Estimating for builders and surveyors /:
Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular e...
Gespeichert in:
1. Verfasser: | |
---|---|
Weitere Verfasser: | , |
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Oxford :
Butterworth-Heinemann,
[2003]
|
Ausgabe: | Second edition. |
Schlagworte: | |
Online-Zugang: | Volltext |
Zusammenfassung: | Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating. |
Beschreibung: | Previous edition published as: Estimating for builders and quantity surveyors / R.D. Buchan, F.W. Fleming and J.R. Kelly : Oxford : Newnes, 1991. Includes index. |
Beschreibung: | 1 online resource (ix, 310 pages) : illustrations |
ISBN: | 9781136405082 1136405089 9780080505954 0080505953 |
Internformat
MARC
LEADER | 00000cam a2200000 i 4500 | ||
---|---|---|---|
001 | ZDB-4-EBA-ocn894227397 | ||
003 | OCoLC | ||
005 | 20241004212047.0 | ||
006 | m o d | ||
007 | cr cnu---unuuu | ||
008 | 141103s2003 enka o 001 0 eng d | ||
040 | |a N$T |b eng |e rda |e pn |c N$T |d E7B |d UBY |d OCLCF |d YDXCP |d OCLCQ |d OCL |d Z5A |d U3W |d OCLCQ |d YDX |d OCLCO |d OCLCA |d UKAHL |d OCLCA |d UHL |d K6U |d OCLCA |d UKCRE |d INARC |d OCLCQ |d OCLCO |d OCLCQ |d SFB |d OCLCO |d OCLCQ |d OCLCO |d OCLCL | ||
019 | |a 505145828 |a 648315836 |a 1078942941 |a 1113254820 |a 1153486679 |a 1160047633 | ||
020 | |a 9781136405082 |q (electronic bk.) | ||
020 | |a 1136405089 |q (electronic bk.) | ||
020 | |a 9780080505954 |q (electronic bk.) | ||
020 | |a 0080505953 |q (electronic bk.) | ||
020 | |z 0750642718 | ||
020 | |z 9780750642712 | ||
035 | |a (OCoLC)894227397 |z (OCoLC)505145828 |z (OCoLC)648315836 |z (OCoLC)1078942941 |z (OCoLC)1113254820 |z (OCoLC)1153486679 |z (OCoLC)1160047633 | ||
043 | |a e-uk--- | ||
050 | 4 | |a TH435 |b .B835 2003eb | |
072 | 7 | |a TEC |x 005000 |2 bisacsh | |
082 | 7 | |a 692.5 |2 22 | |
049 | |a MAIN | ||
100 | 1 | |a Buchan, R. D. | |
245 | 1 | 0 | |a Estimating for builders and surveyors / |c Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. |
250 | |a Second edition. | ||
264 | 1 | |a Oxford : |b Butterworth-Heinemann, |c [2003] | |
264 | 4 | |c ©2003 | |
300 | |a 1 online resource (ix, 310 pages) : |b illustrations | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
500 | |a Previous edition published as: Estimating for builders and quantity surveyors / R.D. Buchan, F.W. Fleming and J.R. Kelly : Oxford : Newnes, 1991. | ||
500 | |a Includes index. | ||
588 | 0 | |a Print version record. | |
505 | 0 | 0 | |t Author's note -- |t Note -- |g 1. |t Introduction -- |t The UK construction industry -- |t Introduction to estimating -- |t The invitation to tender -- |t The estimating method -- |t Tender procedure -- |t Negotiated tender -- |t Selective tendering for design and build -- |g 2. |t The cost of labour -- |t The all-in hourly rate -- |t The Working Rules -- |t Estimating the cost of labour -- |t Entitlement to basic and additional rates of pay -- |t Work in difficult conditions -- |t Bonus -- |t Working hours -- |t Overtime -- |t Daily fare and travel allowance -- |t Rotary shift working -- |t Night work -- |t Continuous working -- |t Tide work. |
505 | 0 | 0 | |t Tunnel workRefuelling, servicing, maintenance and repairs -- |t Storage of tools -- |t Loss of clothing -- |t Transfer arrangements -- |t Subsistence allowance -- |t Periodic leave -- |t Guaranteed minimum weekly earnings -- |t Annual holidays -- |t Sick pay -- |t Benefit schemes -- |t Scaffolders -- |t Employer's Contributions for National Insurance -- |t Employer's liability insurance -- |t Construction Industry Training Board levy -- |t Redundancy funding -- |t Supervision: foremen, chargehands, gangers -- |t Bonus, incentive and productivity schemes -- |t Excess overtime allowance -- |t Practical estimating -- |g 3. |t Mechanical plant -- |t Introduction -- |t Purchase or hire -- |t The plant rate. |
505 | 0 | 0 | |t DepreciationLife of plant -- |t Hours worked per annum -- |t Repairs and renewals -- |t Tracks and tyres -- |t Inflation -- |t Summary -- |g 4. |t Preliminaries -- |t Introduction -- |t Project particulars -- |t Tender and contract documents -- |t The site/existing buildings -- |t Description of the works -- |t The contract/sub-contract -- |t Employer's requirements -- |t Contractor's cost items -- |t Nominated subcontractors -- |t Provisional work items -- |t Dayworks -- |t Collection of example costs -- |g 5. |t Excavation and filling -- |t Site preparation -- |t Lifting turf for preservation -- |t Excavation: general remarks -- |t Hand excavation -- |t Depth and throw -- |t Soil conditions -- |t Outputs -- |t Machine excavation. |
505 | 0 | 0 | |t Ground waterServices -- |t Breaking out -- |t Working space -- |t Earthwork support -- |t Disposal of water -- |t Disposal of excavated material -- |t Filling to excavations -- |t Surface packing -- |t Surface treatments -- |g 6. |t Concrete work -- |t In situ concrete -- |t Materials -- |t Weights and volumes -- |t Shrinkage in concrete mix -- |t Costing for shrinkage -- |t Mixer costs -- |g Lab our. |t costs -- |t Reinforcement for in situ concrete -- |t Formwork -- |t Precast concrete -- |g 7. |t Brickwork and blockwork -- |t Introduction -- |t Mortar -- |t Bricks per wall area -- |g Lab our. |t costs -- |t Common brickwork -- |t Brickwork sundries -- |t Facing brickwork -- |t Jointing and pointing -- |t Special brickwork -- |t Blockwork -- |g 8. |t Underpinning. |
505 | 0 | 0 | |t IntroductionShoring -- |t Underpinning -- |g 9. |t Roof coverings -- |t Slate roofing -- |t Tile roofing -- |t Clay plain roof tiles -- |t Concrete roofing tiles -- |t Lead sheet coverings and flashings -- |t Fixing accessories for external leadwork -- |g 10. |t Asphalt work -- |t Introduction -- |t Plant -- |t Materials -- |g Lab our. -- |t Wastage -- |t Building-up rates -- |g 11. |t Woodwork carpentry: first fixings -- |t Special requirements -- |t Timber sizes and costs -- |t Fastenings and adhesives -- |g Lab our. |t constants -- |t Examples of rates calculation -- |g 12. |t Woodwork joinery: second fixings and finishings -- |t Introduction -- |g 13. |t Structural steelwork and metalwork -- |t Introduction. |
505 | 0 | 0 | |t Isolated structural metal members (G12). |
520 | |a Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating. | ||
650 | 0 | |a Building |x Estimates |z Great Britain. | |
650 | 6 | |a Construction |x Devis estimatifs |z Grande-Bretagne. | |
650 | 7 | |a TECHNOLOGY & ENGINEERING |x Construction |x General. |2 bisacsh | |
650 | 7 | |a Building |x Estimates |2 fast | |
651 | 7 | |a Great Britain |2 fast |1 https://id.oclc.org/worldcat/entity/E39PBJdmp7p3cx8hpmJ8HvmTpP | |
650 | 7 | |a Sachverständiger |2 gnd | |
650 | 7 | |a Kostenrechnung |2 gnd |0 http://d-nb.info/gnd/4032592-1 | |
650 | 7 | |a Bauablauf |2 gnd | |
651 | 7 | |a Großbritannien |2 gnd | |
700 | 1 | |a Grant, Fiona E. K. | |
700 | 1 | |a Fleming, F. W. | |
700 | 1 | |a Buchan, R. D. |t Estimating for builders and quantity surveyors. | |
776 | 0 | 8 | |i Print version: |a Buchan, R.D. |t Estimating for builders and surveyors. |b Second edition |z 0750642718 |w (OCoLC)49044253 |
856 | 4 | 0 | |l FWS01 |p ZDB-4-EBA |q FWS_PDA_EBA |u https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=881334 |3 Volltext |
938 | |a Askews and Holts Library Services |b ASKH |n AH23085106 | ||
938 | |a Askews and Holts Library Services |b ASKH |n AH23061250 | ||
938 | |a ebrary |b EBRY |n ebr10188591 | ||
938 | |a EBSCOhost |b EBSC |n 881334 | ||
938 | |a Internet Archive |b INAR |n estimatingforbui0000buch | ||
938 | |a YBP Library Services |b YANK |n 17889070 | ||
938 | |a YBP Library Services |b YANK |n 12147442 | ||
938 | |a YBP Library Services |b YANK |n 2613912 | ||
994 | |a 92 |b GEBAY | ||
912 | |a ZDB-4-EBA | ||
049 | |a DE-863 |
Datensatz im Suchindex
DE-BY-FWS_katkey | ZDB-4-EBA-ocn894227397 |
---|---|
_version_ | 1816882292471103489 |
adam_text | |
any_adam_object | |
author | Buchan, R. D. |
author2 | Grant, Fiona E. K. Fleming, F. W. Buchan, R. D. |
author2_role | |
author2_variant | f e k g fek fekg f w f fw fwf r d b rd rdb |
author_facet | Buchan, R. D. Grant, Fiona E. K. Fleming, F. W. Buchan, R. D. |
author_role | |
author_sort | Buchan, R. D. |
author_variant | r d b rd rdb |
building | Verbundindex |
bvnumber | localFWS |
callnumber-first | T - Technology |
callnumber-label | TH435 |
callnumber-raw | TH435 .B835 2003eb |
callnumber-search | TH435 .B835 2003eb |
callnumber-sort | TH 3435 B835 42003EB |
callnumber-subject | TH - Building Construction |
collection | ZDB-4-EBA |
contents | Author's note -- Note -- Introduction -- The UK construction industry -- Introduction to estimating -- The invitation to tender -- The estimating method -- Tender procedure -- Negotiated tender -- Selective tendering for design and build -- The cost of labour -- The all-in hourly rate -- The Working Rules -- Estimating the cost of labour -- Entitlement to basic and additional rates of pay -- Work in difficult conditions -- Bonus -- Working hours -- Overtime -- Daily fare and travel allowance -- Rotary shift working -- Night work -- Continuous working -- Tide work. Tunnel workRefuelling, servicing, maintenance and repairs -- Storage of tools -- Loss of clothing -- Transfer arrangements -- Subsistence allowance -- Periodic leave -- Guaranteed minimum weekly earnings -- Annual holidays -- Sick pay -- Benefit schemes -- Scaffolders -- Employer's Contributions for National Insurance -- Employer's liability insurance -- Construction Industry Training Board levy -- Redundancy funding -- Supervision: foremen, chargehands, gangers -- Bonus, incentive and productivity schemes -- Excess overtime allowance -- Practical estimating -- Mechanical plant -- Purchase or hire -- The plant rate. DepreciationLife of plant -- Hours worked per annum -- Repairs and renewals -- Tracks and tyres -- Inflation -- Summary -- Preliminaries -- Project particulars -- Tender and contract documents -- The site/existing buildings -- Description of the works -- The contract/sub-contract -- Employer's requirements -- Contractor's cost items -- Nominated subcontractors -- Provisional work items -- Dayworks -- Collection of example costs -- Excavation and filling -- Site preparation -- Lifting turf for preservation -- Excavation: general remarks -- Hand excavation -- Depth and throw -- Soil conditions -- Outputs -- Machine excavation. Ground waterServices -- Breaking out -- Working space -- Earthwork support -- Disposal of water -- Disposal of excavated material -- Filling to excavations -- Surface packing -- Surface treatments -- Concrete work -- In situ concrete -- Materials -- Weights and volumes -- Shrinkage in concrete mix -- Costing for shrinkage -- Mixer costs -- costs -- Reinforcement for in situ concrete -- Formwork -- Precast concrete -- Brickwork and blockwork -- Mortar -- Bricks per wall area -- Common brickwork -- Brickwork sundries -- Facing brickwork -- Jointing and pointing -- Special brickwork -- Blockwork -- Underpinning. IntroductionShoring -- Underpinning -- Roof coverings -- Slate roofing -- Tile roofing -- Clay plain roof tiles -- Concrete roofing tiles -- Lead sheet coverings and flashings -- Fixing accessories for external leadwork -- Asphalt work -- Plant -- Wastage -- Building-up rates -- Woodwork carpentry: first fixings -- Special requirements -- Timber sizes and costs -- Fastenings and adhesives -- constants -- Examples of rates calculation -- Woodwork joinery: second fixings and finishings -- Structural steelwork and metalwork -- Introduction. Isolated structural metal members (G12). |
ctrlnum | (OCoLC)894227397 |
dewey-full | 692.5 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 692 - Auxiliary construction practices |
dewey-raw | 692.5 |
dewey-search | 692.5 |
dewey-sort | 3692.5 |
dewey-tens | 690 - Construction of buildings |
discipline | Bauingenieurwesen |
edition | Second edition. |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>07075cam a2200769 i 4500</leader><controlfield tag="001">ZDB-4-EBA-ocn894227397</controlfield><controlfield tag="003">OCoLC</controlfield><controlfield tag="005">20241004212047.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr cnu---unuuu</controlfield><controlfield tag="008">141103s2003 enka o 001 0 eng d</controlfield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">N$T</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">N$T</subfield><subfield code="d">E7B</subfield><subfield code="d">UBY</subfield><subfield code="d">OCLCF</subfield><subfield code="d">YDXCP</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCL</subfield><subfield code="d">Z5A</subfield><subfield code="d">U3W</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">YDX</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCA</subfield><subfield code="d">UKAHL</subfield><subfield code="d">OCLCA</subfield><subfield code="d">UHL</subfield><subfield code="d">K6U</subfield><subfield code="d">OCLCA</subfield><subfield code="d">UKCRE</subfield><subfield code="d">INARC</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">SFB</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCQ</subfield><subfield code="d">OCLCO</subfield><subfield code="d">OCLCL</subfield></datafield><datafield tag="019" ind1=" " ind2=" "><subfield code="a">505145828</subfield><subfield code="a">648315836</subfield><subfield code="a">1078942941</subfield><subfield code="a">1113254820</subfield><subfield code="a">1153486679</subfield><subfield code="a">1160047633</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781136405082</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">1136405089</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780080505954</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0080505953</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">0750642718</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9780750642712</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)894227397</subfield><subfield code="z">(OCoLC)505145828</subfield><subfield code="z">(OCoLC)648315836</subfield><subfield code="z">(OCoLC)1078942941</subfield><subfield code="z">(OCoLC)1113254820</subfield><subfield code="z">(OCoLC)1153486679</subfield><subfield code="z">(OCoLC)1160047633</subfield></datafield><datafield tag="043" ind1=" " ind2=" "><subfield code="a">e-uk---</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH435</subfield><subfield code="b">.B835 2003eb</subfield></datafield><datafield tag="072" ind1=" " ind2="7"><subfield code="a">TEC</subfield><subfield code="x">005000</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="082" ind1="7" ind2=" "><subfield code="a">692.5</subfield><subfield code="2">22</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">MAIN</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Buchan, R. D.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Estimating for builders and surveyors /</subfield><subfield code="c">Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant.</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">Second edition.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Oxford :</subfield><subfield code="b">Butterworth-Heinemann,</subfield><subfield code="c">[2003]</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">©2003</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (ix, 310 pages) :</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Previous edition published as: Estimating for builders and quantity surveyors / R.D. Buchan, F.W. Fleming and J.R. Kelly : Oxford : Newnes, 1991.</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Includes index.</subfield></datafield><datafield tag="588" ind1="0" ind2=" "><subfield code="a">Print version record.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">Author's note --</subfield><subfield code="t">Note --</subfield><subfield code="g">1.</subfield><subfield code="t">Introduction --</subfield><subfield code="t">The UK construction industry --</subfield><subfield code="t">Introduction to estimating --</subfield><subfield code="t">The invitation to tender --</subfield><subfield code="t">The estimating method --</subfield><subfield code="t">Tender procedure --</subfield><subfield code="t">Negotiated tender --</subfield><subfield code="t">Selective tendering for design and build --</subfield><subfield code="g">2.</subfield><subfield code="t">The cost of labour --</subfield><subfield code="t">The all-in hourly rate --</subfield><subfield code="t">The Working Rules --</subfield><subfield code="t">Estimating the cost of labour --</subfield><subfield code="t">Entitlement to basic and additional rates of pay --</subfield><subfield code="t">Work in difficult conditions --</subfield><subfield code="t">Bonus --</subfield><subfield code="t">Working hours --</subfield><subfield code="t">Overtime --</subfield><subfield code="t">Daily fare and travel allowance --</subfield><subfield code="t">Rotary shift working --</subfield><subfield code="t">Night work --</subfield><subfield code="t">Continuous working --</subfield><subfield code="t">Tide work.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">Tunnel workRefuelling, servicing, maintenance and repairs --</subfield><subfield code="t">Storage of tools --</subfield><subfield code="t">Loss of clothing --</subfield><subfield code="t">Transfer arrangements --</subfield><subfield code="t">Subsistence allowance --</subfield><subfield code="t">Periodic leave --</subfield><subfield code="t">Guaranteed minimum weekly earnings --</subfield><subfield code="t">Annual holidays --</subfield><subfield code="t">Sick pay --</subfield><subfield code="t">Benefit schemes --</subfield><subfield code="t">Scaffolders --</subfield><subfield code="t">Employer's Contributions for National Insurance --</subfield><subfield code="t">Employer's liability insurance --</subfield><subfield code="t">Construction Industry Training Board levy --</subfield><subfield code="t">Redundancy funding --</subfield><subfield code="t">Supervision: foremen, chargehands, gangers --</subfield><subfield code="t">Bonus, incentive and productivity schemes --</subfield><subfield code="t">Excess overtime allowance --</subfield><subfield code="t">Practical estimating --</subfield><subfield code="g">3.</subfield><subfield code="t">Mechanical plant --</subfield><subfield code="t">Introduction --</subfield><subfield code="t">Purchase or hire --</subfield><subfield code="t">The plant rate.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">DepreciationLife of plant --</subfield><subfield code="t">Hours worked per annum --</subfield><subfield code="t">Repairs and renewals --</subfield><subfield code="t">Tracks and tyres --</subfield><subfield code="t">Inflation --</subfield><subfield code="t">Summary --</subfield><subfield code="g">4.</subfield><subfield code="t">Preliminaries --</subfield><subfield code="t">Introduction --</subfield><subfield code="t">Project particulars --</subfield><subfield code="t">Tender and contract documents --</subfield><subfield code="t">The site/existing buildings --</subfield><subfield code="t">Description of the works --</subfield><subfield code="t">The contract/sub-contract --</subfield><subfield code="t">Employer's requirements --</subfield><subfield code="t">Contractor's cost items --</subfield><subfield code="t">Nominated subcontractors --</subfield><subfield code="t">Provisional work items --</subfield><subfield code="t">Dayworks --</subfield><subfield code="t">Collection of example costs --</subfield><subfield code="g">5.</subfield><subfield code="t">Excavation and filling --</subfield><subfield code="t">Site preparation --</subfield><subfield code="t">Lifting turf for preservation --</subfield><subfield code="t">Excavation: general remarks --</subfield><subfield code="t">Hand excavation --</subfield><subfield code="t">Depth and throw --</subfield><subfield code="t">Soil conditions --</subfield><subfield code="t">Outputs --</subfield><subfield code="t">Machine excavation.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">Ground waterServices --</subfield><subfield code="t">Breaking out --</subfield><subfield code="t">Working space --</subfield><subfield code="t">Earthwork support --</subfield><subfield code="t">Disposal of water --</subfield><subfield code="t">Disposal of excavated material --</subfield><subfield code="t">Filling to excavations --</subfield><subfield code="t">Surface packing --</subfield><subfield code="t">Surface treatments --</subfield><subfield code="g">6.</subfield><subfield code="t">Concrete work --</subfield><subfield code="t">In situ concrete --</subfield><subfield code="t">Materials --</subfield><subfield code="t">Weights and volumes --</subfield><subfield code="t">Shrinkage in concrete mix --</subfield><subfield code="t">Costing for shrinkage --</subfield><subfield code="t">Mixer costs --</subfield><subfield code="g">Lab our.</subfield><subfield code="t">costs --</subfield><subfield code="t">Reinforcement for in situ concrete --</subfield><subfield code="t">Formwork --</subfield><subfield code="t">Precast concrete --</subfield><subfield code="g">7.</subfield><subfield code="t">Brickwork and blockwork --</subfield><subfield code="t">Introduction --</subfield><subfield code="t">Mortar --</subfield><subfield code="t">Bricks per wall area --</subfield><subfield code="g">Lab our.</subfield><subfield code="t">costs --</subfield><subfield code="t">Common brickwork --</subfield><subfield code="t">Brickwork sundries --</subfield><subfield code="t">Facing brickwork --</subfield><subfield code="t">Jointing and pointing --</subfield><subfield code="t">Special brickwork --</subfield><subfield code="t">Blockwork --</subfield><subfield code="g">8.</subfield><subfield code="t">Underpinning.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">IntroductionShoring --</subfield><subfield code="t">Underpinning --</subfield><subfield code="g">9.</subfield><subfield code="t">Roof coverings --</subfield><subfield code="t">Slate roofing --</subfield><subfield code="t">Tile roofing --</subfield><subfield code="t">Clay plain roof tiles --</subfield><subfield code="t">Concrete roofing tiles --</subfield><subfield code="t">Lead sheet coverings and flashings --</subfield><subfield code="t">Fixing accessories for external leadwork --</subfield><subfield code="g">10.</subfield><subfield code="t">Asphalt work --</subfield><subfield code="t">Introduction --</subfield><subfield code="t">Plant --</subfield><subfield code="t">Materials --</subfield><subfield code="g">Lab our. --</subfield><subfield code="t">Wastage --</subfield><subfield code="t">Building-up rates --</subfield><subfield code="g">11.</subfield><subfield code="t">Woodwork carpentry: first fixings --</subfield><subfield code="t">Special requirements --</subfield><subfield code="t">Timber sizes and costs --</subfield><subfield code="t">Fastenings and adhesives --</subfield><subfield code="g">Lab our.</subfield><subfield code="t">constants --</subfield><subfield code="t">Examples of rates calculation --</subfield><subfield code="g">12.</subfield><subfield code="t">Woodwork joinery: second fixings and finishings --</subfield><subfield code="t">Introduction --</subfield><subfield code="g">13.</subfield><subfield code="t">Structural steelwork and metalwork --</subfield><subfield code="t">Introduction.</subfield></datafield><datafield tag="505" ind1="0" ind2="0"><subfield code="t">Isolated structural metal members (G12).</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Building</subfield><subfield code="x">Estimates</subfield><subfield code="z">Great Britain.</subfield></datafield><datafield tag="650" ind1=" " ind2="6"><subfield code="a">Construction</subfield><subfield code="x">Devis estimatifs</subfield><subfield code="z">Grande-Bretagne.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING</subfield><subfield code="x">Construction</subfield><subfield code="x">General.</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Building</subfield><subfield code="x">Estimates</subfield><subfield code="2">fast</subfield></datafield><datafield tag="651" ind1=" " ind2="7"><subfield code="a">Great Britain</subfield><subfield code="2">fast</subfield><subfield code="1">https://id.oclc.org/worldcat/entity/E39PBJdmp7p3cx8hpmJ8HvmTpP</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Sachverständiger</subfield><subfield code="2">gnd</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Kostenrechnung</subfield><subfield code="2">gnd</subfield><subfield code="0">http://d-nb.info/gnd/4032592-1</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Bauablauf</subfield><subfield code="2">gnd</subfield></datafield><datafield tag="651" ind1=" " ind2="7"><subfield code="a">Großbritannien</subfield><subfield code="2">gnd</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Grant, Fiona E. K.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Fleming, F. W.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Buchan, R. D.</subfield><subfield code="t">Estimating for builders and quantity surveyors.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Buchan, R.D.</subfield><subfield code="t">Estimating for builders and surveyors.</subfield><subfield code="b">Second edition</subfield><subfield code="z">0750642718</subfield><subfield code="w">(OCoLC)49044253</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="l">FWS01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FWS_PDA_EBA</subfield><subfield code="u">https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=881334</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">Askews and Holts Library Services</subfield><subfield code="b">ASKH</subfield><subfield code="n">AH23085106</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">Askews and Holts Library Services</subfield><subfield code="b">ASKH</subfield><subfield code="n">AH23061250</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">ebrary</subfield><subfield code="b">EBRY</subfield><subfield code="n">ebr10188591</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">EBSCOhost</subfield><subfield code="b">EBSC</subfield><subfield code="n">881334</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">Internet Archive</subfield><subfield code="b">INAR</subfield><subfield code="n">estimatingforbui0000buch</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">17889070</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">12147442</subfield></datafield><datafield tag="938" ind1=" " ind2=" "><subfield code="a">YBP Library Services</subfield><subfield code="b">YANK</subfield><subfield code="n">2613912</subfield></datafield><datafield tag="994" ind1=" " ind2=" "><subfield code="a">92</subfield><subfield code="b">GEBAY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-863</subfield></datafield></record></collection> |
geographic | Great Britain fast https://id.oclc.org/worldcat/entity/E39PBJdmp7p3cx8hpmJ8HvmTpP Großbritannien gnd |
geographic_facet | Great Britain Großbritannien |
id | ZDB-4-EBA-ocn894227397 |
illustrated | Illustrated |
indexdate | 2024-11-27T13:26:18Z |
institution | BVB |
isbn | 9781136405082 1136405089 9780080505954 0080505953 |
language | English |
oclc_num | 894227397 |
open_access_boolean | |
owner | MAIN DE-863 DE-BY-FWS |
owner_facet | MAIN DE-863 DE-BY-FWS |
physical | 1 online resource (ix, 310 pages) : illustrations |
psigel | ZDB-4-EBA |
publishDate | 2003 |
publishDateSearch | 2003 |
publishDateSort | 2003 |
publisher | Butterworth-Heinemann, |
record_format | marc |
spelling | Buchan, R. D. Estimating for builders and surveyors / Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. Second edition. Oxford : Butterworth-Heinemann, [2003] ©2003 1 online resource (ix, 310 pages) : illustrations text txt rdacontent computer c rdamedia online resource cr rdacarrier Previous edition published as: Estimating for builders and quantity surveyors / R.D. Buchan, F.W. Fleming and J.R. Kelly : Oxford : Newnes, 1991. Includes index. Print version record. Author's note -- Note -- 1. Introduction -- The UK construction industry -- Introduction to estimating -- The invitation to tender -- The estimating method -- Tender procedure -- Negotiated tender -- Selective tendering for design and build -- 2. The cost of labour -- The all-in hourly rate -- The Working Rules -- Estimating the cost of labour -- Entitlement to basic and additional rates of pay -- Work in difficult conditions -- Bonus -- Working hours -- Overtime -- Daily fare and travel allowance -- Rotary shift working -- Night work -- Continuous working -- Tide work. Tunnel workRefuelling, servicing, maintenance and repairs -- Storage of tools -- Loss of clothing -- Transfer arrangements -- Subsistence allowance -- Periodic leave -- Guaranteed minimum weekly earnings -- Annual holidays -- Sick pay -- Benefit schemes -- Scaffolders -- Employer's Contributions for National Insurance -- Employer's liability insurance -- Construction Industry Training Board levy -- Redundancy funding -- Supervision: foremen, chargehands, gangers -- Bonus, incentive and productivity schemes -- Excess overtime allowance -- Practical estimating -- 3. Mechanical plant -- Introduction -- Purchase or hire -- The plant rate. DepreciationLife of plant -- Hours worked per annum -- Repairs and renewals -- Tracks and tyres -- Inflation -- Summary -- 4. Preliminaries -- Introduction -- Project particulars -- Tender and contract documents -- The site/existing buildings -- Description of the works -- The contract/sub-contract -- Employer's requirements -- Contractor's cost items -- Nominated subcontractors -- Provisional work items -- Dayworks -- Collection of example costs -- 5. Excavation and filling -- Site preparation -- Lifting turf for preservation -- Excavation: general remarks -- Hand excavation -- Depth and throw -- Soil conditions -- Outputs -- Machine excavation. Ground waterServices -- Breaking out -- Working space -- Earthwork support -- Disposal of water -- Disposal of excavated material -- Filling to excavations -- Surface packing -- Surface treatments -- 6. Concrete work -- In situ concrete -- Materials -- Weights and volumes -- Shrinkage in concrete mix -- Costing for shrinkage -- Mixer costs -- Lab our. costs -- Reinforcement for in situ concrete -- Formwork -- Precast concrete -- 7. Brickwork and blockwork -- Introduction -- Mortar -- Bricks per wall area -- Lab our. costs -- Common brickwork -- Brickwork sundries -- Facing brickwork -- Jointing and pointing -- Special brickwork -- Blockwork -- 8. Underpinning. IntroductionShoring -- Underpinning -- 9. Roof coverings -- Slate roofing -- Tile roofing -- Clay plain roof tiles -- Concrete roofing tiles -- Lead sheet coverings and flashings -- Fixing accessories for external leadwork -- 10. Asphalt work -- Introduction -- Plant -- Materials -- Lab our. -- Wastage -- Building-up rates -- 11. Woodwork carpentry: first fixings -- Special requirements -- Timber sizes and costs -- Fastenings and adhesives -- Lab our. constants -- Examples of rates calculation -- 12. Woodwork joinery: second fixings and finishings -- Introduction -- 13. Structural steelwork and metalwork -- Introduction. Isolated structural metal members (G12). Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating. Building Estimates Great Britain. Construction Devis estimatifs Grande-Bretagne. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Estimates fast Great Britain fast https://id.oclc.org/worldcat/entity/E39PBJdmp7p3cx8hpmJ8HvmTpP Sachverständiger gnd Kostenrechnung gnd http://d-nb.info/gnd/4032592-1 Bauablauf gnd Großbritannien gnd Grant, Fiona E. K. Fleming, F. W. Buchan, R. D. Estimating for builders and quantity surveyors. Print version: Buchan, R.D. Estimating for builders and surveyors. Second edition 0750642718 (OCoLC)49044253 FWS01 ZDB-4-EBA FWS_PDA_EBA https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=881334 Volltext |
spellingShingle | Buchan, R. D. Estimating for builders and surveyors / Author's note -- Note -- Introduction -- The UK construction industry -- Introduction to estimating -- The invitation to tender -- The estimating method -- Tender procedure -- Negotiated tender -- Selective tendering for design and build -- The cost of labour -- The all-in hourly rate -- The Working Rules -- Estimating the cost of labour -- Entitlement to basic and additional rates of pay -- Work in difficult conditions -- Bonus -- Working hours -- Overtime -- Daily fare and travel allowance -- Rotary shift working -- Night work -- Continuous working -- Tide work. Tunnel workRefuelling, servicing, maintenance and repairs -- Storage of tools -- Loss of clothing -- Transfer arrangements -- Subsistence allowance -- Periodic leave -- Guaranteed minimum weekly earnings -- Annual holidays -- Sick pay -- Benefit schemes -- Scaffolders -- Employer's Contributions for National Insurance -- Employer's liability insurance -- Construction Industry Training Board levy -- Redundancy funding -- Supervision: foremen, chargehands, gangers -- Bonus, incentive and productivity schemes -- Excess overtime allowance -- Practical estimating -- Mechanical plant -- Purchase or hire -- The plant rate. DepreciationLife of plant -- Hours worked per annum -- Repairs and renewals -- Tracks and tyres -- Inflation -- Summary -- Preliminaries -- Project particulars -- Tender and contract documents -- The site/existing buildings -- Description of the works -- The contract/sub-contract -- Employer's requirements -- Contractor's cost items -- Nominated subcontractors -- Provisional work items -- Dayworks -- Collection of example costs -- Excavation and filling -- Site preparation -- Lifting turf for preservation -- Excavation: general remarks -- Hand excavation -- Depth and throw -- Soil conditions -- Outputs -- Machine excavation. Ground waterServices -- Breaking out -- Working space -- Earthwork support -- Disposal of water -- Disposal of excavated material -- Filling to excavations -- Surface packing -- Surface treatments -- Concrete work -- In situ concrete -- Materials -- Weights and volumes -- Shrinkage in concrete mix -- Costing for shrinkage -- Mixer costs -- costs -- Reinforcement for in situ concrete -- Formwork -- Precast concrete -- Brickwork and blockwork -- Mortar -- Bricks per wall area -- Common brickwork -- Brickwork sundries -- Facing brickwork -- Jointing and pointing -- Special brickwork -- Blockwork -- Underpinning. IntroductionShoring -- Underpinning -- Roof coverings -- Slate roofing -- Tile roofing -- Clay plain roof tiles -- Concrete roofing tiles -- Lead sheet coverings and flashings -- Fixing accessories for external leadwork -- Asphalt work -- Plant -- Wastage -- Building-up rates -- Woodwork carpentry: first fixings -- Special requirements -- Timber sizes and costs -- Fastenings and adhesives -- constants -- Examples of rates calculation -- Woodwork joinery: second fixings and finishings -- Structural steelwork and metalwork -- Introduction. Isolated structural metal members (G12). Building Estimates Great Britain. Construction Devis estimatifs Grande-Bretagne. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Estimates fast Sachverständiger gnd Kostenrechnung gnd http://d-nb.info/gnd/4032592-1 Bauablauf gnd |
subject_GND | http://d-nb.info/gnd/4032592-1 |
title | Estimating for builders and surveyors / |
title_alt | Author's note -- Note -- Introduction -- The UK construction industry -- Introduction to estimating -- The invitation to tender -- The estimating method -- Tender procedure -- Negotiated tender -- Selective tendering for design and build -- The cost of labour -- The all-in hourly rate -- The Working Rules -- Estimating the cost of labour -- Entitlement to basic and additional rates of pay -- Work in difficult conditions -- Bonus -- Working hours -- Overtime -- Daily fare and travel allowance -- Rotary shift working -- Night work -- Continuous working -- Tide work. Tunnel workRefuelling, servicing, maintenance and repairs -- Storage of tools -- Loss of clothing -- Transfer arrangements -- Subsistence allowance -- Periodic leave -- Guaranteed minimum weekly earnings -- Annual holidays -- Sick pay -- Benefit schemes -- Scaffolders -- Employer's Contributions for National Insurance -- Employer's liability insurance -- Construction Industry Training Board levy -- Redundancy funding -- Supervision: foremen, chargehands, gangers -- Bonus, incentive and productivity schemes -- Excess overtime allowance -- Practical estimating -- Mechanical plant -- Purchase or hire -- The plant rate. DepreciationLife of plant -- Hours worked per annum -- Repairs and renewals -- Tracks and tyres -- Inflation -- Summary -- Preliminaries -- Project particulars -- Tender and contract documents -- The site/existing buildings -- Description of the works -- The contract/sub-contract -- Employer's requirements -- Contractor's cost items -- Nominated subcontractors -- Provisional work items -- Dayworks -- Collection of example costs -- Excavation and filling -- Site preparation -- Lifting turf for preservation -- Excavation: general remarks -- Hand excavation -- Depth and throw -- Soil conditions -- Outputs -- Machine excavation. Ground waterServices -- Breaking out -- Working space -- Earthwork support -- Disposal of water -- Disposal of excavated material -- Filling to excavations -- Surface packing -- Surface treatments -- Concrete work -- In situ concrete -- Materials -- Weights and volumes -- Shrinkage in concrete mix -- Costing for shrinkage -- Mixer costs -- costs -- Reinforcement for in situ concrete -- Formwork -- Precast concrete -- Brickwork and blockwork -- Mortar -- Bricks per wall area -- Common brickwork -- Brickwork sundries -- Facing brickwork -- Jointing and pointing -- Special brickwork -- Blockwork -- Underpinning. IntroductionShoring -- Underpinning -- Roof coverings -- Slate roofing -- Tile roofing -- Clay plain roof tiles -- Concrete roofing tiles -- Lead sheet coverings and flashings -- Fixing accessories for external leadwork -- Asphalt work -- Plant -- Wastage -- Building-up rates -- Woodwork carpentry: first fixings -- Special requirements -- Timber sizes and costs -- Fastenings and adhesives -- constants -- Examples of rates calculation -- Woodwork joinery: second fixings and finishings -- Structural steelwork and metalwork -- Introduction. Isolated structural metal members (G12). Estimating for builders and quantity surveyors. |
title_auth | Estimating for builders and surveyors / |
title_exact_search | Estimating for builders and surveyors / |
title_full | Estimating for builders and surveyors / Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. |
title_fullStr | Estimating for builders and surveyors / Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. |
title_full_unstemmed | Estimating for builders and surveyors / Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. |
title_short | Estimating for builders and surveyors / |
title_sort | estimating for builders and surveyors |
topic | Building Estimates Great Britain. Construction Devis estimatifs Grande-Bretagne. TECHNOLOGY & ENGINEERING Construction General. bisacsh Building Estimates fast Sachverständiger gnd Kostenrechnung gnd http://d-nb.info/gnd/4032592-1 Bauablauf gnd |
topic_facet | Building Estimates Great Britain. Construction Devis estimatifs Grande-Bretagne. TECHNOLOGY & ENGINEERING Construction General. Building Estimates Great Britain Sachverständiger Kostenrechnung Bauablauf Großbritannien |
url | https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=881334 |
work_keys_str_mv | AT buchanrd estimatingforbuildersandsurveyors AT grantfionaek estimatingforbuildersandsurveyors AT flemingfw estimatingforbuildersandsurveyors |