A three-dimensional probabilistic approach to the New Liskeard embankment failure: prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Buch |
Sprache: | Undetermined |
Veröffentlicht: |
Cambridge, Mass.
Massachusetts Inst. of Technology, Dep. of Civil Engineering, Constructed Facilities Div.
1976
|
Beschreibung: | 38 Bl. graph. Darst. |
Internformat
MARC
LEADER | 00000nam a2200000 c 4500 | ||
---|---|---|---|
001 | BV011464012 | ||
003 | DE-604 | ||
005 | 19970915 | ||
007 | t | ||
008 | 970731s1976 d||| |||| 00||| undod | ||
035 | |a (OCoLC)633397601 | ||
035 | |a (DE-599)BVBBV011464012 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | |a und | ||
049 | |a DE-91 | ||
100 | 1 | |a Azzouz, Amr S. |e Verfasser |4 aut | |
245 | 1 | 0 | |a A three-dimensional probabilistic approach to the New Liskeard embankment failure |b prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |c by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse |
264 | 1 | |a Cambridge, Mass. |b Massachusetts Inst. of Technology, Dep. of Civil Engineering, Constructed Facilities Div. |c 1976 | |
300 | |a 38 Bl. |b graph. Darst. | ||
336 | |b txt |2 rdacontent | ||
337 | |b n |2 rdamedia | ||
338 | |b nc |2 rdacarrier | ||
700 | 1 | |a Lee, Lilly C. |e Verfasser |4 aut | |
700 | 1 | |a Lacasse, Suzanne M. |e Verfasser |4 aut | |
999 | |a oai:aleph.bib-bvb.de:BVB01-007711823 |
Datensatz im Suchindex
_version_ | 1804125982467031040 |
---|---|
any_adam_object | |
author | Azzouz, Amr S. Lee, Lilly C. Lacasse, Suzanne M. |
author_facet | Azzouz, Amr S. Lee, Lilly C. Lacasse, Suzanne M. |
author_role | aut aut aut |
author_sort | Azzouz, Amr S. |
author_variant | a s a as asa l c l lc lcl s m l sm sml |
building | Verbundindex |
bvnumber | BV011464012 |
ctrlnum | (OCoLC)633397601 (DE-599)BVBBV011464012 |
format | Book |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01032nam a2200265 c 4500</leader><controlfield tag="001">BV011464012</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">19970915 </controlfield><controlfield tag="007">t</controlfield><controlfield tag="008">970731s1976 d||| |||| 00||| undod</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)633397601</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV011464012</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">und</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-91</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Azzouz, Amr S.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">A three-dimensional probabilistic approach to the New Liskeard embankment failure</subfield><subfield code="b">prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976</subfield><subfield code="c">by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Cambridge, Mass.</subfield><subfield code="b">Massachusetts Inst. of Technology, Dep. of Civil Engineering, Constructed Facilities Div.</subfield><subfield code="c">1976</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">38 Bl.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Lee, Lilly C.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Lacasse, Suzanne M.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-007711823</subfield></datafield></record></collection> |
id | DE-604.BV011464012 |
illustrated | Illustrated |
indexdate | 2024-07-09T18:10:13Z |
institution | BVB |
language | Undetermined |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-007711823 |
oclc_num | 633397601 |
open_access_boolean | |
owner | DE-91 DE-BY-TUM |
owner_facet | DE-91 DE-BY-TUM |
physical | 38 Bl. graph. Darst. |
publishDate | 1976 |
publishDateSearch | 1976 |
publishDateSort | 1976 |
publisher | Massachusetts Inst. of Technology, Dep. of Civil Engineering, Constructed Facilities Div. |
record_format | marc |
spelling | Azzouz, Amr S. Verfasser aut A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse Cambridge, Mass. Massachusetts Inst. of Technology, Dep. of Civil Engineering, Constructed Facilities Div. 1976 38 Bl. graph. Darst. txt rdacontent n rdamedia nc rdacarrier Lee, Lilly C. Verfasser aut Lacasse, Suzanne M. Verfasser aut |
spellingShingle | Azzouz, Amr S. Lee, Lilly C. Lacasse, Suzanne M. A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |
title | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |
title_auth | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |
title_exact_search | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |
title_full | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse |
title_fullStr | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse |
title_full_unstemmed | A three-dimensional probabilistic approach to the New Liskeard embankment failure prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 by Amr S. Azzouz ; Lilly C. Lee ; Suzanne M. Lacasse |
title_short | A three-dimensional probabilistic approach to the New Liskeard embankment failure |
title_sort | a three dimensional probabilistic approach to the new liskeard embankment failure prepared for 1 34s summer program risk and decision in geotechnical engineering 28 june 2 july 1976 |
title_sub | prepared for 1.34S Summer Program Risk and Decision in Geotechnical Engineering, 28 June - 2 July 1976 |
work_keys_str_mv | AT azzouzamrs athreedimensionalprobabilisticapproachtothenewliskeardembankmentfailurepreparedfor134ssummerprogramriskanddecisioningeotechnicalengineering28june2july1976 AT leelillyc athreedimensionalprobabilisticapproachtothenewliskeardembankmentfailurepreparedfor134ssummerprogramriskanddecisioningeotechnicalengineering28june2july1976 AT lacassesuzannem athreedimensionalprobabilisticapproachtothenewliskeardembankmentfailurepreparedfor134ssummerprogramriskanddecisioningeotechnicalengineering28june2july1976 |