implementation of MRP, 214
5.11 Replanning Frequency in MRP, 216
5.12 Current MRP Research, 217
5.13 Summary, 217
Problems, 218
References, 228
6 Project Planning and Scheduling 230
6.1 Introduction, 230
6.2 Project Planning and Scheduling: Unlimited Resources, 231
x / Contents
6.2.1 CPM: Background, 231
6.2.2 PERT: Background, 231
6.2.3 Use of CPM/PERT in Industry, 231
6.2.4 Construction of Project Networks, 232
6.2.5 Common Errors in Network Construction, 234
6.2.6 Checking the Consistency of Precedence Relationships, 236
6.2.7 Critical Path Algorithm, 238
6.2.8 Linear Programming Formulation, 244
6.2.9 Cost Models, 246
6.2.10 Program Evaluation and Review Technique, 249
6.2.11 Limitations of PERT and/or CPM, 252
6.3 Project Planning and Scheduling: Limited Resources, 253
6.3.1 ROT Algorithm, 253
6.3.2 ACTIM Criterion, 257
6.3.3 ACTRES and TIMRES Criteria, 258
6.3.4 Modification of the TIMRES Criterion: GENRES, 259
6.3.5 Modification of ROT (ROT ACTIM, ROT ACTRES), 261
6.3.6 TMROS, 261
6.3.7 TG2, 263
6.3.8 Performance of the Algorithms, 264
6.3.9 Other Scheduling Priorities, 264
6.3.10 Precedence Diagram Method, 266
6.3.11 Multiple project, Multiple resource Algorithm, 266
6.4 Line of Balance, 272
6.5 Summary, 277
Problems, 277
References, 287
7 Job Sequencing and Operations Scheduling 290
7.1 Introduction, 290
7.2 Job Sequencing, 290
7.3 n Jobs, One Machine, 294
7.3.1 n Jobs, One Machine: MFT, 294
7.3.2 n Jobs, One Machine: Common Due Date, 297
7.3.3 n Jobs, One Machine: Different Due Dates, 299
7.3.4 n Jobs, One Machine: Minimization of
Earliness and Tardiness, 303
7.4 n Jobs, Two Machines, 307
7.5 n Jobs, Three Machines, 310
7.5.1 Johnson s Algorithm for n Jobs, Three Machines, 310
7.5.2 Branch and bound Algorithm. 312
7.6 Two Jobs. M Machines, 317
7.7 n Jobs, M Machines, 319
7.7.1 Campbell et al. Algorithm, 319
7.7.2 Stinson Smith Algorithm, 321
7.7.3 Shifting Bottleneck Procedure, 326
Contents I xi
7.8 Sequencing Jobs on Parallel Machines, 327
7.8.1 Kaspi Montreuil Algorithm: Machine Availability, 328
7.8.2 Parallel Machines: Mean Tardiness, 330
7.9 Minimization of Setup Costs: Traveling Salesman Problem, 336
7.10 Job shop Scheduling, 342
7.11 Assembly line Balancing, 344
7.11.1 Definitions, 345
7.11.2 Mathematical Programming Formulation, 346
7.11.3 Kilbridge Wester Heuristic, 353
7.11.4 Moodie Young Method, 357
7.11.5 Helgeson Birnie Method or Positional weight Technique, 360
7.11.6 Immediate Update First fit Heuristic, 362
7.11.7 Rank and assign Heuristic, 364
7.12 Probabilistic Assembly line Balancing, 366
7.12.1 Method 1: Probability Distribution Is Normal, 366
7.12.2 Method 2: Distribution Free, 367
7.13 Automatic Transfer Lines, 370
7.14 Synchronized Production Lines, 373
7.14.1 Two machine Synchronous Systems, 374
7.15 Summary, 384
Problems, 384
References, 400
8 New Directions in Batch and Discrete parts Production
Systems 403
8.1 Introduction, 403
8.2 Group Technology, 403
8.2.1 Lot Sizing under Group Technology, 408
8.2.2 Operations Scheduling under Group Technology, 410
8.2.3 Some Issues in the Implementation of Group Technology, 411
8.3 Push and Pull Production Systems, 412
8.3.1 Analysis of Pull and Push Serial Production Lines, 413
8.3.2 Controllability Issues in Pull and Push Production Lines, 416
8.4 Kanban Production Systems, 417
8.4.1 Computing the Number of Kanbans, 421
8.4.2 Some Issues in the Implementation of Kanban, 422
8.5 Flexible Manufacturing Systems: An Introduction, 423
8.5.1 FMS Concept, 423
8.5.2 Implementations of FMS, 424
8.5.3 Range of Applications, 425
8.5.4 Integration of Design, Planning, and Production Control, 425
8.5.5 FMS and Computer integrated Manufacturing Systems. 426
8.5.6 Production Control in the Automated Factory. 431
8.6 Summary, 433
Problems, 433
References, 435
xii / Contents
Appendix A: Proof of Equation (3.71) 438
Appendix B: Tables of Standard Normal Distribution and t
Distribution 440
Appendix C: Table of the Loss Integral for a Standard Normal
Distribution 443
Index 444
|
any_adam_object | 1 |
author | Elsayed, Elsayed A. Boucher, Thomas O. |
author_GND | (DE-588)170074153 |
author_facet | Elsayed, Elsayed A. Boucher, Thomas O. |
author_role | aut aut |
author_sort | Elsayed, Elsayed A. |
author_variant | e a e ea eae t o b to tob |
building | Verbundindex |
bvnumber | BV010041696 |
callnumber-first | T - Technology |
callnumber-label | T56 |
callnumber-raw | T56 |
callnumber-search | T56 |
callnumber-sort | T 256 |
callnumber-subject | T - General Technology |
classification_rvk | QP 500 QP 540 |
ctrlnum | (OCoLC)28586599 (DE-599)BVBBV010041696 |
dewey-full | 658.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.5 |
dewey-search | 658.5 |
dewey-sort | 3658.5 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
edition | 2. ed. |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02274nam a2200565 c 4500</leader><controlfield tag="001">BV010041696</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20150128 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">950214s1994 d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0130787590</subfield><subfield code="9">0-13-078759-0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)28586599</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV010041696</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield><subfield code="a">DE-473</subfield><subfield code="a">DE-634</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">T56</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5</subfield><subfield code="2">20</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 500</subfield><subfield code="0">(DE-625)141894:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 540</subfield><subfield code="0">(DE-625)141899:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Elsayed, Elsayed A.</subfield><subfield code="e">Verfasser</subfield><subfield code="0">(DE-588)170074153</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Analysis and control of production systems</subfield><subfield code="c">Elsayed A. Elsayed ; Thomas O. Boucher</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Englewood Cliffs, NJ</subfield><subfield code="b">Prentice Hall</subfield><subfield code="c">1994</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XIV, 450 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Prentice Hall international series in industrial and systems engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungskontrolle</subfield><subfield code="0">(DE-588)4016901-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Management</subfield><subfield code="0">(DE-588)4037278-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktion</subfield><subfield code="0">(DE-588)4047347-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Produktion</subfield><subfield code="0">(DE-588)4047347-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Management</subfield><subfield code="0">(DE-588)4037278-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Produktionssystem</subfield><subfield code="0">(DE-588)4138914-1</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="3" ind2="0"><subfield code="a">Fertigungskontrolle</subfield><subfield code="0">(DE-588)4016901-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2=" "><subfield code="8">2\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Boucher, Thomas O.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006659509&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-006659509</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">2\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield></record></collection> |
id | DE-604.BV010041696 |
illustrated | Illustrated |
indexdate | 2024-07-09T17:45:26Z |
institution | BVB |
isbn | 0130787590 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-006659509 |
oclc_num | 28586599 |
open_access_boolean | |
owner | DE-703 DE-473 DE-BY-UBG DE-634 |
owner_facet | DE-703 DE-473 DE-BY-UBG DE-634 |
physical | XIV, 450 S. graph. Darst. |
publishDate | 1994 |
publishDateSearch | 1994 |
publishDateSort | 1994 |
publisher | Prentice Hall |
record_format | marc |
series2 | Prentice Hall international series in industrial and systems engineering |
spelling | Elsayed, Elsayed A. Verfasser (DE-588)170074153 aut Analysis and control of production systems Elsayed A. Elsayed ; Thomas O. Boucher 2. ed. Englewood Cliffs, NJ Prentice Hall 1994 XIV, 450 S. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Prentice Hall international series in industrial and systems engineering Industrial engineering Production control Fertigungskontrolle (DE-588)4016901-7 gnd rswk-swf Fertigungssystem (DE-588)4154150-9 gnd rswk-swf Produktionssystem (DE-588)4138914-1 gnd rswk-swf Management (DE-588)4037278-9 gnd rswk-swf Produktion (DE-588)4047347-8 gnd rswk-swf Produktion (DE-588)4047347-8 s Management (DE-588)4037278-9 s DE-604 Produktionssystem (DE-588)4138914-1 s Fertigungssystem (DE-588)4154150-9 s 1\p DE-604 Fertigungskontrolle (DE-588)4016901-7 s 2\p DE-604 Boucher, Thomas O. Verfasser aut HBZ Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006659509&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis 1\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk 2\p cgwrk 20201028 DE-101 https://d-nb.info/provenance/plan#cgwrk |
spellingShingle | Elsayed, Elsayed A. Boucher, Thomas O. Analysis and control of production systems Industrial engineering Production control Fertigungskontrolle (DE-588)4016901-7 gnd Fertigungssystem (DE-588)4154150-9 gnd Produktionssystem (DE-588)4138914-1 gnd Management (DE-588)4037278-9 gnd Produktion (DE-588)4047347-8 gnd |
subject_GND | (DE-588)4016901-7 (DE-588)4154150-9 (DE-588)4138914-1 (DE-588)4037278-9 (DE-588)4047347-8 |
title | Analysis and control of production systems |
title_auth | Analysis and control of production systems |
title_exact_search | Analysis and control of production systems |
title_full | Analysis and control of production systems Elsayed A. Elsayed ; Thomas O. Boucher |
title_fullStr | Analysis and control of production systems Elsayed A. Elsayed ; Thomas O. Boucher |
title_full_unstemmed | Analysis and control of production systems Elsayed A. Elsayed ; Thomas O. Boucher |
title_short | Analysis and control of production systems |
title_sort | analysis and control of production systems |
topic | Industrial engineering Production control Fertigungskontrolle (DE-588)4016901-7 gnd Fertigungssystem (DE-588)4154150-9 gnd Produktionssystem (DE-588)4138914-1 gnd Management (DE-588)4037278-9 gnd Produktion (DE-588)4047347-8 gnd |
topic_facet | Industrial engineering Production control Fertigungskontrolle Fertigungssystem Produktionssystem Management Produktion |
url | http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=006659509&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT elsayedelsayeda analysisandcontrolofproductionsystems AT boucherthomaso analysisandcontrolofproductionsystems |