Multiple resource-constrained project scheduling: a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Buch |
Sprache: | English |
Veröffentlicht: |
1990
|
Schlagworte: | |
Beschreibung: | Iowa City, Iowa, Univ. of Iowa, Diss. |
Beschreibung: | VIII, 109 S. |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV009002096 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | t | ||
008 | 940206s1990 m||| 00||| eng d | ||
035 | |a (OCoLC)26689926 | ||
035 | |a (DE-599)BVBBV009002096 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
049 | |a DE-29T | ||
100 | 1 | |a Park, Kwangho |e Verfasser |4 aut | |
245 | 1 | 0 | |a Multiple resource-constrained project scheduling |b a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |c by Kwangho Park |
264 | 1 | |c 1990 | |
300 | |a VIII, 109 S. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
500 | |a Iowa City, Iowa, Univ. of Iowa, Diss. | ||
650 | 4 | |a Flexible manufacturing systems | |
650 | 4 | |a Production control | |
650 | 4 | |a Production scheduling | |
655 | 7 | |0 (DE-588)4113937-9 |a Hochschulschrift |2 gnd-content | |
999 | |a oai:aleph.bib-bvb.de:BVB01-005950023 |
Datensatz im Suchindex
_version_ | 1804123348323532800 |
---|---|
any_adam_object | |
author | Park, Kwangho |
author_facet | Park, Kwangho |
author_role | aut |
author_sort | Park, Kwangho |
author_variant | k p kp |
building | Verbundindex |
bvnumber | BV009002096 |
ctrlnum | (OCoLC)26689926 (DE-599)BVBBV009002096 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01001nam a2200301 c 4500</leader><controlfield tag="001">BV009002096</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">940206s1990 m||| 00||| eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)26689926</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV009002096</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-29T</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Park, Kwangho</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Multiple resource-constrained project scheduling</subfield><subfield code="b">a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system</subfield><subfield code="c">by Kwangho Park</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">1990</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">VIII, 109 S.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Iowa City, Iowa, Univ. of Iowa, Diss.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Flexible manufacturing systems</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production control</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="655" ind1=" " ind2="7"><subfield code="0">(DE-588)4113937-9</subfield><subfield code="a">Hochschulschrift</subfield><subfield code="2">gnd-content</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-005950023</subfield></datafield></record></collection> |
genre | (DE-588)4113937-9 Hochschulschrift gnd-content |
genre_facet | Hochschulschrift |
id | DE-604.BV009002096 |
illustrated | Not Illustrated |
indexdate | 2024-07-09T17:28:20Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-005950023 |
oclc_num | 26689926 |
open_access_boolean | |
owner | DE-29T |
owner_facet | DE-29T |
physical | VIII, 109 S. |
publishDate | 1990 |
publishDateSearch | 1990 |
publishDateSort | 1990 |
record_format | marc |
spelling | Park, Kwangho Verfasser aut Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system by Kwangho Park 1990 VIII, 109 S. txt rdacontent n rdamedia nc rdacarrier Iowa City, Iowa, Univ. of Iowa, Diss. Flexible manufacturing systems Production control Production scheduling (DE-588)4113937-9 Hochschulschrift gnd-content |
spellingShingle | Park, Kwangho Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system Flexible manufacturing systems Production control Production scheduling |
subject_GND | (DE-588)4113937-9 |
title | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |
title_auth | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |
title_exact_search | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |
title_full | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system by Kwangho Park |
title_fullStr | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system by Kwangho Park |
title_full_unstemmed | Multiple resource-constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system by Kwangho Park |
title_short | Multiple resource-constrained project scheduling |
title_sort | multiple resource constrained project scheduling a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |
title_sub | a new exact solution procedure and application of an approximate procedure to scheduling of a flexible manufacturing system |
topic | Flexible manufacturing systems Production control Production scheduling |
topic_facet | Flexible manufacturing systems Production control Production scheduling Hochschulschrift |
work_keys_str_mv | AT parkkwangho multipleresourceconstrainedprojectschedulinganewexactsolutionprocedureandapplicationofanapproximateproceduretoschedulingofaflexiblemanufacturingsystem |